    The entrance door to the elevator, as well as the height of the corridor elevator from the ground 1 meter should be protected with mulch, the entrance door should be covered with a door sleeve, 86 boxes should be covered, and the floor drain should be blocked, so as to avoid the phenomenon of sewer blockage caused by cement deposition in the construction process.

    When the materials are accepted and the decoration materials are stacked, it is necessary to check whether the materials on the decoration budget list are consistent with the decoration materials sent to the site, otherwise it will be troublesome if the decoration materials are sent wrong. When the material enters the site, the owner must be on the spot, the brand, quality, quantity, etc. of the material to check, for the new arrival of the wall and floor tiles not only to check the brand model, but also to check its quality, to see if there is a color difference. Water pipes and wires, etc., should also pay attention to verify the authenticity.

    The reasonable storage and placement of decoration materials is a university problem, which is not a simple manual work.

  2. Anonymous users2024-02-06

    House decoration is a huge project, although the decoration can choose half or even full package repair mode, but the basic process of decoration still needs to understand the decoration process to understand the progress of the project. So, what is the renovation process for a new house? Let me introduce you below.

    1. Project disclosure.

    Before the house is renovated, it is the project disclosure, the owner is present, the designer and the worker give the truth, when the disclosure is made, how to decorate the house with the workers, how to solve some problems during the construction, and the designer will explain to the owner.

    When the wall is demolished.

    When workers began construction. The first step is to build the walls and remove the walls where they need to be corrected. It should be noted that some walls cannot be removed, such as:

    load-bearing walls. Walls and concrete walls are non-removable. If the load is removed, the building will collapse, so the load-bearing and concrete walls are immovable.

    2. Water pipe construction.

    It should be completed in the construction of water pipes: strictly follow the principle of left heat and right cooling; In strict accordance with the national construction standards, the cold and hot water pipelines are connected to the test pumps. No drowning, dripping or leaking.

    Must pass a pressure test, the test can pass through the wall without any leaks, drips or **.

    3. Circuit construction.

    Carry out electrical construction. After the construction is completed, an electrical test should be carried out. Test the power supply with a bulb, the bulb is not lit, and check whether the terminal is insulated and strong. Must be tested. In order to avoid rework after embedding, Yansen Yinge is built in accordance with the national power building.

    4. Bricklayer construction.

    After the construction of hydropower, bricklayers entered the market. Bricklayers pave wall tiles. When laying out, it is necessary to look at the techniques of the master builders. In general, when laying floors, first look at the tiles correctly, and then cut them widely.

    5. Carpentry construction.

    Once the bricklayer is complete, it's time to get into carpentry. Wood products are mainly used for top molding and wall molding. Only when the substrate is completed, the next step of construction is carried out, and anti-rust treatment should be paid attention to during the carpentry construction process.

    6. Paint construction.

    When the tile worker enters the site, he is an oilman. The oiler is the wall after the treatment of the base layer. If it is a wallpaper, it will be polished. After the wallpaper is delivered, the person who posted the wallpaper posted. After the oiler, some custom furniture installation and light fixture installation!

    Finally, we'll finish the finishing work. Finally, we had to install not only the hardware components in the kitchen and bathroom, but also the doors and door covers in each room, and the acceptance and acceptance of the entire house. In order to match the soft furnishings. I hope these can help you.

    You can get it for free

  3. Anonymous users2024-02-05

    The first way to get the house is to understand what the process of house decoration is, the quality of the decoration design effect is equally important, in order to avoid everyone decorating into the misunderstanding, Shanghai Dongyi Risheng Decoration Sumei Super Home summarized how the Shanghai house decoration company is working to help you decorate smoothly.

    1. Pay attention to the overall planning of Shanghai's house decoration.

    There are many factors to consider when renovating a house. To harmonize all the spaces, the designer had to plan the design from the ground up.

    2. Pay attention to the selection of housing decoration materials in Shanghai.

    When choosing materials for house decoration or common room decoration, the first thing to consider is safety, especially for families with elderly people and children at home. In the bathroom design, try to use rounded corners to avoid injuries caused by bumps. The floor should be non-slip, the height of the handrails should be moderate, and it is also important to use less glass or metal products in the home.

    3. Pay attention to the operation of the home system.

    In the ground space is sufficient, home safety must be considered. If possible, there is the option to install a home system that is smarter than a regular TV. Even if the host is not at home, you can automatically call the community** if there is an emergency in the defense system.

    4. Pay attention to the structural design of the attic.

    If the distance between the buildings is large, the attic can be separated from the middle, but the design of the attic should be firmly grasped. Regardless of the horizontal or vertical wall structure, material loads, partition wall thickness, and height ratios must be considered.

    5. Pay attention to the wiring placement.

    Electrical equipment is important for the whole family, especially in damp bathrooms and kitchens, and try to use computers to simulate the location of appliances and outlets so that they can be used normally in the future. In addition, the bathroom design can be completely divided into dry and wet areas, and the power socket should be installed in the dry area as much as possible.

    6. Pay attention to the placement requirements of the lamp.

    Lighting choices are also particularly important in house decoration. It mainly depends on its use and location. The intelligent system is equipped with a dimming system that can control the lighting as needed, and can simulate changes in natural light. Natural light is easily felt as soon as we touch the switch or remote control.

    This is the general process of house decoration, if you don't know anything, you can continue to ask us.

  4. Anonymous users2024-02-04

    Civil engineering stage, grassroots treatment stage, detail treatment stage.

    1. Civil construction stage: entering the site, demolishing the wall, building the wall; Trenching, hydropower renovation and acceptance; Concealed water and electricity renovation project of sealing and burying trunking, waterproofing project, 24-hour closed water test on the floor of bathroom and kitchen; Bathrooms and kitchens are tiled on the walls and floors.

    2. Grassroots treatment stage: carpentry approach, hanging ceiling, gypsum corner; Wrapping door covers, window covers, making wooden cabinet frames; Synchronous production of various wooden doors, modeling doors and flat pressure doors; Wooden panels brushed with dustproof paint (clear oil); window sill marble countertop leveling; Wood veneer pasting, line making and fine installation;

    wall base treatment, grinding, leveling; Furniture, door and window edges are pasted with stickers (protective edges) on the seams.

    3. Detail treatment stage: the wall is painted at least three times; Furniture paint entry, nail holes, paint; treatment of corners, laying of floor tiles, solid or laminate flooring, waterproofing of marble strips, baseboards; installation and commissioning of lamps, switches, sockets, sanitary ware, handles, and door locks; Cleaning and sanitation, floor tile repair, and withdrawal; Preliminary acceptance within the decoration company; The three-party appointment time is formally accepted and delivered to the owner.

    Decoration precautions:

    1. Don't move the load-bearing wall.

    The load-bearing wall is the supporting pillar of the house, and it must not be removed, some friends who are not very clear about the structure of their house, not to say the house structure, but to say the direction of force, if you don't understand this, you can ask the developer or decoration designer on the line. However, the load-bearing walls of the house are generally at the four corners of the wall, and these walls cannot be removed, otherwise it will be very dangerous and even endanger the whole building.

    2. Marble should not be used on the ground.

    The reason is that the weight of marble is many times heavier than that of ordinary floor tiles, etc., and if marble is used on the floor, it will cause a great burden on the floor. According to authoritative data, the material used for one square meter of floor cannot exceed 45kg.

    3. The door sleeve should be coordinated.

    Half of the doors in the current room are more set of doors, because of beauty, price and other related reasons. However, it should be noted that the edge of the door needs to be filled with enough cement oil to sew the tile floor on the edge!

    4. The floor of the bathroom should be tilted.

    When it comes to the bathroom, it is definitely inseparable from water, and even more inseparable from waterproof treatment. There is often a lot of water here, but if the ground is too sloping, it will be unsightly, so the bottom of the funnel should be 3-5cm different from the highest.

    5. Copper wire for wires.

    It is best to use copper wire for wire, do not use wire of other materials, generally speaking, copper wire has good conductivity and less heat. In addition, the toilet should always be well ventilated and hygienic to avoid germs and protect the health of family members.

  5. Anonymous users2024-02-03

    A how to decorate the first thing that needs to be done is the decoration design for the new house decoration knowledge to be fully understood before the decoration, the new house decoration, first of all, the decoration design, the overall effect will be good, the house design plays the role of an overall framework, including the overall style of the house, the design of each room, and even for building materials, the basic decoration budget, the basic time node to be understood, these are designed in the early stage of the design. B how to decorate the second thing that needs to be done is waterproof engineering waterproofing is particularly important for every family, in the new house decoration knowledge, waterproof engineering as a must do work, waterproof engineering can not only ensure that the water of their home will not seep down to the downstairs, but also to ensure that the water will not seep into their other rooms, waterproof engineering to do is to ensure the safety of downstairs and around themselves, to prevent water leakage, water will also corrode furniture and wires. C how to decorate the new house needs to do a good job of the third thing is the hydropower renovation project Hydropower renovation project is a hidden project, the so-called hydropower transformation is actually the transformation of the hydropower line, because after the new house above, the hydropower line is not necessarily suitable for their own decoration needs, must be based on the decoration design of the hydropower line transformation, so that the later decoration will be more beautiful, the line is buried in the wall, the second is to maximize the future water use, electricity, so that it will be more convenient.

  6. Anonymous users2024-02-02

    The procedure is roughly as follows.

    1. Transform the indoor structure (this step is not necessary), some people want to transform the indoor structure, the non-load-bearing wall can be moved, and the load-bearing wall cannot be moved.

    2. Transform water and electricity, the switch of some circuits does not meet your own wishes, or you want to install circuits in some positions, and you need to install water heaters, basins, bathtubs, etc., so you must take the waterway in advance, because these can be buried when paving tiles, and they are made into concealed installations, which are more beautiful.

    3. Ground leveling, the ground of some houses is not very flat, and the horizontal error is relatively large, so it is necessary to find the level.

    4. Lay floor tiles, paste tiles, and make the bathroom floor and wall waterproof, for safety reasons, it is best to do more than 2 courses.

    5. Do carpentry, package door covers, window covers, etc., buy solid wood doors, only need to package door covers, followed by furniture (except for self-purchased furniture), cabinets, hanging cabinets, washing cabinets, ceilings, water heaters, etc.

    6. Indoor painting, furniture painting 7. Installing wooden floors, installing lights, installing toilets, installing pools, etc.

  7. Anonymous users2024-02-01

    The renovation of a new house is a very complex project, so let's take a look at the process and steps of the renovation of a new house.

    Step 1: Change water, electricity and heating, including the location and layout adjustment of kitchen and bathroom water pipes. According to the principle of ergonomics, the height and position of the water pipe often have to be changed greatly, for example, the water pipe access height of the toilet may not be the same as the reserved height.

    electricity, mainly considering the transformation of energized lines. Change the location and number of switches and sockets to make them more rational.

    warm, heated or underfloor heating. It needs to be designed in advance.

    The reason why water, electricity and heating are listed as the first step is that if the early stage is not well considered, it will lead to inconvenience in construction.

    Step 2: Floor tiles and wall tiles.

    In the first step, after the water, electricity and heating are adjusted, the floor tiles and wall tiles need to be paved.

    Step 3: House ceiling.

    Suspended ceilings for living rooms, bedrooms, study, dining rooms, kitchens, bathrooms, and balconies.

    Step 4: Wrap the door and mouth.

    The decoration of doors and windows, as well as the production of some furniture accessories, such as entrance treatment, TV background wall production, etc.

    Step 5: Painting the walls.

    Wall painting, you can use painting, wallpaper, wall covering, etc.

    Step 6: Primer topcoat.

    Priming and topcoat of doorways, windows, and parts of furniture.

    Step 7: Lighting installation.

    Install all the lamps in the room, including all kinds of ceiling lights, downlights, chandeliers, spotlights, etc.

    Step 8: Ventilation and cleaning.

    Maintain good ventilation conditions and sufficient ventilation time.

  8. Anonymous users2024-01-31

    Renovation process.

    Attention to the decoration of the new house: the first out plan.

    Attention to the decoration of new houses: water and electricity renovation.

    Attention to the decoration of new houses: paving floor tiles or painting walls.

    Attention to the decoration of the new house: the installation precautions for doors and curtains, bathroom and kitchen supplies.

    No matter how environmentally friendly paint is, there is pollution, and the volatilization of formaldehyde and other pollutants in paint is a long process, and it may still volatilize after 10 years.

    In the process of choosing materials, some details should not be missed, such as for hardware and faucets. You can't save where you should spend money.

    The necessary documents must be kept when purchasing things, so as to ensure that the possible returns and exchanges in the later stage can be dealt with more easily.

Related questions
5 answers2024-03-30

DCSDCS, the so-called distributed control system, or distributed system in some data, is a new type of computer control system relative to the centralized control system, which is developed and evolved on the basis of the centralized control system. In terms of system functions, DCS and centralized control systems are not very different, but they are completely different in the way system functions are implemented.

2 answers2024-03-30

Flight Procedure:

1. To the airport. You have to pay attention to the time, because the airline rules that check-in closes 30 minutes before the flight, so you better be at the airport 1 hour before departure. >>>More

10 answers2024-03-30

A quality inspection by the health department is required, and then you will be given a health permit; The specific steps to apply for a brand are as follows:1Application Procedure. >>>More

10 answers2024-03-30

The smell of the new house is very strong after decoration, and it is very likely that the formaldehyde exceeds the standard. >>>More