  1. Anonymous users2024-02-07

    Fire Protection Law of the People's Republic of China.

    Article 58 stipulates that fire protection acceptance shall be carried out in accordance with the law.

    The construction project has not been accepted by fire protection or is unqualified for fire protection acceptance, and has been put into use without authorization. Order the cessation of construction, stop the use or stop production and business, and give a fine of between 30,000 and 300,000 RMB.

    Article 58: Whoever violates the provisions of this Law by committing any of the following acts shall be ordered to stop construction, stop use, or suspend production and business, and shall be fined between 30,000 and 300,000 RMB

    1. It shall be approved by the public security organs in accordance with the law.

    The construction project of the fire protection design review carried out by the fire protection agency is carried out without being reviewed in accordance with the law or the audit is unqualified, and the construction is carried out without authorization;

    2. The fire protection design is unqualified by the fire department of the public security organ in accordance with the law, and the construction is not stopped;

    3. The construction project that shall be subject to fire protection acceptance in accordance with the law is put into use without fire protection acceptance or unqualified fire protection acceptance;

    4. After the construction project is put into use, it is unqualified by the fire department of the public security organ and the fire department in accordance with the law, and the use is not stopped;

    5. Public gathering places.

    It has not been inspected for fire safety or does not meet the fire safety requirements after inspection, and is put into use or business without authorization.

    Construction. Failure to report the fire protection design documents to the fire department of the public security organ for the record in accordance with the provisions of this Law, or failure to report to the fire department of the public security organ for the record in accordance with the provisions of this Law after the completion of the project, shall be ordered to make corrections within a time limit and shall be fined not more than 5,000 yuan.

  2. Anonymous users2024-02-06

    Excerpt from the Fire Protection Act.

    Article 59: Whoever violates the provisions of this Law by committing any of the following acts shall be ordered to make corrections or stop construction, and shall be fined not less than 10,000 yuan but not more than 100,000 yuan:

    1) The construction unit requires the architectural design unit or the construction enterprise to lower the fire protection technical standards for design and construction;

    2) The architectural design unit does not carry out fire protection design in accordance with the mandatory requirements of fire protection technical standards;

    3) The construction enterprise does not follow the fire protection design documents and fire protection technical standards for construction, reducing the quality of fire protection construction;

    4) The project supervision unit colludes with the construction unit or the construction enterprise to deceive and reduce the quality of fire protection construction.

  3. Anonymous users2024-02-05

    The Fire Protection Act provides:

    Article 58: Whoever violates the provisions of this Law by committing any of the following acts shall be ordered to stop construction, stop use, or suspend production and business, and shall be fined between 30,000 and 300,000 RMB

    1) Construction projects that shall be subject to fire protection design review by the fire protection agency of the public security organ in accordance with the law, without being reviewed in accordance with the law or failing to pass the review, and are constructed without authorization;

    2) The fire protection design is unqualified by the fire department of the public security organ in accordance with the law, and the construction is not stopped;

    3) The construction project that shall be subject to fire protection acceptance in accordance with the law is put into use without fire protection acceptance or unqualified fire protection acceptance;

    4) After the construction project is put into use, it is not qualified by the fire department of the public security organ and the fire department in accordance with the law, and the use is not stopped;

    5) Where public gathering places are put into use or operate without fire safety inspections or do not meet fire safety requirements after inspection.

    If the construction unit fails to report the fire protection design documents to the fire department of the public security organ for the record in accordance with the provisions of this Law, or fails to report to the fire department of the public security organ for the record in accordance with the provisions of this Law after the completion of the project, it shall be ordered to make corrections within a time limit and shall be fined not more than 5,000 yuan.

  4. Anonymous users2024-02-04

    Legal analysis: If the environmental protection facilities that need to be constructed are not completed, have not been accepted or are unqualified, and the construction project is put into production or use, or if the environmental protection facilities are falsified in the acceptance, the administrative department of environmental protection at or above the county level shall order them to make corrections within a time limit and impose a fine of not less than 200,000 yuan but not more than 1 million yuan; if the correction is not made within the time limit, a fine of between 1 million and 2 million yuan shall be imposed; the directly responsible managers and other responsible personnel are to be fined between 50,000 and 200,000 RMB; If it causes major environmental pollution or ecological damage, it shall be ordered to stop production or use, or it shall be reported to the people with the right to approve and ordered to close.

    Legal basis: Article 799 of the Civil Code of the People's Republic of China After the completion of a construction project, the employer shall conduct the acceptance in a timely manner in accordance with the construction drawings and specifications, the construction acceptance specifications and quality inspection standards issued by the state. If the acceptance is qualified, the employer shall pay the price as agreed and accept the construction project.

    The construction project can only be delivered after the completion experience is qualified; If it has not been accepted or the acceptance is unqualified, it shall not be delivered.

  5. Anonymous users2024-02-03

    Legal analysis: If the construction unit fails to report the fire protection design documents to the fire department of the public security organ for the record in accordance with the provisions of this law, or fails to report to the fire department of the public security organ for the record in accordance with the provisions of this law after the completion of the project, it shall be ordered to make corrections within a time limit and shall be fined less than 5,000 yuan. The acceptance conditions of fire protection engineering technical data should be complete, legal and valid.

    The construction of fire protection engineering should be carried out in strict accordance with the current relevant regulations and specifications. It should have equipment layout plans, construction details, system drawings, design descriptions and equipment random documents, and should be constructed in strict accordance with the design drawings approved by the public security and fire departments, and shall not be changed at will.

    Legal basis: "Fire Protection Law of the People's Republic of China" Article 58 In violation of the provisions of this Law, any of the following acts shall be ordered by the competent departments of housing and urban-rural development and fire rescue agencies to stop construction, stop use or suspend production and business in accordance with their respective powers, and impose a fine of not less than 30,000 yuan but not more than 300,000 yuan: (1) The construction project that shall be subject to fire protection design review in accordance with the law has not been reviewed in accordance with the law or the review is unqualified, and the construction is carried out without authorization; (2) A construction project that shall be subject to fire protection acceptance in accordance with the law is put into use without fire protection acceptance or unqualified fire protection acceptance; (3) Other construction projects provided for in Article 13 of this Law are unqualified after acceptance and are not qualified after random inspection in accordance with law, and do not stop being used; (4) Where a public gathering place is put into use or operated without the permission of the fire and rescue organization, or where it is found after verification that the use or business of the venue is inconsistent with the content of the commitment.

    If the construction unit fails to report to the competent department of housing and urban-rural development for the record after acceptance in accordance with the provisions of this law, the competent department of housing and urban-rural development shall order it to make corrections and impose a fine of not more than 5,000 yuan.

  6. Anonymous users2024-02-02

    If it is not filed after the fire protection acceptance, it shall be ordered to make corrections within a time limit and shall be fined less than 5,000 yuan. If the unit fails to report the fire protection design documents to the fire department of the public security organ for the record in accordance with the regulations, it shall be ordered to make corrections within a time limit and shall be fined less than 5,000 yuan.

    Legal basis: Article 58 of the Fire Protection Law of the People's Republic of China violates the provisions of this law and commits any of the following acts, the competent departments of housing and urban-rural development and fire rescue agencies shall order the construction and use of the fire and rescue agencies in accordance with their respective powers to stop construction, stop using or stop production and business of Lao Tong, and impose a fine of not less than 30,000 yuan but not more than 300,000 yuan:

    1) The construction project shall be subject to fire protection design review in accordance with the law, without the review according to law or the review is unqualified, and the construction is carried out without authorization;

    (2) A construction project that shall be subject to fire protection acceptance in accordance with the law is put into use without fire protection acceptance or unqualified fire protection acceptance;

    (3) Other construction projects provided for in Article 13 of this Law are unqualified after acceptance and are not qualified after random inspection in accordance with law, and do not stop being used;

    (4) Where a public gathering place is put into use or operated without the permission of the fire and rescue organization, or where it is found after verification that the use or business of the venue is inconsistent with the content of the commitment.

    Where the verification finds that the use and business conditions of public gathering places are inconsistent with the content of the commitment, and after being ordered to make corrections within the time limit, and the corrections are not made within the time limit or the requirements are still not met after the rectification, the corresponding permit shall be revoked in accordance with law.

    If the construction unit fails to report to the competent department of housing and urban-rural development for the record after acceptance in accordance with the provisions of this law, the competent department of housing and urban-rural development shall order it to make corrections and impose a fine of not more than 5,000 yuan.

  7. Anonymous users2024-02-01

    Dear, I'm glad to answer for you, thank you for your patience: you can go to the fire brigade in the jurisdiction to apply for reissue, and the fire acceptance needs to prepare materials (1) the fire protection acceptance declaration form for construction projects (in duplicate); (B) the project completion acceptance report; (Seal of the quadripartite unit) (3) Fire product quality certification documents; 1. The main equipment of the ventilation and smoke prevention and exhaust system (fire dampers, fans, etc.) 2, fire doors and roller shutter doors, etc. 3. Emergency lighting and evacuation instructions 4. Fire hydrant system (fire hydrant box, hose, water gun, etc.) 5. Outdoor fire hydrant system (outdoor fire hydrant, water pump adapter) (4) Building components, building materials, and interior decoration materials with fire performance requirements meet national standards or industry standards. 1. Witness sampling inspection report (external thermal insulation, decoration materials and thermal insulation materials, etc.) (5) Fire protection facilities, electrical fire protection technology testing certificates; (F) construction, engineering supervision, testing units of legal identity and qualification level certificates; (7) A copy of the power of attorney of the construction unit and the ID card of the entrusted person; (8) Other materials that need to be provided in accordance with law. A copy of the planning certificate, a fire audit opinion, a fire safety audit opinion on the construction site, and a rectification report for the fire protection opinion.

    9) Description of the use of the project.

    2. The law stipulates that these provisions are formulated in accordance with the "Fire Protection Law of the People's Republic of China" and the "Regulations on the Quality Management of Construction Projects". Article 2 These provisions apply to the fire supervision and management of new construction, expansion, reconstruction (including interior decoration, change of use) and other construction projects. These provisions do not apply to the construction activities of residential interior decoration, villagers' self-built houses, disaster relief and other temporary buildings.

    Article 3 Construction, design, construction, engineering supervision and other units shall abide by fire protection regulations and national fire protection technical standards, and be responsible for the fire protection design, construction quality and safety of construction projects. The fire protection agencies of public security organs shall carry out fire protection design review, fire protection acceptance, filing and random inspection of construction projects in accordance with the law. Article 4 In addition to the provincial and autonomous region people's public security organs fire protection agencies, the local people's public security organs at or above the county level fire protection agencies undertake the fire protection design review, fire protection acceptance and record spot check work of construction projects in their jurisdiction.

    The specific division of labor shall be determined by the fire department of the provincial public security organ and reported to the fire department of the Ministry of Public Security for the record. The fire protection design review, fire protection acceptance and filing random inspection of construction projects across administrative regions shall be designated and governed by the fire department of the public security organ at the next higher level. Article 5 The fire protection agencies of public security organs shall follow the principles of fairness, strictness, civility and efficiency in the supervision and management of fire protection of construction projects.

    Article 6 The fire protection design and construction of construction projects must conform to the national fire protection technical standards for engineering construction. Before the implementation of the newly promulgated national fire protection technical standards for engineering construction, if the fire protection design of the construction project has been approved or filed by the fire protection agency of the public security organ, it shall be implemented according to the original audit opinions or the standards at the time of filing. Article 7 The fire protection agency of the public security organ shall review and eliminate the fire protection design of the construction project.

  8. Anonymous users2024-01-31

    The penalty for putting into use without completion and acceptance is based on the Construction Law of the People's Republic of China. According to the law, if the construction project is not organized for completion and acceptance, and is delivered without authorization, the construction unit shall be ordered to make corrections and be fined, and if the loss is caused, the construction unit shall also bear the liability for compensation.

    Article 7 of the Construction Law of the People's Republic of China Before the start of the construction project, the construction unit shall, in accordance with the relevant provisions of the State, apply to the people's construction administrative department at or above the county level where the project is located to obtain a construction permit; However, the construction of acres of administrative departments which roll to determine the limit of minor works excepted. Construction projects that approve the commencement report in accordance with the authority and procedures specified in the *** will no longer receive a construction permit.

  9. Anonymous users2024-01-30

    Suspected of violating the provisions of Article 13, Paragraph 2 of the Fire Protection Law, the developer was ordered to stop using it, fined 30,000 yuan, and issued a public security administrative penalty decision to supervise rectification.

    How to punish the fire department if it is handed over without acceptance.

    Suspected of violating the provisions of Article 13, Paragraph 2 of the Fire Protection Law, the developer was ordered to stop using it, fined 30,000 yuan, and issued a public security administrative penalty decision to supervise rectification.

    Or wait for the acceptance before handing over?

Related questions
8 answers2024-03-28

**The department's fire acceptance is free of charge.

According to the "Fire Protection Law of the People's Republic of China" and the "Regulations on the Supervision and Inspection of Fire Protection of Construction Projects", the fire protection agencies of public security organs do not charge any fees for administrative licenses such as fire audit, fire protection acceptance and fire safety inspection in accordance with the law; >>>More