What does 94 in the garden budget mean?

Updated on Financial 2024-03-12
13 answers
  1. Anonymous users2024-02-06

    Hello, the seedling budget is based on the recent seedling market. During this period, your company needs a lot of inquiries and has come up with the most authentic seedlings**.

  2. Anonymous users2024-02-05

    The content comes from the user: Yima Pingchuan Dream.

    Calculation rules for landscaping projects.

    1. Cofferdam project.

    The cofferdam project is divided into earth cofferdam and straw bag cofferdam: the engineering quantity of the earth cofferdam is calculated according to the length of the cofferdam in the extension meter; Straw borrowing bag cofferdam worker.

    The volume is calculated in cubic meters.

    Second, landscaping projects.

    1 Regardless of the size of the tree, it is counted on a per-tree basis.

    2 Planting flowers and digging turf are calculated in square meters.

    3 Hedge planting, regardless of single row or double row, is calculated in the extension meter.

    3. Pile up rockery and plastic rockery project.

    1. The engineering quantity of the rockery is calculated in tons according to the actual number of stones used. Calculation formula: stacking rockery engineering quantity (tons) = feeding.

    Accepted quantity - the remaining quantity of the incoming material.

    2. The engineering quantity of the plastic artificial stone mountain is calculated in square meters according to its peripheral area.

    Fourth, mountain roads, garden bridges, ground.

    1. All kinds of garden road cushions are calculated according to the size shown in the design drawing, and the width of each side is 5cm multiplied by the thickness in cubic meters.

    2. All kinds of garden pavement layers are calculated according to the size shown in the design diagram and calculated according to square meters.

    3. Garden Bridge: Rubble foundation, abutment, pier and slope protection are calculated in cubic meters according to the size shown in the design drawing. Stone bridge deck by square meters.

    Compute. 4. The indoor floor is calculated based on the area between the main walls, excluding the capstone of the western hemisphere, the landing columns, the buttresses and the partition walls.

    The area occupied by the wall should be deducted from the above Buddha statue base, incense burner base and other interior decoration base area, outdoor floor and scattered water do not deduct the area occupied by the ceiling pendant, should be deducted above the tree pool, flower bed, ditch cover

    The area occupied by Sumeru, Zhaobi, etc.

    5. The area occupied by bricks and tiles is not deducted from the stone floor, and the area occupied by the brick core should be deducted when laying the brick core. (Three garden roads, garden bridges, floors for some of the more complex links in the construction, need special attention.) For example, some terrain treatment is often required in greening projects, because the green elevation shall prevail, such as the elevation difference between the design floor and the natural floor is 6.

    Receiving and other information,

  3. Anonymous users2024-02-04

    Measure the width of the mound at its narrowest and widest point (measure it along the arc of the mound), calculate the average, and multiply it by the straight length of the mound (the length of the entire mound in a straight line). Not the most precise, but guaranteed not too much. That's basically the same way when we do engineering, it's simple and convenient.

  4. Anonymous users2024-02-03

    1. The arbor area should be deducted.

    2. I don't know if you make the final accounts, the understanding of the construction is not known, you can ask them how much the lawn is when they come to the seedlings, and then the lawn planting density, the general lawn is 6 small lawns a square, you only need to test how much area 6 lawns occupy, test a few more points after the average and the ratio of 1 square multiplied by the total amount is equal to your lawn area. . .

  5. Anonymous users2024-02-02

    The project settlement is generally a little higher than the project budget and the contract price, and the settlement has no impact on the money you get, the money is paid according to the contract, and the settlement is not so high. As for the area problem you said, there is no need to calculate it so precisely, for example, the area of the arbor potholes is a small problem, you can ignore it, and the area of the small mound can also be ignored (I mean to count it as flat land), just add a little bit of the area you calculated, if you are afraid that the ** will not go up, increase your grass ** a little, and such as freight, other material costs and so on can also be increased a little!

  6. Anonymous users2024-02-01

    The comprehensive unit price in the budget of landscaping project: It is the comprehensive cost of work, material and machine, comprehensive management costs and profits (excluding measure fees, fees and taxes) that need to be spent to complete the physical content of the project characteristics described in the list items

    The cost of greening project is composed of two major contents: one is the direct cost of the project; The second is the overhead cost of the project.

    The direct cost of the project, as the name suggests, refers to the direct cost part of the completion of the green planting project, which mainly includes three aspects.

    1. Labor costs: including seedlings purchased to the construction site, seedling yard transportation, digging pits, soil change, planting, soil covering, moisture protection, watering, enclosure ......The total cost of labor until the completion of the maintenance period of one month.

    2. Material costs: including the cost of seedlings of various varieties and specifications, as well as the cost of auxiliary materials necessary for planting. Auxiliary materials include water for seedling irrigation, straw rope and lead wire for trunk protection, as well as various bamboo piles, wooden piles, cement piles and other materials.

    3. Machinery costs: including large-scale seedlings, when they cannot be carried manually, they must be transported to the design position by machinery, and then lifted, reset, righted and other mechanical wear and tear costs.

    The three costs of labor, materials and machinery are specified in detail in the quota, and under normal circumstances, they are not allowed to be changed at will. However, the quota is based on the normal construction method to determine the cost of labor, materials, and machinery. Due to the ever-changing conditions and climate of the construction project, the quota also stipulates that uncertain factors other than the quota provisions are allowed, and the project cost shall be increased by both parties A and B according to the actual situation of the construction site, but the project cost can only be increased after consultation and agreement between the two parties A and B, and the supplementary clauses are added to the construction contract.

    The indirect cost of the project refers to other expenses that the construction enterprise must charge after the completion of the greening planting project, which is an indispensable part of the cost of the greening project.

    These include: the expenditure of technical management personnel and enterprise management expenses of the construction enterprise, the legal profits of the enterprise and the taxes paid to the state (or the higher management department).

    The amount of indirect costs charged for the project is based on the scale of the greening planting project, which is clearly stipulated by the municipal construction project quota management station, and cannot be increased or decreased at will.

  7. Anonymous users2024-01-31

    Bill of Quantities Valuation Specification:

    1. When valuing, the comprehensive unit price calculation method of landscaping can be understood as follows: the comprehensive cost of work, material and machine, comprehensive management expenses and profits (excluding measure fees, fees and taxes) that need to be spent to complete the physical content of the project characteristics described in the list subheadings.

    2. Generally, a list of sub-items will correspond to at least one sub-item of the group price quota (specifically to be more described, and the specific description of the project characteristics), as for whether to use the price list or the quota, it should be implemented in accordance with the relevant provisions of the local competent authority.

    The project budget is a plan for the income and expenditure of the project in a certain period of time in the future.

    It can be used to evaluate the investment of the project in the form of money and reflect the economic effect of the project. It is the basis for strengthening enterprise management, implementing economic accounting, assessing project costs, and preparing construction plans; It is also the main basis for project bidding and determining the cost of the project.

    In view of these two complementary aspects of the operational budget, there are two basic approaches to budgeting:

    1) Periodic Budget: In this budget, a plan is made for the next fiscal year that will be the least changed over time. In general, the expected total cost per year is amortized over the course of the year on a monthly, factor-cost basis.

    In this way, the monthly "salary" is simply amortized over each month as 1 12 of the expected costs, while the seasonal fluctuations in sales require a little more attention to marketing and production costs and changes in costs in the course of fluctuations.

    2) Continuous (rolling) budget: In this budget, a pilot annual plan is prepared, in which the first quarter is prepared in detail by month, the second and third quarters are relatively brief, and the plan for the fourth quarter has only a rough outline, and every month (or perhaps quarterly) the budget is revised by adding the details required by the next month (or quarter) and adding a new month (quarter), so that the plan is extended into one year, This kind of budgeting process is very desirable to adapt to changes in the environment and the impact of some uncertainties. Because it forces managers to constantly consider specific conditions for the new year, no matter where they are in the current financial year. Regular budgeting is often satisfactory for companies in stable industries, as they can make relatively precise plans for the planning period.

    Conversely, rolling budgets have greater value in the more common case of certain irregularly cyclical activities brought about by uncertain consumer demand.

  8. Anonymous users2024-01-30

    If you calculate it, the sum of the ** of each sub-item is divided by the number of items in the comprehensive unit price, which is the comprehensive unit price.

  9. Anonymous users2024-01-29

    Labor costs, material costs, machinery costs, taxes, profits.

  10. Anonymous users2024-01-28

    This Qi envy, you have to communicate with the owner of the industry.

    See if they do the same with you.

    We usually do visas and stuff like that first.

    Then put the newly changed Miao faction Qi Mu to the budget in the visa.

  11. Anonymous users2024-01-27

    The cost of seedlings is reflected in the comprehensive unit price of seedlings, that is to say, the money for buying seedlings and the money for transportation and celebration are included in the comprehensive unit price of seedlings, and the cost of seedlings is supplemented by a fixed amount in the budget.

  12. Anonymous users2024-01-26

    Question one, look here!

    Question two, look here!

    What can be seen counts!!

  13. Anonymous users2024-01-25

    The term engineering cost refers to the cost of the main material in the first composition of the product, which is called the main material cost, such as the comprehensive unit price of seedlings.

    Including seedling cost, labor cost, auxiliary material cost, machinery cost, management fee, profit, tax, main material cost, that is, seedling cost.

Related questions
19 answers2024-03-12

To put it simply, the receiver does not touch the opponent's valid serve at all, and this kind of serve is called an ace.

16 answers2024-03-12

Cash-like assets refer to the monetary funds held by the enterprise and the assets that will be received in a fixed or determinable amount, including cash, bank deposits, accounts receivable and notes receivable, and bond investments that are ready to be held to maturity. The first question is C. >>>More

11 answers2024-03-12

The air compressed device in a pneumatic system usually consists of three parts: >>>More

9 answers2024-03-12

Vegetables are vitamin A, vitamin B2, vitamin C, vitamin D, vitamin E, vitamin K, carrots, tomatoes, etc. contain vitamin A, and green leafy vegetables such as rape and spinach can provide vitamin B2. Fresh vegetables and fruits, such as greens, leeks, seaweed, sweet peppers. Wild amaranth, kiwifruit, jujube and other vitamin C content is particularly rich. >>>More

18 answers2024-03-12

Walnut, native to the Near East, is also known as walnut and Qiang peach, and is known as the world's famous "four dried fruits" along with almonds, cashews and hazelnuts. >>>More