The completion acceptance stage is the final overall quality acceptance stage, and I am afraid that you may be involved in the information that happened before, so basically all the information during the construction period should be prepared, including:
1. Construction contract documents and entrusted supervision contracts.
2. Survey and design documents.
3. Supervision and planning.
4. Supervision implementation rules.
5. Subcontractor qualification application form.
6. Minutes of the meeting of design disclosure and drawing review.
7. Application form for construction organization design plan.
8. Project Commencement Report Form and Project Suspension Order.
9. Measurement and verification data.
10 Project schedule.
11. Quality certification documents of engineering materials, components, and equipment.
12. Check the test data.
13 Engineering change information.
14. Acceptance data of concealed projects.
15. Project bill of measurement and certificate of payment of project payment.
16 Supervising Engineer Notice.
17 Supervision work contact form.
18 Application Form for Inspection.
19 Minutes of Meetings.
20 Correspondence.
21 Superintendent's diary.
22 Supervisor's monthly report.
23 Handling documents for quality defects and accidents.
24. Acceptance data of the project unit of the division.
25 Claim Documentation.
26. Completion Settlement Review Opinion.
27. Special reports such as quality assessment reports in the construction stage of engineering projects.
28. Summary of supervision work.
-
Supervision contract (some places do not want, because the pre-filing has been sent) supervision planning (including safety supervision planning).
Supervision implementation rules for key specialties (including safety supervision implementation rules), supervision engineer notice (quality and safety).
Supervision logs. Records of the supervision of concealed works.
Inspection records (not required in some places).
Parallel inspection records (not required in some places).
All the construction units to the supervision unit of the report cover, the old specification is a class inspection application, A1 to A10, including the start of the resumption of work application form, construction organization design plan approval application form, process inspection form, subcontracting qualification review application form and so on.
-
The information required for the acceptance supervision of the main body includes: construction contract documents and entrusted supervision contracts, survey and design documents, supervision planning, engineering quality supervision and evaluation reports, construction project quality assessment reports, completion acceptance record forms, project overview, unit project acceptance notice, unit project completion acceptance certificate, quality inspection and functional test data.
[Legal basis].
Article 16 of the Regulations on the Quality Management of Construction Projects After receiving the completion report of the construction project, the construction unit shall organize the design, construction, engineering supervision and other relevant units to carry out the completion acceptance. The following conditions shall be met for the completion and acceptance of the construction project: (1) the completion of the construction project design and the contents of the contract; (B) have a complete technical file and construction management information; (C) the main building materials, building accessories and equipment used in the project approach test report; (D) survey, design, construction, engineering supervision and other units signed by the quality of the documents; (5) There is a project warranty signed by the construction unit.
If the construction project experience is qualified, it can be delivered.
-
1. Construction contract documents and entrusted supervision contracts.
2. Survey and design documents.
3. Supervision and planning.
4. Supervision implementation rules.
5. Subcontractor qualification application form.
6. Minutes of the meeting of design disclosure and drawing review.
7. Application form for construction organization design plan.
8. Project Commencement Report Form and Project Suspension Order.
9. Measurement and verification data.
10 Project schedule.
11. Quality certification documents of engineering materials, components, and equipment.
12. Check the test data.
13 Engineering change information.
14. Acceptance data of concealed projects.
15. Project bill of measurement and certificate of payment of project payment.
16 Supervising Engineer Notice.
17 Supervision work contact form.
18 Application Form for Inspection.
19 Minutes of Meetings.
20 Correspondence.
21 Superintendent's diary.
22 Supervisor's monthly report.
23 Handling documents for quality defects and accidents.
24. Acceptance data of the project unit of the division.
25 Claim Documentation.
26. Completion Settlement Review Opinion.
27. Special reports such as quality assessment reports in the construction stage of engineering projects.
28. Summary of supervision work.
-
1. What information needs to be prepared for project acceptance supervision.
For the completion and acceptance of the project, the materials that need to be prepared include: engineering technical and economic data and signed project warranty.
Second, the project completion acceptance procedures.
At the acceptance meeting, the project construction supervision, design, survey and other parties of the project archives are placed for future reference, and the registration form of acceptance personnel is set up to do a good job in registration procedures.
1. The construction unit shall organize the completion acceptance of the project and preside over the acceptance meeting (the construction unit shall make a brief speech before the meeting, introduce the project completion acceptance procedures and make a summary speech at the end of the meeting).
2. The engineering survey, design, construction and supervision units shall report on the performance of the project contract and the implementation of laws, regulations and mandatory standards for engineering construction in all aspects of the project construction. Such as celery.
3. The acceptance team reviews the project archives of the construction, survey, design, construction and supervision units of Huijing.
4. The acceptance team and the professional group (composed of survey, design, construction, supervision units, supervision stations and other relevant experts organized by the construction unit) inspect the quality of the project on the spot.
5. The professional group and the acceptance team express their opinions and make a comprehensive evaluation of the engineering survey, design, construction, equipment installation quality and various management links; The acceptance team forms the project completion acceptance opinion, fills in the "Construction Project Completion Acceptance Report" and signs it (with the official seal).
Through the above analysis, it is known that according to the provisions of the "Construction Law", the construction project delivered for completion and acceptance must meet the specified construction project quality standards, have complete technical and economic information of the slag Bibicheng and the signed project warranty and other materials, and the construction project can only be delivered after the completion experience is qualified.
Construction Law of the People's Republic of China
Article 61 The construction project delivered for completion and acceptance must meet the prescribed construction project quality standards, have complete engineering technical and economic data and a signed project warranty, and meet other completion conditions stipulated by the State.
The construction project can only be delivered after the completion experience is qualified; If it has not been accepted or the acceptance is unqualified, it shall not be delivered.
-
Legal analysis: 1. The information that the supervisor needs to prepare is:
1) Pre-project documents. Including the feasibility study report and annexes, and the approval opinions of the feasibility study report;
2) Project completion acceptance documents. Including the project overview table, project completion summary;
3) Construction technical documents. Including building electrical engineering documents, communication and air conditioning engineering documents;
4) As-built drawings.
2. Legal basis: Construction Law
Article 61 The construction project delivered for completion and acceptance must meet the prescribed construction project quality standards, have complete engineering technical and economic data and a signed project warranty, and meet other completion conditions stipulated by the State.
The construction project can only be delivered after the completion experience is qualified; If it has not been accepted or the acceptance is unqualified, it shall not be delivered.
Legal basis: Building Act
Article 61 The construction project delivered for completion and acceptance must meet the prescribed construction project quality standards, have complete engineering technical and economic data and a signed project warranty, and meet other completion conditions stipulated by the State.
The construction project can only be delivered after the completion experience is qualified; If it has not been accepted or the acceptance slipper is unqualified, it shall not be delivered for use.
-
Article 16 of the Regulations on the Quality Management of Construction Projects After receiving the completion report of the construction project, the construction unit shall organize the design, construction, engineering supervision and other relevant units to carry out the completion acceptance. The following conditions shall be met for the completion and acceptance of the construction of the sedan car: (A) the completion of the construction project design and the contents of the contract; (B) have a complete technical file and construction management information; (C) the main building materials, building accessories and equipment used in the project approach test report; (D) there are survey, design excavation, construction, engineering supervision and other units signed quality documents; (5) There is a project warranty signed by the construction unit.
Only those who have passed the construction project experience can be delivered. Article 17 of the Regulations on the Quality Management of Construction Projects shall be in strict accordance with the provisions of the State on the management of archives, timely collection and sorting of documents and materials in all aspects of the construction project, establish and improve the construction project files, and after the completion and acceptance of the construction project, the construction project files shall be transferred to the construction administrative departments or other relevant departments in a timely manner.
-
The pre-acceptance of the project is not clearly stipulated in the project acceptance procedure, that is to say, it is a process acceptance, which is a process acceptance of the construction unit and the director to prepare for the completion acceptance, and there are also large projects or for some reason to divide a unit project into two acceptance process acceptance.
Bidding documents, contracts and supplementary agreements, construction drawings, construction drawing budgets, as-built drawings, settlement documents, design changes, on-site visas, concealed project acceptance records, meeting memos, materials negotiated with the owner, product information test reports, etc.
The project completion acceptance has been qualified, and the project completion acceptance report has been completed;
The engineering quality supervision agency has issued a project quality supervision report;
The registration and verification procedures of the project supervision contract and the filing and verification of the construction contract (general contractor, professional subcontract and labor subcontract) have been handled; Special funds for bulk cement have been settled.
All the branch acceptance is qualified and the testing data is complete.
Summary. How to write the perception data of the completion and acceptance of the landscaping project. >>>More
1. After the completion of the unit (sub-unit) project, the contractor shall organize the relevant personnel to self-inspect according to the quality standards and design drawings, and evaluate the test results, and fill in the "Project Completion Inspection Form" after meeting the requirements and attach the project acceptance report and complete quality data to the project supervision agency to apply for completion pre-acceptance. >>>More
During the construction process of the project, the responsible subjects of all parties involved in the construction of the project can perform their respective duties in accordance with the rights and obligations stipulated in the Construction Law and the Regulations on the Quality Management of Construction Projects, and all units have established a quality responsibility system. The construction unit shall exercise its duties in strict accordance with the provisions of the contract, and there is no obvious illegal behavior, in the pile foundation, foundation groove, foundation, main body insulation and energy saving and completion acceptance, all parties responsible for the subject shall participate in the acceptance, and the qualification and acceptance procedures of the acceptance subject shall meet the requirements. The project is divided into 7 divisions, the division is accurate, and it is verified to meet the design requirements and the provisions of the construction quality acceptance specifications, and the division acceptance is qualified. >>>More