    It is necessary.

    In fact, when it comes to hydropower retrofits, most users retain the water circuits that developers are equipped with. On the other hand, the quality of the water and electricity pipelines equipped by the developer is basically up to standard (especially **), and even better than the products purchased by some users.

    Changing hydropower is not "changing hydropower", it is just a modification of the original water circuit - the hydropower points provided by the developer are fixed, and users need to change the number and location of these points according to actual needs to make them more practical.

  2. Anonymous users2024-02-05

    In home renovation, the cost of water and electricity renovation is a very large expense. If the owner thinks that it is really necessary to carry out water and electricity renovation, it is best to ask the plumber to see whether the original water and electricity pipes meet the general requirements of the decoration and whether they can meet the needs of daily life, and then determine the water and electricity renovation plan according to the decoration level. As a general rule, don't make major changes to hydropower if small local changes will meet your daily needs.

    So, what issues need to be considered before hydropower transformation?

    Home renovation selection is very important for the renovation company. It would be better if you could find a decoration company that has good decoration results and will not be particularly troublesome. But we have a lot to think about.

    For example, when we decorate our home, do we need to renovate the water and electricity? It is estimated that different renovation companies will give different answers. If it is a professional company, it will give a specific transformation plan according to the specific situation of our home hydropower.

    The wires to be installed in the living room include power cords, lighting cables, air conditioning cables, TV cables, ** cables, computer cables, doorbell cables, etc. The location of the wires needs to be considered and reserved in advance. Generally speaking, the network socket is reserved for the edge of the sofa, the doorbell socket is reserved for the inside of the door, and the power socket is reserved for water dispensers, humidifiers and other equipment.

    The background wall of the TV in the living room should generally reserve at least five power outlets. Anything that has not been unplugged, such as air conditioners and DVD players, is on standby. It is best to have a switch socket panel, which can be turned off directly when not in use, and there will be no waste of electricity.

    Waterway renovation starts with replacing the indoor water pipes with the better ones you bought. According to the teacher's advice and personal preferences, set up sockets in the kitchen, bathroom, and balcony, including the location of the vegetable basin, kitchen treasure, bathroom sink, water heater, shower, balcony sink, etc. and how to get hot water, such as directing hot water from the electric water heater in the bathroom to the kitchen.

    So you need to determine the location of each outlet. Then look at how the water pipe goes, against the wall, or in the middle, etc.

  3. Anonymous users2024-02-04

    When renovating a new house, we must consider the issue of water and electricity renovation. At this time, the personal point of view is that the water and electricity for the decoration of the new house can be partially renovated, and it does not need to be completely transformed. Before the water and electricity renovation, the furniture size of each space should be determined.

    Because the size of the furniture determines where the sockets and lights are placed in the end so that they will not be blocked. Determine the necessary household appliances at home, their size and placement, and the household appliances should look to the future, even if you will not buy it now, you will buy it one day if you can't guarantee it, and the result is that the circuit position is not reserved for it, so what should I do? For example, refrigerators, sterilizers, microwave ovens, electric ovens, water purifiers, small kitchens, range hoods, smart toilets, air conditioners, etc.

  4. Anonymous users2024-02-03

    For home decoration, it is also necessary to transform the water and electricity, and we also have to consider the waterproof situation in advance, after all, this has a great impact on the later use.

  5. Anonymous users2024-02-02

    I think that home renovation needs to be renovated with water and electricity, and if you don't renovate water and electricity, it will have a very serious impact on your future life; Before decorating, we must first do a waterproof test, and when decorating, we must leave a few more sockets on the room, so as to ensure future use.

  6. Anonymous users2024-02-01

    The so-called hydropower renovation refers to the transformation of the waterways and circuits of the existing living space according to the design plan. The reason why home decoration is inevitable to transform water and electricity is due to the following reasons.

    1. As far as new houses are concerned, the developer's installation of indoor waterways and circuits is only based on general needs, and the number is not large. Therefore, before moving into a new house, it is necessary to renovate the water and electricity of the new house according to the needs of home life and living habits.

    Second, the hydropower materials used by the developer may be relatively general, as long as they can pass the acceptance, or when the building is handed over, it can be connected to water and electricity. Therefore, in order to ensure the safety of future use and the purpose of prolonging the service life, it is necessary to carry out water and electricity renovation of the new house.

    3. After the old house is used for a period of time, the water and electricity lines may be aging and leaking due to various reasons. Therefore, from the perspective of safety, it is necessary to renovate the water and electricity of the old house to eliminate potential safety hazards.

    Fourth, after the old house has moved in for a period of time, it may be necessary to increase or adjust the circuit and waterway of the house due to various reasons, such as the increase of electrical appliances, etc., therefore, it is also necessary to carry out partial or even overall renovation of the water and electricity of the old house.

    So, what are the precautions in hydropower transformation?

    1. Design

    The owner has a global idea of the layout of his home: to figure out where to put the furniture in the home, what electrical appliances to put in, where to get the socket, etc., all have to be considered, which is the key to doing hydropower transformation. Because everyone's living habits are different, it is necessary to take into account the bit when designing.

    Doing a good job in the design before hydropower renovation is also a prerequisite for the hydropower renovation budget and preventing the overrun of the renovation cost.

    2. Selection of materials

    When buying materials, it is necessary to see whether it is a qualified product produced by a regular manufacturer. When the owner is decorating, it is best to have some knowledge in this area, otherwise let the decoration company buy it shoddy, and it will outweigh the loss.

    3. Construction materials

    When entering the site, the decoration materials should be verified to see if they are of qualified quality, otherwise it will be difficult to verify the decoration; There is also to verify with the staff to see if they have the qualifications for water, electricity and heating construction, and only after confirmation can they be allowed to construct.

    4. Acceptance

    After the construction of hydropower renovation is completed, every detail of the construction should be carefully accepted. There are standards for hydropower transformation, and if the owner is not good at it, it is best to find someone who knows how to accept it. One thing to note:

    It is necessary to obtain water and electricity renovation drawings from the renovation company for future maintenance and repair.

    After understanding the reasons for the delay in hydropower transformation, we need to know the precautions in hydropower transformation, otherwise hydropower transformation still cannot meet the needs of daily life, and it will have to be re-transformed in the future.

  7. Anonymous users2024-01-31

    Generally, hydropower renovation is a profitable construction project in the decoration company, which does not seem to be expensive, but it is generally thousands of yuan or even more than 10,000 yuan. Therefore, it is necessary to be fully prepared, and it is best to have the plumber of the decoration company make a simple measurement first, estimate the approximate cost, and then carry out the construction.

    Acceptance method of hydropower: waterway acceptance, press test machine to press 8kg for more than half an hour, and check the position of each joint by hand. Circuit acceptance, check with a multimeter to see if each wire is short-circuited or open-circuited.

    Special attention: after the acceptance of the waterway, let the hydraulic engineer fix the water outlets.

    Finished product protection: The inlet and outlet of all water pipes should be blocked with plugs, and it is best to connect the cold and hot water pipes with hoses to fill the two water pipes with water. Circuits:

    The PVC pipe on the ground is easy to be crushed by the foot or other things, after acceptance, it is protected with cement mortar, each line head is protected with adhesive tape, and the line is complex to be marked with a number.

    Special note: The bathroom should be tiled, and it is best not to fix the water pipe with plaster, because the plaster may make the magnetic sheet hollow. It should be fixed with cement mortar.

    Responsible for the construction project: When it is time to negotiate with the plumber, be sure to ask: Does it include the installation of switch panels? Are you responsible for the protection of the finished product? Is it responsible for sealing the pipeline? Are you responsible for drawing the circuit diagram?

    Whoever has the garbage is responsible for cleaning it and sending it to the designated garbage point in the community.

    After the renovation is completed, take pictures with the camera for future repairs.

  8. Anonymous users2024-01-30

    The principle of hydropower construction is to go to the top not to the ground, and the line to the top is in the ceiling or gypsum line, which is convenient for maintenance. If you can't walk on the top, consider walking on the wall, and if you can't walk on the wall, you should consider walking on the ground.

    In addition, because hydropower is a hidden project, it is difficult to see the wiring under the wall after the decoration is completed, so it is necessary to come to the site to see more records during construction. After a few years, if you want to replace the furniture, you can know whether you can make nails under the wall.

    Precautions for waterway reconstruction:

    1.The water supply pipe should be laid in the wall as much as possible, and should not be laid in the same tank as the electrical pipe;

    2.The water pipe should be hot on the left and cold on the right, and the spacing between the joints of the hot and cold water pipes should be 120-150mm;

    3.After the water supply pipe is connected, the water outlet is blocked for pressure test to ensure that there is no leakage;

    4.The drain pipe is tested to ensure smooth drainage;

    5.The sewer hose of the wash basin and vegetable basin should be selected with a return bend, and the PVC drain should be blocked to prevent back-smelling.

    For the details of the waterway renovation, please refer to: Interior decoration water outlet preset height and waterway renovation precautions - live well.

    Precautions for circuit transformation:

    1.The number and location of switches and sockets should be carefully considered when wiring, and in principle, more should be more and not less;

    2.The height of the switch socket in the same room should be the same;

    3.In order to prevent accidental electric shock of children, be sure to choose a safety socket with a safety flap;

    4.For electrical appliances that need to be switched on and off frequently, consider using sockets with switches;

    5.Network cables, ** cables, and TV cables cannot be worn in the same pipeline as wires;

    6.The connection between the newly made cassette conduit and the wire box should be connected with a lock.

  9. Anonymous users2024-01-29

    Hydropower renovation is a hidden project in decoration, which is directly related to the comfort and safety performance of future living. If there is a problem after the house is decorated, it will take great pains to repair, and it will cause a lot of inconvenience to home life, so the decoration owners must pay special attention to the water and electricity transformation when carrying out the home appliance project, and supervise the workers to build carefully. There are the following aspects that need to be paid attention to in the transformation of waterways:

    One. The waterway renovation of the kitchen mainly includes the faucet and the water heater, and the general family is that the kitchen and the bathroom share a water heater, so when carrying out the waterway transformation, we must think about the location of the water heater installation, so as to determine the location of the installation of the hot and cold water pipes and carry out the waterway transformation. Two.

    There are many contents of bathroom waterway transformation, the installation location of washbasins, toilets, bathtubs and washing machines, whether hot water pipes are needed, and the sewer treatment of floor drains must be in place, otherwise it will cause backwater in the future. 3. Circuit transformation of the living room The wires and lines that need to be installed in the living room include power lines, lighting lines, air conditioning lines, TV lines, ** lines, computer cables, doorbell lines, etc. The location of the wire needs to be considered in advance, do a good job of reservation, generally speaking, on the edge of the sofa to leave the first line mouth, in the door to leave the doorbell line mouth, water dispenser, humidifier and other equipment reserved power port, in general, the living room should leave at least 5 power cord ports.

    Fourth, bedroom circuit renovation Bedroom circuit transformation generally includes power cords, lighting wires, air conditioning wires, ** lines and computer lines. Reserve the power cord port above the bedside table, and use a 5-hole plug-in board with a switch, which can reduce the trouble of the bedside lamp not switching. The power supply terminal (hair dryer) should be reserved above the dresser; In addition, consider that there should be a reflector above the vanity mirror, and install a switch next to the wire box; It is best to use double control switches for bedroom lamps, one is installed on the outside of the bedroom door, and the other switch is installed on the upper side of the bedside table or the easier to operate part of the bedside, so that you don't have to get up to close the bedroom door when you sleep at night.

    As long as these projects are considered in advance, and the workers are strictly supervised to operate in accordance with the standard steps during construction, there will generally be no problems in hydropower transformation. Hydropower renovation is one of the important links in home decoration, once there is a large hidden danger loss is relatively large, and the maintenance is often more destructive. So we must pay attention to it to avoid causing damage in the future!

  10. Anonymous users2024-01-28

    Large items are determined in advance.

    It is necessary to determine the brand and specific model in advance, including shower room, bathtub, water heater, small kitchen, toilet, ceiling hood, air conditioner, etc. Among them, shower rooms with steam function and instantaneous water heaters, and air conditioners above 26 generally need 16A sockets, and instantaneous water heaters must be wired separately from the distribution box, and wires with a cross-section of more than 4 square millimeters are used to avoid frequent tripping or overheating accidents.

    Go to the top and not the ground.

    If the waterway goes to the ground, it is not easy to find the problem, because the water is flowing to a low place, and the leaking place does not necessarily flow out of the water first, only when the water leaks downstairs or overflows the gold mountain, the leakage will be found, and because it is a hidden pipe, it is impossible to find the leakage place immediately, and the ground can only be planed open, so the loss will be considerable. Circuit routing is exempt from this restriction because the wires are pipe-threaded, and even if there is a problem, the wire can be pulled out for maintenance.

    Hydropower renovation is the top priority in home renovation, because most of the pipelines are buried in the dark, and it will be very troublesome to have problems or want to change them after the renovation is completed. Therefore, hydropower transformation should not only ensure quality, but also fully consider the needs of use.

Related questions
4 answers2024-02-13

1. The material process must meet the requirements of the company's specifications: all wires are made of famous brands such as pigeon brand BV wires, lighting circuit sockets air conditioners 4mm2, kitchens, bathrooms 4mm2, and grounding wires, especially emphasizing that DAEX general light (16) pipes or DAEX (16) B pipes, round tees, direct, locks, and yellow wax pipes should be used in the threading, and bellows, elbows, and equal diameter tees are never allowed. 1 16 pipes can only be used for one circuit, 20 can only be used for 6mm21 circuits and the circuit between the toilet bomb and the switch. >>>More

17 answers2024-02-13

A comfortable and comfortable villa house life is inseparable from the comfortable and warm decoration design, villa design and decoration is more complex than you imagined, not only involving the transformation of the building structure, but also covering the indoor and outdoor environment supporting systems, large area, more space, complex structure leads to the whole decoration process is not simple. >>>More

9 answers2024-02-13

It depends on what paint you want to use, traditional coatings can be used Nippon, China Resources and other brands are relatively good, but with the improvement of people's living standards, the taste of home decoration is getting higher and higher, and then it has also driven the rapid development of the art paint industry. >>>More

13 answers2024-02-13

According to the different interior partitions, the bathroom, kitchen, dining room, bedroom, and living room are different. Suspended ceilings, decorative lines. or direct latex paint. >>>More

8 answers2024-02-13

If the water and electricity are added up, not counting the materials, the construction cost is about 100 square meters... We do villa design** is much higher than this, you can find workers to construct this matter yourself** Hehe.