Weak current specifications, security specifications, monitoring specifications, intelligent specifi

Updated on technology 2024-03-16
5 answers
  1. Anonymous users2024-02-06

    Main national standard specifications:

    GB T50314-2006 Standard for the design of intelligent buildings.

    JGJ T16-92 Code for the design of electrical appliances in civil buildings.

    GB50396-2007 Engineering design code for access control system.

    GB50394-2007 Code for engineering design of intrusion alarm system.

    CJ T166-2006 Integrated circuit (IC) card application technology for construction business

    GB50371-2006 Code for design of hall sound reinforcement system.

    GB50339-2003 Code for Quality Acceptance of Intelligent Building Engineering.

    GB50093-2002 Code for construction and acceptance of automated instrument engineering.

    GB50348-2004 Technical specification for safety precautions.

    GB50200-94 Technical specification for cable television system engineering.

    GB50174-93 Code for design of computer room.

    GB50343-2004 Technical code for lightning protection of building electronic information system.

    GB T50311-2007 Code for engineering design of integrated wiring system.

    GB T50312-2000 Code for Engineering Acceptance of Integrated Wiring System for Buildings and Building Complexes.

    GB50198-94 Engineering Technical Specification for Civil CCTV Systems.

  2. Anonymous users2024-02-05

    First, the installation method of the surveillance camera:

    1. In a strong electromagnetic interference environment, the installation of surveillance cameras should be isolated from the ground insulation.

    2. Under the condition of meeting the requirements of the field of view of the monitoring target, its installation height: indoor ground clearance should not be lower, outdoor ground clearance should not be lower.

    3. The surveillance camera in the elevator compartment should be installed on the left or right side above the compartment door, and can effectively monitor the facial features of the occupants in the elevator compartment.

    4. Surveillance cameras and their supporting devices, such as lenses, camera covers, brackets, wipers, etc., should be installed firmly, operated flexibly, should pay attention to anti-vandalism, and coordinate with the surrounding environment.

    5. The signal cable and the power cord should be introduced separately, and the exposed part should be protected by a hose and will not affect the rotation of the gimbal.

    Second, the installation of surveillance camera control equipment:

    1. All cables in the control room should be set up with cable troughs and inlet holes according to the installation position of the equipment, arranged and bundled neatly, numbered, and with permanent signs.

    2. The installation position of the console and cabinet (rack) should meet the design requirements, and the installation should be stable and firm, easy to operate and maintain. The net distance between the back and side of the cabinet frame and the wall should meet the maintenance requirements.

    3. The installation of all terminal equipment such as control, display and recording of surveillance cameras should be stable and easy to operate. Among them, the monitor (screen) should avoid direct external light, and when it is unavoidable, measures should be taken to avoid light. The equipment installed in the console and cabinet (rack) should have ventilation and heat dissipation measures, and the internal connectors should be firmly connected to the equipment.

    3. PTZ and decoder installation:

    1. Check whether the rotation angle range of the gimbal meets the requirements according to the technical conditions of the product and the system design requirements.

    2. The installation of the gimbal should be firm and no shaking when rotating.

    3. The decoder should be installed near the gimbal or in the ceiling (but there must be a manhole).

  3. Anonymous users2024-02-04

    Design specifications and rationale.

    The establishment of a set of safe, reliable, on behalf of the advanced level of security technology prevention system is a must for modern production, life safety and modern management, so our company will be in accordance with the relevant industry regulations combined with user requirements, focus on the main technical force of our company, in line with the provisions of the public security department under the premise of the household design scheme, the design according to the People's Republic of China and the Ministry of Public Security industry management requirements standards and the following standards design:

    Safety precaution engineering procedures and requirements .........GA T75-94 Code for the design of electrical appliances in civil buildings.........JGJ T16-92 Code for design of office buildings.........GBJ67-89 ......... for risk levels and protection levelsGA T38-92 Engineering Technical Specification for CCTV System for Civil Buildings ......GB50198-94 General technical specifications for burglar alarm controller .........GB12663-90 Code for Construction and Acceptance of Electrical Installation Engineering in China.........GBJ232-82 Code for Engineering Design of Integrated Wiring System for Buildings and Building Complexes....The type of system grounding and safety technical requirements .........GB14050-93 Code for the design of electrical appliances in civil buildings.........JGJ T16-92 Code for design of office buildings.........GBJ67-89 On-site environment and Party A's requirements.

    In short, our company will embody professional technical standards, play the best level, so that the equipment used to maximize its performance, and will take all methods to make all materials and installations meet all the latest and most common international standards and specifications.

  4. Anonymous users2024-02-03

    There are more standards and specifications involved in this, and there are more than 10 of them!

  5. Anonymous users2024-02-02

    Installation Fundamentals Series Course 2 Weak Current Engineering Digital Monitoring and Access Control System.

Related questions
7 answers2024-03-16

Code for Design of Concrete Structures (Partial Revision in 2015) GB50010-2010; Code for Acceptance of Construction Quality of Concrete Structure Engineering GB50204-2015. These two specifications are the latest national standard versions, one design specification, one construction acceptance specification, and two supporting books.

18 answers2024-03-16

Home |Know |Sign in |Enroll.

Where the words are not standardized. >>>More

7 answers2024-03-16

It should meet the requirements of normal appearance, capacity detection, pressure detection and residual quantity. >>>More

8 answers2024-03-16

1. First of all, we must have the correct attitude and the spirit of hardship and endurance, and at the same time, we must also have the determination to practice the words well. It takes time to hone a good handwriting to make it clear. >>>More

3 answers2024-03-16

a.Pre-opening Pei Fan Exhibition Institution Tuberculosis Infection Risk Assessment (Correct Answer) BDevelop an infection prevention and control plan (correct answer). >>>More