How to fill in the quality inspection report of the 3 meter high sound barrier

Updated on Financial 2024-02-09
12 answers
  1. Anonymous users2024-02-05

    Check how the old-timers wrote and plagiarized before.

  2. Anonymous users2024-02-04

    Dear Leader:

    It is with 120,000 points of guilt and 120,000 points of remorse that I write this review to you, and I feel deeply guilty and disturbed by my careless behavior

    Because of my carelessness, I failed to bring the model in time and put it away, resulting in the model being taken away by the leaders of the shopping mall. As a substitute post officer, you should be strict with yourself and be strict with yourself! However, I can't restrain myself well, and due to my own dereliction of duty, I have brought serious safety hazards to the company, which also shows that I don't have enough responsibility for my work, and I don't have the ideological motivation to do my job better and go to a new level.

    In my own thoughts, there is still the idea of getting by and coping with the life. Now, I deeply feel that this is a very dangerous trend and an extremely important sign.

    Therefore, what happened this time made me not only feel ashamed of myself, but more importantly, I felt sorry for the trust of the leader and the concern for the leader.

    At the same time, we should sincerely thank the leader, if it is not for the leader to find out in time, and ask themselves to reflect deeply, and let themselves continue to indulge and develop, then, the consequences are extremely serious, and it is even impossible to imagine what kind of work mistakes will occur. Therefore, through this incident, while deeply saddened, I also feel fortunate and feel that I have awakened in time, which is undoubtedly a key turning point in my future life growth. Therefore, while I am reviewing the leadership, I would like to express my heartfelt gratitude to you.

  3. Anonymous users2024-02-03

    Circuit detection method: The report content is recommended as follows:

    1. The design principle of the circuit and the layout of the wiring are explained first.

    2.The functions realized by its circuits are analyzed through its principles, and then tested using relevant instruments or testing equipment.

    3. The above steps can obtain relevant data, which is the numerical basis for detection. (e.g. inspection data sheet).

    4.Finally, combine the principle with the data, describe the implemented functions, and organize them systematically.

    5. Organize into a report.

    Note: If RD1 is R&D, to the engineering sample, the above can be done, and if it needs to be imported into manufacturing, it is necessary to do reliability testing.

  4. Anonymous users2024-02-02

    The on-site quality inspection report is one of the documents certifying the quality and quantity of the completed engineering structure. The following basic requirements should be met when filling in:

    1. Therefore, the project name, station number, and location must be filled in clearly, and the quantity (such as anchors, pipelines, etc.), the number of materials or construction design drawings, etc., must be indicated if necessary, so that they can be checked when measuring.

    2. The use of abbreviations should be standardized and popular, and all content should be understandable to others.

    3. The unit of measurement and the number are revised in line with the current national standards.

    4. If there is a problem with the appearance, it should also be recorded in detail for use in quality assessment. It is best for more than 3 people to work together to achieve objectivity and fairness.

    6. Prove that the basic requirements specified in the "Standard" have met the specified test data and relevant records, such as the concrete strength of bridge expansion joints, the concrete impermeability of tunnel lining and other test data; The basic requirement is the recording of each inspection.

    7. Prove that there are no specified inspection items, and the test or inspection items required by the design or construction specifications should be done, such as the ash content, oil-stone ratio, aggregate gradation and other test data and inspection records of pavement engineering.

    8. The signatures (must be handwritten) of the personnel indicated on the on-site quality inspection and inspection personnel and supervision engineers and on-site quality inspection reports should be complete, and the personnel should be approved by the owner at the time of bidding, with the corresponding qualification requirements of the construction and supervision unit or the relevant quality supervision unit personnel.

    9. If there is a failure after testing, the supervising engineer shall judge in the conclusion column of the on-site quality inspection report and put forward suggestions for rectification. The data should be classified into the file, and then re-conduct the on-site quality inspection against the original test items after the rectification is completed, fill in the new "on-site quality inspection report", the specific requirements are the same as above, and indicate in the conclusion column that the "on-site quality inspection report" is the inspection result after rectification, and attach the original unqualified information to the archive as proof of rectification.

  5. Anonymous users2024-02-01

    Review the relevant testing specifications, how to check how to fill in, and then take a look at the format of the items to be filled in **, and fill in the corresponding ones. This may involve inspection frequency, test batch, error range, test results, etc.

  6. Anonymous users2024-01-31

    If the construction process is done, that is to say, there is this construction process, it is written to meet the requirements, in line with the design and specification requirements, of course, if the construction process is not done, do not write, other content is very easy to fill in, the key is to see if you make the sub-items clear, the others are very easy to fill.

  7. Anonymous users2024-01-30

    Just fill in the requirements according to the content of the construction drawings, and fill in the items that are not in the drawings - on the line.

  8. Anonymous users2024-01-29

    Self-inspection report on the quality supervision of surveying and mapping information results.

    In accordance with the notice of the quality supervision and inspection of the province's surveying and mapping information achievements and the specific requirements of the Municipal Bureau of Surveying and Mapping, our company organized personnel to conduct a self-inspection on the quality of surveying and mapping products in the past two years, and now reports the self-inspection as follows.

    First, the basic situation.

    *The company was established for the first year and is a surveying and mapping company with independent legal personality. The existing staff has engineering surveying, cadastral surveying and mapping, aerial photogrammetry, map mapping, land planning, urban construction, water conservancy, computer application and other professional engineering and technical personnel. Among them, there are ** engineers, land appraisers, agronomists, assistant engineers, and technicians.

    The company has invested in the purchase of GPS receivers, rangefinders, total stations, levels, plotters and other equipment, and has a relatively complete quality management system.

    The company is mainly engaged in engineering surveying and cadastral surveying, and the relevant surveying and mapping products are entrusted to Party A's surveying and mapping product quality supervision and inspection department for inspection, all of which are qualified. 2. Quality management 1. Main achievements.

    In 2012, the main measurement results of our company are *** and so on. The overall quality of the measurement results is good, the quality of the figure products has been continuously improved, and the quality policy and quality objectives have been met, and the results have won unanimous praise from the superior authorities and the use of the results. 2. System management.

  9. Anonymous users2024-01-28

    The date of filling in is 28 days after the day of pouring.

    1. The prerequisite for filling in the unit engineering quality assessment form is that the basic requirements are checked in accordance with the regulations, the construction records are complete, true and clear, and there are no obvious defects in the appearance appraisal.

    2. The key measured items are qualified and excellent standards: Qualified: The pass rate of each measured point is 90 or above. Excellent: The pass rate of the measured points is 100.

    3. General measured items are qualified and excellent standards: Qualified: The pass rate of each measured point is 70 or above. Excellent: The pass rate of each measured point is 90 or above.

    4. Qualification standards for unit projects (processes): All inspection items meet the standards, and the pass rate of each measured point of the key measured items is 90 or above, and the pass rate of each measured point of the general measured items is 70 or above.

    5. Excellent standards for unit projects (processes): All inspection items meet the quality standards, and the pass rate of the measured points of the key measured items is 100, and the pass rate of the measured points of the general measured items is 90 or above.

  10. Anonymous users2024-01-27

    Instructions for filling in the form (itemized project quality inspection and evaluation form).

    1. Basic requirements.

    According to the "on-site quality inspection report" of this sub-project, the project quality inspection and assessment shall not be carried out when the inspection does not meet the basic requirements.

    2. Measured items.

    If there is no measured item listed in ** in the quality inspection and evaluation of the sub-project, the measured item will not be filled. Three: Score According to the pass rate is 100%.

    Fourth: the specified value or allowable error value should be strictly in accordance with JTG F80 1---2004 "Highway Engineering Quality Inspection and Evaluation Standards".

    5. There are 13 columns of measured values or deviation values, and the measured values can not be filled in when the measured values are less than 13 columns.

    Six: the average value, representative value only for the need to mathematical statistical methods to evaluate the implementation of the project, if the average value, representative value qualified, according to JTG F80 1---2004 "Highway Engineering Quality Inspection and Evaluation Standards" appendix B to calculate the pass rate, if unqualified, the pass rate is zero.

    Seven: pass rate.

    In addition to the items assessed by mathematical statistical methods, they should be assessed according to whether the value of a single point (group) meets the requirements, and scored according to the pass rate, eight: score: test item score = test item pass rate x 100

    9. The item code column of appearance defect deduction is the corresponding project code for appearance defect deduction in the on-site quality inspection report of this sub-project.

    10. Items 1 --- 6 mentioned in the sub-items of incomplete quality assurance information are:

    a: Raw materials, semi-finished products and quality inspection results used;

    b: material ratio, mixing processing control inspection and test data;

    c: foundation treatment, concealed engineering construction records and bridge tunnel construction supervision data;

    d: test records and quality inspection summary charts of various quality control indicators;

    e: Records of abnormal conditions encountered in the construction process and their impact on the quality of the project;

    f: If a quality accident occurs during the construction process, the approval certificate that meets the design requirements will be met after treatment and remediation;

    Eleven: Twelve: The quality grade is less than 75% as unqualified; Greater than or equal to 75% is qualified.

  11. Anonymous users2024-01-26

    How to fill in the average value of the thickness?

  12. Anonymous users2024-01-25

    GB50300 2001 and the "Code for Acceptance of Construction Quality of Various Specialties of Construction Engineering" divide the acceptance items into: 1 main control project and 2 general projects.

    The main control item - the sampling sample shall comply with the regulations;

    General items - more than 80 (including 80) of the sample should comply with the regulations, and the remaining 20 below are allowed to deviate slightly, however, the maximum deviation of the items given with the allowable deviation shall not exceed the multiple of the allowable value of the specification. (Remember this 80 and times).

Related questions
8 answers2024-02-09

If your mobile phone cannot access the Internet after connecting to the wireless network, we recommend that you first check whether other devices can connect to the wireless network normally. If only your device can, and other devices cannot, it is recommended: >>>More

9 answers2024-02-09

Suppose you usually have high-energy ores or something.

Buying 4 trainmen is definitely the best choice. >>>More