How to fill in the detailed list of construction project completion acceptance

Updated on society 2024-02-15
4 answers
  1. Anonymous users2024-02-06

    1. After the completion of the unit (sub-unit) project, the contractor shall organize the relevant personnel to self-inspect according to the quality standards and design drawings, and evaluate the test results, and fill in the "Project Completion Inspection Form" after meeting the requirements and attach the project acceptance report and complete quality data to the project supervision agency to apply for completion pre-acceptance.

    2. The supervising engineer organizes the professional supervision engineers to verify the completion data: the engineering of each branch of the unit project has been accepted and the quality acceptance is qualified; According to the provisions of the "Unified Standard for Construction Quality Acceptance of Construction Projects" and the relevant professional quality acceptance specifications, the relevant information documents are complete.

    3. The safety and functional inspection data of the branch projects involving safety and use functions shall be reviewed item by item according to the Unified Standard for Construction Quality Acceptance of Construction Projects. It is not only necessary to check its completeness (there are no missing items). Moreover, the witness sampling inspection report supplemented by the acceptance of the branch project should also be reviewed.

    4. The supervising engineer shall organize the professional supervision engineer together with the contractor to conduct a comprehensive inspection and testing of the quality of the project in each specialty, and conduct a visual quality inspection according to the unified standard for the acceptance of construction quality of construction projects, and issue the "Project Quality Rectification Notice" for the problems found that affect the completion and acceptance, and require the contractor to rectify, and the contractor shall complete the rectification, fill in the "Supervision Engineer Notice Reply Form", and the professional supervision engineer shall conduct a review until it meets the requirements.

    5. For the engineering projects that need to be tested for functional tests (including stand-alone test and no-load test), the professional supervision engineer should supervise and urge the bridge to let the Wubao unit carry out the test in a timely manner, and conduct on-site supervision and inspection of important projects, and invite the construction unit and the design unit to participate if necessary. Professional supervision engineer should carefully review the test report.

    6. The professional supervision engineer should urge the contractor to do a good job in the protection of finished products and on-site cleaning.

    7. After a comprehensive inspection of the completion data and physical objects by the project supervision agency, the chief engineer shall sign the "Project Completion Inspection Form" and the completion report after passing the acceptance.

    1. What conditions should be met for the completion and acceptance of the project.

    The quality acceptance of the unit project shall comply with the following provisions.

    1. The quality of the division (subdivision) project contained in the unit (sub-unit) project shall be accepted.

    2. The quality control data should be complete.

    3. The testing data related to the safety and function of the sub-project contained in the unit (sub-unit) project should be complete.

    4. The results of spot checks on the main functional items shall comply with the provisions of the relevant professional quality acceptance specifications.

    5. The perception quality acceptance should meet the requirements.

    2. The relevant legal basis of the construction contract.

    Judicial Interpretation of Construction Project Contracts

    Article 14 If the parties have a dispute over the actual completion date of the construction project, it shall be handled separately according to the following circumstances:

    A) the construction project after the completion of acceptance, to the date of completion acceptance as the date of completion;

    2) If the contractor has submitted the completion acceptance report, and the contractor delays the acceptance, the date on which the contractor submits the acceptance report shall be the completion date;

    3) If the construction project has not been completed and accepted, and the employer uses it without authorization, the date of transfer of possession of the construction project shall be the date of completion.

  2. Anonymous users2024-02-05

    1) Preliminary work and implementation of the project;

    2) Design, construction, general contracting, construction supervision, equipment suppliers, quality supervision agencies and other units;

    3) the commencement and completion dates of each individual project;

    4) Completion of the workload and the formation of production capacity (detailed description of the reasons for the advance or delay of the construction period and the reasons for the deviation of the production capacity from the original plan, the completion acceptance report and the countermeasures taken to ensure the implementation of the original plan during construction).

    1. The basis for completion acceptance.

    The basis for completion acceptance can be summarized in the following nine points:

    1) Various documents approved by the higher authorities for the project;

    2) Feasibility study report, preliminary design documents and approval documents;

    3) Construction drawing design documents and design change negotiation records;

    4) Various standards promulgated by the state and current construction quality acceptance specifications;

    5) Project contract documents;

    6) Technical equipment manual;

    7) Other provisions on the completion and acceptance of the project;

    8) The project of new technology and complete sets of equipment introduced from abroad, as well as Sino-foreign joint venture construction projects, shall be accepted in accordance with the signed contract and the design documents provided by the importing country;

    9) For construction projects with loans from the World Bank and other international financial institutions, the Project Completion Report shall be prepared on time in accordance with the regulations of the World Bank.

    Second, the project completion acceptance procedures.

    At the acceptance meeting, the project construction supervision, design, survey and other parties of the project archives are placed for future reference, and the registration form of acceptance personnel is set up to do a good job in registration procedures.

    1. The construction unit shall organize the completion and acceptance of the project and hold the acceptance meeting (the construction unit shall make a brief speech before the meeting, introduce the project completion acceptance procedures and make a summary speech at the end of the meeting).

    2. The engineering survey, design, construction and supervision units shall report on the performance of the project contract and the implementation of laws, regulations and mandatory standards for the construction of Huicheng in all aspects of the project construction.

    3. The acceptance team reviews the project archives of the construction, survey, design, construction and supervision units.

    4. The acceptance team and the professional group (composed of survey, design, construction section loss, supervision unit, supervision station and other relevant experts) of the acceptance team and the professional group (composed of the construction unit to inspect the quality of the project on the spot.

    5. The professional group and the acceptance team express their opinions and make a comprehensive evaluation of the engineering survey, design, construction, equipment installation quality and various management links; The acceptance team forms the project completion acceptance opinion, fills in the "Construction Project Completion Acceptance Report" and signs it (with the official seal).

  3. Anonymous users2024-02-04

    Summary. Hello, dear, I am glad to answer for you: the overview of the completion and acceptance of the project, the project content is filled in as follows: (1) the preliminary work and implementation of the project; 2) Design, construction, general contracting, construction supervision, equipment suppliers, quality supervision agencies and other units; 3) the commencement and completion dates of each individual project; 4) Completion of the workload and the formation of production capacity (detailed description of the reasons for the advance or delay of the construction period and the reasons for the deviation of the production capacity from the original plan, the completion acceptance report and the countermeasures taken to ensure the implementation of the original plan during construction).

    Hello, dear, I am glad to answer for you: the overview of the completion and acceptance of the project, the project content is filled in as follows: (1) the preliminary work and implementation of the project; 2) Design, construction, general contracting, construction supervision, equipment suppliers, quality supervision agencies and other units; 3) the commencement and completion dates of each individual project; (4) Complete the lack of work and the production capacity formed (explain in detail the reasons for the advance or delay of the construction period and the reasons for the discrepancy between the production capacity and the original plan, the completion acceptance report and the countermeasures taken to ensure the implementation of the original plan for the closed friends during the construction).

    Completion acceptance refers to the process of obtaining qualified materials, data and vouchers for completion of the project after the completion of the construction project, by the investment department in conjunction with the construction, design, construction, equipment unit and engineering quality supervision and other departments to conduct a comprehensive inspection of whether the project meets the planning and design requirements and the quality of construction and equipment installation. Completion acceptance is an important part of the comprehensive assessment of the construction work, checking whether it meets the design requirements and project quality, and plays an important role in promoting the timely commissioning of construction projects (projects), giving full play to the investment effect, and summarizing construction experience. It should be pointed out that the completion acceptance is based on the phased acceptance, and the project that has completed the acceptance is generally not re-accepted when the house is completed and accepted.

  4. Anonymous users2024-02-03

    Fuqiao Project Name:

    Number: We have completed the completion of the project according to the requirements of the contract, and passed the self-inspection, please check and accept.

    1.The yin and yang corners are square, the closing is neat, the mouth is flush on the kicking angle, and the seams of the layout are straight 2The decorative line and color separation line are straight

    3.Door and window installation

    4.Doors, windows, and hardware are clean and pollution-free

    5.The porcelain brick is pasted smoothly and firmly

    6.Walls and floors are level

    7.Water and electrical circuits are unobstructed and fierce

    8.Paint color, whiskering, glossy, smooth

    9.Drainage inspection

    Note: The above is filled in according to the experimental results to pass or fail.

    Contractor: (Chapter).

    Project Manager:

    Date: YYYYYYYYYYYYYYYYYYYYY

    Acceptance Opinions:

    Decorator (Employer):

    Date: YYYYYYYYYYYYYYYYYYYYY

    Acceptance opinion: experience received, the project:

    1.Comply with) the requirements of China's current laws and regulations;

    2.Conform to the quality acceptance specifications of building decoration and decoration projects;

    3.Meets the requirements of the design documents;

    4.Meets the requirements of the construction contract.

    To sum up, the assessment is qualified and unqualified).

    Project Supervision Agency:

    Supervising Engineer:

    Date: YYYYYYYYYYYYYYYYYYYYY

    Party A: Party B (construction party):

    Project Name:

    Total project cost:

    Project content:

    Acceptance result: qualified, unqualified, partial repair).

    Self-inspection opinions of the construction unit:

    Project Manager:

    Acceptance conclusion of the construction unit:

    Note: This form is in duplicate, and Party A and Party B file one copy each.

    Signature of Party A's inspection personnel: Signature of Party B:

    Date: YYYYYYYYYYYYYYYYYYYYY

    Project Name:

    Construction unit:

    Construction unit:

    Supervision unit:

    Start Date:

    Completion Date:

    The main summary of the project:

    Acceptance Opinions:

    The person in charge of the construction unit: Date: YYYYYYYYYYYYYYYYYYYYYYYYYYYYYY

    The person in charge of the supervision unit: Date: YYYYYYYYYYYYYYYYYYYYYYYY

    Person in charge of the construction unit: Date: YYYYYYYYYYYYYYYYYYYYYYYYY

Related questions
8 answers2024-02-15

Summary. How to write the perception data of the completion and acceptance of the landscaping project. >>>More

11 answers2024-02-15

1. Introduction to the project.

2. Project cost. >>>More

7 answers2024-02-15

It is agreed that the subcontracting project of the general contractor shall be approved by the construction unit. The general contractor, Company A, subcontracts part of the non-main project to Subcontractor B with corresponding qualifications, and has obtained the consent of the construction unit. According to the Building Act. >>>More

14 answers2024-02-15

The acceptance of the foundation and foundation division project shall be organized by the chief engineer (or the project leader of the construction unit). The units participating in the acceptance include: construction units, construction general contractors, supervision units, design units, and survey units. >>>More

7 answers2024-02-15

Collect, archive and sort out various materials such as pre-licenses and contracts for each development project. Collect, archive and sort out all kinds of information such as drawings, supporting facilities, budget and final accounts of various development projects. Arrange the sending and receiving of drawings and materials for construction projects. >>>More