    1. First of all, you must learn to read the construction drawings, learn the construction process on the basis of the construction drawings, know the overall process of construction, and you will not miss some details when doing the cost.

    2. Be familiar with the quota, and be familiar with the quota according to the progress of construction on the construction site. This is the premise of doing a good job in cost.

    3. Quantity calculation rules, there will also be quota calculation rules in the quota. Memorize the calculation rules. Then, according to the progress of the project, help to make the progress payment on the construction site. It's faster to learn that way.

    4. Be familiar with some of the current pricing documents on cost, such as measure fees, taxes, fees, etc., according to the documents of different regions.

  2. Anonymous users2024-02-05

    Learn more about steel bar structure and blanking size; Various problems can be dealt with, such as most of the components are C30 concrete, and only the staircase is C25, such as the vertical rational arrangement of the secondary structure reinforcement, and the important building atlas like the 05 series.

    In addition, your cost specifications, provincial quotas, project cost composition, and subcontractor cooperation fees, the site by the design, construction, construction, supervision and other parties proposed but signed by all parties to the change, etc., etc., please learn by yourself, any type of construction also requires a lot of extensive knowledge.

  3. Anonymous users2024-02-04

    To give you a reminder, if you want to engage in cost engineering in the future, that is to say, if you have the opportunity, to engage in cost consulting engineering, don't go to the construction site project department to intern, where you can't learn anything, it's better to go to the cost consulting agency for internship, if you want to work in the housing or construction unit in the future, go to the project department for internship, of course, there are more things to learn, and you can learn what you don't understand

  4. Anonymous users2024-02-03

    Familiar with the construction drawings and the construction process of each component.

  5. Anonymous users2024-02-02

    Summary. Cost clerks belong to the job personnel in the internship program.

    What does a cost taker belong to in an internship program?

    Cost clerks belong to the job personnel in the internship program.

    Cost clerks are positions in the internship program. 1.Familiar with construction drawings, design and construction plans, construction changes, construction documents and construction contracts, relevant laws and regulations, fully grasp the economic terms and subcontracting documents of project contracting documents, and do a good job in contract disclosure; 2.

    Responsible for the preparation of the project budget and the review of the monthly target cost of the project, and according to the actual situation of the site, compare the difference between the actual cost and the target cost, and make an analysis; 3.Cooperate with the company to do a good job in the preparation of project plan costs, and put forward reasonable suggestions according to the construction plan and the actual situation on site; 4.Read the construction drawings carefully, find relevant problems in time, and participate in the review of the drawings; 5.

    According to the actual situation on site, remind the constructor to apply for the project visa in a timely manner, and combine the relevant knowledge of the budget to Party A to apply for the final review result of the economic visa; 6.Familiar with the production progress of the construction site, and prepare the construction production statistical report of the month every month; Prepare the construction budget for the next month according to the production schedule of the next month every month; 7.Participate in the drafting of the work plan of the subcontract contract, and prepare the subcontract project plan according to the work content and unit price included in the subcontract; 8.

    Participate in the review of labor settlement; 9.Collect the basic economic data of each stage and node of the project, classify and sort, summarize and analyze; 10.Responsible for handling project settlement with the owner in a timely manner, and paying attention to collecting and sorting out relevant information at ordinary times; 11.

    Cooperate with other departments and provide them with relevant information in a timely manner.

  6. Anonymous users2024-02-01

    I'll talk about that.

    First of all, find the reason from yourself, as a newcomer who has just entered the workplace, you should lower your profile, learn modestly, and don't talk too much (our group has a meal and whoever talks can pick it up, and other newcomers ask what the gutter is, and he will connect it, which is around the first floor of the building (in fact, this is scattered water), so don't talk much, and I'm not a veteran.

    Generally speaking, the young ones will not be reluctant to take you, only those who are old will not be willing to take you, only those who are old, afraid of teaching you to lose your job.

    Also, whether you can read the map and calculate your own basic calculations, you have to think about it yourself, when you go to society, no one will teach you by hand, and it is not a school, cramming teaching, and others are also very busy.

    Also, just come to work, want to learn the cost, buy your own budget exam textbooks to see, that is basically from the basics, how to calculate, there is a look at the quota, do not understand can ask on the Internet, some cost forums, to learn by yourself, occasionally ask the person with you, to learn modestly, you can learn after a long time, really don't teach you, you still have to choose to change jobs, this thing to practice, do not do the project, empty talk is useless, only in the process of doing will you find which will not, Learn more about software calculations (such as Luban, Glodon), set prices (Tea, Glodon, etc.), you can let the person who takes you give a small project she has done, go home from work to practice, don't know how to ask again, don't let the teacher complain about the work you do, teach you to be love, don't teach you is your duty (it's a bit too much, or this is reality).

  7. Anonymous users2024-01-31

    It mainly depends on what the teacher with you asked you to do, I am also cost, my first internship is to do the data, the second internship is to follow the teacher to the construction site to settle the small project, I now have a lot of classmates out of the information a lot. In my opinion, the main thing is to learn the software well, go to the construction site to practice, and then combine the actual calculation and price arbitrage, but it can't be done in a period of time, and the emphasis is on persistence.

  8. Anonymous users2024-01-30

    1. All this point of view, or stay on the construction site for more than half a year, which is very helpful to the cost. Most of the people who came out of the office talked on paper and didn't understand the scene. There is a big gap between the actual and the drawings, so you have to know the inside story.

    For example, if you are rebar, you will budget, but you will not cut the material, and it is only the skin; Another example is the sporadic mechanical cost, and a large number of material costs, maybe you know the so-called guidance**, but you don't know the actual scene**. In this way, to put it bluntly, you don't know how much the project costs and how much you make when you make the final account, but just blindly follow the drawings and move the quota; Paper.

    At the construction site, first, improve the ability to read drawings, structural drawings, architectural drawings, combined with the scene.

    Second, on this basis, count the drawings aside by yourself, see what you don't understand, and figure it out.

    Third, we must understand that the construction site materials, visas, etc., compare the fixed price and guide price, and remember it clearly in your heart.

    It's sporadic employment, remember the cost.

    If you have the opportunity to participate in the final accounts of this project, it will be a qualitative leap for you; You can learn a lot, but the firm can't. On this basis, I believe that when you change jobs again, you will improve greatly.

  9. Anonymous users2024-01-29

    No matter how specific you are, you are confused, do the cost, it is very simple on the construction site, send you six words, everything is loose, which means that you know everything and will not do anything, because we are doing the cost, the basic concept and construction process should be clear, but we do not need to build it personally, so it is enough to know what it is! We have extra time to study quotas and checklists, because our ultimate goal is to calculate how much a project costs, not how many days to build a project!! So, it's necessary on the construction site, there's nothing specific to learn, as long as you see with your eyes, what you hear with your ears, what you touch with your palms, it's all you have to learn, but there's no need to be serious!

    Good luck with your studies! Look at the drawings yourself when the construction site is fine, learn the quota, recognize the material, understand the material** on the line!

  10. Anonymous users2024-01-28

    1. Engineering cost major, internship first to be a constructor, this statement is inappropriate, it should be the best internship to go to the construction site, can be a construction assistant, such as cost clerk, data clerk, construction assistant. If you don't have a work permit, you can't be a construction worker directly.

    2. Reason: The cost work is a relatively comprehensive work, which requires you to understand the design, the construction process, the material performance, the cost knowledge, and some financial knowledge, the most important thing is the knowledge of construction. How much does a house cost, you don't understand the construction process, you can only simply calculate the amount of work, but the project classification and quota set are not accurate, and what the quota contains is consistent with the construction, you have to figure it out.

    Also: for the calculation of the measure fee, it is closely related to the construction plan, there is a construction plan, there is a corresponding measure fee, do not understand the construction management, of course, can not make a list of measures. On the construction site, you can also have an intuitive knowledge and understanding of the performance of commonly used building materials, and have a preliminary grasp of the materials, which is conducive to the correct pricing when budgeting.

    3. To sum up: it is necessary for newly graduated cost students to stay on the construction site for 2-3 years, at least one project from the start to the completion of the whole process, to the construction site must pay attention to their own safety.

  11. Anonymous users2024-01-27

    First of all, it is necessary to link theory with practice, link on-site practice with calculation rules, and integrate him into the measurement and pricing process! For the process flow that is helpful to the list items, it is necessary to know the main process, and the sub-process has been included in the quota and is no longer listed, so you can choose to visit and study 1

  12. Anonymous users2024-01-26

    As an engineering cost internship, you should pay attention to the following issues:

    1.First of all, it is necessary to understand the construction process practices.

    2.The difference between the drawings and the actual construction.

    3.Memorize the calculation rules.

  13. Anonymous users2024-01-25

    Missing a fraction of a millimeter can make a difference – be careful when doing a budget internship and be accurate in entering every piece of data, otherwise it will lead to a large deviation.

    The work is tedious - patience, it is boring and frustrating to calculate some data, so you must be patient to calculate, so that you can settle down and make the results accurate.

    Seek advice with an open mind - during the internship, the knowledge learned in school is a little scratchy, just for you to learn better in the future, so you have to ask more and do more to know some of the mysteries.

    It's a good idea to keep some important data in mind (layer height, length, width and height of the build) when reading the map, so that you can do the next work more efficiently.

    Do your job seriously and wait for people's appreciation.

  14. Anonymous users2024-01-24

    The development prospect of the project cost is good, and the longer the life, the more popular, after the completion of the study, such personnel are treated higher, the working life is longer, is a very potential for the development of professional technology. (Beginners to the construction site is the best, you can learn the drawings and the real thing, can enhance your perceptual understanding, understand the construction process, detailed practices, a project from the start to the completion of the project, you can quickly improve your actual calculation ability and the budget sub-items to deepen the understanding, mastery, for the beginner cost is helpful, and then to the cost consulting unit and then the system to learn the price and calculation software.) It is recommended that you start as a trainee construction worker, grasp the present, and work hard to study professionally in your spare time.

    If it's a boy, it's not bad to develop in the direction of construction, starting from the construction worker, it's best to start from the project to level the field, pay off the line, and dig the earth. . . After the completion of the project, learn the process flow of the project, the intersection and cohesion of various types of work and coordination, the control of key parts and key points (quality, progress, safety), master the construction specifications and relevant standard requirements, the construction process flow, construction personnel and schedule, cooperate with the on-site safety officer and quality officer to do a good job in safety and quality management, etc., and then learn to take the second-level construction engineer (in the future, strive to take the first-level construction engineer), and develop in the direction of project manager.

    The above is for reference and is decided according to the specific situation of the individual. Good luck.

  15. Anonymous users2024-01-23

    It's best to know more about business-related things. But the construction staff is not bad, you can talk to those contractors more, talk about labor, materials and the like, those are real, much stronger than the quota. This will help you a lot to continue your business in the future.

  16. Anonymous users2024-01-22

    In the construction unit, if you are in the unit, it is best to enter the technical department, you can learn more things on site, and it will also be beneficial for the future. The cost is not the surface of knowledge, it needs to be accumulated, since the cost of learning, it is best to go to the construction site to practice as a construction worker first.

Related questions
16 answers2024-03-18

Civil construction, right? What civil engineer? It's too big. >>>More

6 answers2024-03-18

The case analysis of project cost must first be classified by industry, because different industries have different frameworks, contents, controls, and final summary analysis of project costs, and management methods and means are also different. However, in general, everyone follows one principle - comprehensive - full - full - full - real time - closed loop. >>>More

11 answers2024-03-18

Judging from the current domestic and foreign data, the social status and economic status of the cost engineer's professional qualification are proportional to the development of the market economy. >>>More

12 answers2024-03-18

Look at what you like, the two professional learning directions and employment directions are different, the working environment is not the same, engineering surveying: mainly learn digital topographic surveying, control surveying, survey and planning surveying, engineering construction surveying, engineering deformation monitoring, cadastral surveying, land management and GPS surveying and other professional courses, the main employment is some water conservancy and hydropower, urban construction, roads, bridges, industrial and civil buildings, land management and other departments, engaged in the design, construction and organization management of surveying projects, etc., The working environment is not very good, mainly field work. >>>More

15 answers2024-03-18

If the registered cost engineer is practiced, it is necessary to have the certificate of registered cost engineer and the certificate of the work unit, and it is not necessary that the work unit must have the qualification of engineering cost consulting, only the engineer can engage in the relevant cost work. So what the landlord asked, yes.