I bought a balcony automatic drying rack online, I don t know how to install it, please guide

Updated on home 2024-02-09
12 answers
  1. Anonymous users2024-02-06

    1. Installation of the hand shaker: The hand shaker is generally installed on the right side of the balcony to facilitate habitual use, and the distance from the ground is generally 120cm, which is determined according to the height of the user. Fix with expansion screws.

    Second, the installation of the top seat: on the top of the balcony to be installed, measure the diameter of the lighting on the top of the balcony with a steel ruler, and then make an installation mark between 15cm-30cm on both sides of the lamp (the length is determined according to the size of the balcony). Measure the distance between the mark and the edge of the balcony and determine the width of the roof installation based on this distance.

    Then measure the length of the balcony with the lamp as the center, determine the two sides of the lamp according to the length of the clothes rod and divide 80cm-100cm, and then there are four intersections with the measurement distance of the width, and these four intersections are the installation position of the top seat of the lifting drying rack. After the position is determined, drill the hole with an electric drill, and fix the four top seats with expansion screws after drilling the hole (if the length of the bar exceeds the conventional size, this distance should be adjusted accordingly).

    Note: The two top seats on this side of the corner by the swing hand are the movable ends. The other two top seats are fixed seats, and the difference between them is that the movable seat is two wheels, and the movable seat must be installed in the front.

    3. Installation corner: The corner can be installed on the top of the balcony or the top of the wall, the corner is 50-70cm away from the movable roof, and must be triangular (45 degree angle) in the middle of the movable roof, and the position of the shaker installation is maintained in the same vertical line, you can refer to the drawings.

    Fourth, the wire connection: a set of lifting drying rack has two steel wires, first take out one, first pass one end of the steel wire through the bearing wire groove of the corner, then pass through the movable end of the top seat of the movable wheel bearing wire groove (located in the upper part of the top seat), and then through the bearing wire groove of the fixed end top seat to make the steel wire perpendicular to the ground, and then put the top cover into the wire from the wire, and clamp the top seat cover. The other end of the steel wire also passes through another hole in the bearing wire groove of the corner, and then passes through the other movable wheel bearing wire groove of the movable seat (below the same top seat), so that the steel wire is perpendicular to the ground, and then the top cover is inserted from the steel wire to clamp the top seat cover.

    5. Dry connection: at the head end of each wire, wear the hanging ball and tie the knot in the hanging ball; Then pull the hanging ball until it hits the top seat, then pull the steel wire from the corner, just into a double-strand steel wire, stuck at one end of the hand crank; Relax the steel wire in the hand crank, drop the hanging ball, pass the drying rod through the hanging ball, and then tighten and fix it at the hole of the hanging ball, and nail the screws; Finally, install plugs at both ends of the drying rod.

  2. Anonymous users2024-02-05

    The specific installation steps of the balcony automatic drying rack are as follows:

    Check whether the accessories are complete and whether the installation tools are complete.

    Install the top base, measure the spacing between the 4 top seats with a ruler, mark the wall, drill the hole with an electric drill after marking, and then fix the hanger with expansion screws.

    To install the roller skate, measure the distance between the 4 roller skates, mark the installation position, and then use an electric drill to punch holes, and install the roller skate after punching the holes.

    Install the cornerer, measure the position of the 4 cornerers, mark the installation position, and then use an electric drill to punch the hole, and install the cornerer after punching the hole.

    Install the eyebolt, cut all the ends of the wire flat, then thread it through the loop and tie it tightly.

    Install the clothes pole, take out the clothes pole parts, assemble the clothes pole, and then fix the two clothes poles on the lifting ring, and the installation is completed.

    Test, after the installation is completed, test whether the functions can be used normally, if you can, it means that the installation is successful, if not, check the installation step if there is an error, and reinstall it.

  3. Anonymous users2024-02-04

    It should not be installed. You can buy a vertical shelf online, you can also hang a lot of clothes, and it is also very space-saving and very safe.

  4. Anonymous users2024-02-03

    Yes, it is very necessary to install a drying rack on the balcony, if you don't install it, you can only go downstairs to build a rope to dry clothes.

  5. Anonymous users2024-02-02

    Drying racks should be installed on the balcony, and if they are not installed on the balcony, you can choose to buy a drying machine, which will also be more convenient.

  6. Anonymous users2024-02-01

    I think it should be installed, if you don't install a drying rack, then you can only buy a folding drying rack to dry clothes, which is really inconvenient, so it is better to install a lifting drying rack.

  7. Anonymous users2024-01-31

    I think there should be a drying rack installed on the balcony, and if you don't have it, you can buy the corresponding products for drying clothes, or products for drying clothes, which can be used indoors.

  8. Anonymous users2024-01-30

    Should. If we don't have a drying rack installed, we can buy a floor-standing drying rack, which can also serve the purpose of drying clothes.

  9. Anonymous users2024-01-29

    It is better not to install a drying rack on the balcony, you can install an iron chain to dry clothes.

  10. Anonymous users2024-01-28

    Family life is getting better and better, furniture is needless to say, it must be getting better and better, before talking about drying racks, now most families should be automatic drying racks, this is a good thing, the following is to make a leak to tell everyone that the automatic drying rack installation is no problem for one person to complete, let's follow this site together to install automatic drying racks.

    The installation method of the automatic lifting drying rack is as follows:

    1.Install the top seats, determine the position, drill the holes with a drill bit, and after drilling, fix the four top seats with expansion screws (if the length of the rod is larger than the traditional size, adjust the length accordingly).

    2.Install the corners, the corners can be installed on the top of the balcony or on the top of the wall, the corners are 50-70 cm from the movable top, it must form a triangle (45 degree angle) in the middle of the movable top base, as well as the position of the installation hand to maintain the same vertical line.

    3.Wire connection, a set of drying racks contains two steel wires, first, take out one, first, pass one end of the steel wire through the corner bearing trunking, then through the movable wheel bearing trunking of the movable end top seat, and then through the fixed end top seat, the bearing trunking makes the wire perpendicular to the ground, then the top cover is inserted from the wire to grab the top cover, the same goes for the other end of the wire, the other wire is installed in the same way as the first one.

    4.Dry connection, at the end of each wire, put on the ball and tie it into the ball, then pull the ball to the top seat, then pull the wire from the corner position, pull the wire into a double strand, the open stove is stuck on the side of the vibrator, loosen the wire in the hand crank, put down the drop ball, pass the drying rod through the drop ball, then screw it into the hole of the drop ball to fix the screws, and finally, plug the head at both ends of the dry rod.

  11. Anonymous users2024-01-27

    1. When installing the balcony ceiling drying rack, when installing the top seat, we must know the relevant diameter of the balcony lighting, and then make an installation mark between the two sides of 15-30 cm, and then measure the distance between the number and the edge of the balcony, and then determine the wide top of the top seat installation at this distance, and then take the lamp as the center, measure the length of the balcony, and then determine the lamp on both sides of the lamp according to the length of the drying rack clothes rod 80-100 cm, and then there are four intersections with the measurement distance of the width. These four intersections are where the hanger top seat is mounted.

    2. After the position is determined, start drilling with an electric drill, and then fix the four top seats with expansion screws, which can be adjusted according to the actual length, the two top seats on the side of the corner of the swing hand are the movable end, and the other two top seats are fixed seats, the difference between the two is that the movable seat is connected with a wheel, and the movable seat must be installed in front.

    3. In the drying rack, there is also a steel wire, you can take out a steel wire first, first pass one end of the steel wire through the bearing wire groove of the corner, then pass through the movable end top seat of the movable wheel rotating shaft steel wire groove, and then pass through the bearing wire groove of the fixed end top seat perpendicular to the ground, and then put the top cover into the steel wire.

    4. The next step is to install the corner of the balcony drying rack, the corner can be installed on the top of the balcony or the top of the wall, the corner is 50-70 cm away from the movable roof, but it must be in a triangle in the middle of the movable roof, and the position of the shaker installation maintains a unified vertical line.

    5. As for the way to wear the second steel wire, it is similar to one, wear the hanging ball at the head end of each steel wire, tie a knot in the hanging ball, and then pull the hanging ball to the top seat, and then nail the screws, and finally install the plug at both ends of the drying rod.

  12. Anonymous users2024-01-26

    The installation steps of the automatic drying rack are as follows:

    Determine the installation location: Determine the installation location and height of the drying rack according to the size of the balcony where the drying rack will be installed and personal needs.

    Drilling: Use a percussion drill to drill holes on the top of the balcony or the top of the wall to ensure that the hole position is accurate and the hole size is appropriate.

    Install the top seat: Install the top seat of the drying rack on the hanger, adjust the position and fix it with screws.

    Install the drying bar: Install the drying rod of the drying rack on the top base, make sure that the distance between the drying rod and the top seat is appropriate, and fix it with screws.

    Connecting wires: pass two wires through the bearing wire groove of the top seat and the drying rod, and fix them with screws.

    Install the plug: Install the plug at both ends of the drying rack to ensure the use effect and aesthetics of the drying rack.

    Adjust the position: Finally, adjust the position and angle of the drying rack to make sure it is ergonomic and can be used properly.

    Before the drying rack is installed, the following preparations need to be made:

    Check the surface of the board: Check the surface of the drying rack plate for scratches or other defects, and if there are any, deal with them in time.

    Check the identification of the drawings: check whether the identification on the installation drawings of the drying rack is consistent with the site, and if there is any discrepancy, the feedback button should be timely and adjusted.

    Clean up the balcony: Clean the balcony of debris and dust so that the installation process is smoother.

    Prepare installation tools: Common tools include percussion drills, pliers, scissors, screws, screwdrivers, brackets, base plates, etc.

    If you want to find a professional installation master to install, you can also go to Luban to your home.

Related questions
6 answers2024-02-09

Upstairs is detailed! The simple point is 1: boot up and set various settings (the language is best to choose traditional Chinese!) >>>More

5 answers2024-02-09

You must have the following items:

1. Bank card (online banking must be opened) (any line can be, the general ICBC is a little more convenient, and there is a password card that does not need to be used by some more troublesome clients or something, and it is very safe. ); >>>More

5 answers2024-02-09

Browse polls. After entering the post bar, the post with the [vote] mark after the title is the poll sticker, and you can click on it to browse the poll. >>>More

3 answers2024-02-09

In the Haehan Empire, the 321524 of V+, passengers who fail to receive their itinerary within 7 days after taking the plane can make up the itinerary at the ticket purchase station at the airline and ticket offices. 2. The service of printing the itinerary is valid within 30 days after the ticket is purchased. Passengers who collect their itinerary at the airport must collect it within 30 days of departure. >>>More

12 answers2024-02-09

If you ignore it after receiving the goods, the system will automatically confirm the receipt on your behalf after 30 days of surface mail and 10 days after express delivery, and the money will be automatically sent to the seller. There will be no penalty for you. However, if you apply for a refund after receiving the goods, and there is no suitable reason and evidence, the other party may complain about you, and the customer service may give you a penalty, and the money will still be paid to the seller in the end.