What is the meaning of three controls, two pipes and one coordination of construction projects

Updated on society 2024-03-08
7 answers
  1. Anonymous users2024-02-06

    Three controls, three pipes and one coordination is a kind of work of all parties in the construction of the main body of the construction The basic work of construction, real estate and construction supervision roughly includes the main contents of "three controls", "three managements" and "one coordination". The basic method of supervision is control, and the basic work is "three controls", "three managements" and "one coordination". The "three controls" in this paragraph are:

    Project progress control refers to the progress control of the project implementation stage (including the stages of design preparation, design, construction, and pre-construction preparation). The purpose of the control is to ensure that the project delivery time target is achieved through the use of control measures.

    Engineering quality control supervision engineer organization to participate in the construction of the contractor, according to the contract standards for construction, and the formation of quality factors for testing, verification, the difference of adjustment, corrective measures of the supervision and management process. Project investment (cost) control is cost control for the construction unit, and for the construction unit and the supervision unit, it is cost control. It does not mean that the more the investment is saved, the better, but that it is reasonably controlled within the scope of the investment in the project.

    The "two pipes" are: Contract management The contract of construction project supervision runs through the whole process of contract signing, performance, change or termination. Occupational health and safety and environmental management revolves around dynamic target control, and safety is the basis of the most important target control in the construction of fixed assets.

    Information management Construction project management is a complex and modern management activity, which relies on a large amount of information and the management of a large amount of information, and the application of electronic computers to assist. "One coordination" refers to the comprehensive organization and coordination (the scope of coordination is divided into internal coordination and external coordination).

    Since the establishment of the "construction supervision system" in 1988 to today, supervision has gone through 24 years in China. As an industry has gradually moved from naivety to maturity, how to develop the next step is a major event in front of each supervision enterprise. The Ministry of Construction's "Guiding Opinions on Cultivating and Developing Engineering General Contracting and Engineering Project Management Enterprises" was issued in a timely manner, pointing out the direction for the development of the supervision industry.

    The "Guiding Opinions" encourage enterprises with engineering survey, design, construction, supervision and qualifications to enrich project management professionals through the establishment of organizational structures and project management systems that are compatible with the engineering project management industry, and carry out corresponding engineering project management business within the scope of the project permitted by their qualification level in accordance with the relevant qualification management regulations. As mentioned earlier, the supervision enterprise is originally designed for project management; Its benefits are directly related to the target system of the construction project, so it is essentially the same as the interests of the project owner; The resources it has are suitable for knowledge-intensive rather than capital-intensive investment, and all these decisions are the most suitable for the supervision company to carry out project management. Engineering supervision enterprises should strengthen their confidence, seize the opportunity, take advantage of the trend on the basis of the original construction supervision, extend to both ends, and gradually transition from construction supervision to all-round supervision of the whole process, so as to achieve project management in the real sense.

    At the same time, coordination is also an important part of daily work in construction projects and real estate development activities.

  2. Anonymous users2024-02-05

    Legal analysis: three control, three management and one coordination refers to the basic work of construction, real estate and construction supervision of all parties involved in the construction of the main body of the construction. The "three controls" include project progress control, quality control, and project cost control.

    The "three pipes" include contract management, occupational health and safety and environmental management, and information (registration and registration of employees entering the site) management. "One coordination" refers to the comprehensive organization of coordination (the scope of coordination is divided into internal coordination and external coordination).

    Legal basis: Article 19 of the "Regulations on the Management of Construction Sites" The construction unit shall implement the requirements of civilized construction, implement modern management methods, scientifically organize construction, and do a good job in the management of the construction site.

  3. Anonymous users2024-02-04

    Legal analysis: three controls, three management and one coordination is the work of all parties involved in the construction of the main body of the construction, and the basic work of construction, real estate and construction supervision roughly includes the main contents of "three controls", "two managements" and "one coordination". The basic method of supervision is control, and the basic work is "three controls", "two managements" and "one coordination".

    The "three controls" include project progress control, quality control, and project cost control.

    Legal basis: Law of the People's Republic of China on the Administration of Work Safety

    Article 5 The main person in charge of the production and business operation entity shall be fully responsible for the safety production work of the unit.

    Article 18 The main person in charge of the production and business operation entity shall have the following responsibilities for the safety production work of the unit:

    1) Establish and improve the responsibility system for production safety in the unit;

    2) Organize the formulation of the unit's safety production rules and regulations and operating procedures;

    3) Organize the formulation and implementation of the unit's safety production education and training plan;

    4) Ensure the effective implementation of the unit's investment in production safety;

    5) Supervise and inspect the safety production work of the unit, and eliminate the hidden dangers of production safety accidents in a timely manner;

    6) Organize the formulation and implementation of the emergency rescue plan for production safety accidents of the unit;

    7) Report production safety accidents in a timely and truthful manner.

  4. Anonymous users2024-02-03

    The four controls refer to schedule control, quality control, cost control, and change control. The three pipes refer to contract management, security management, and data management. 1. Coordination refers to the coordination of the relationship between Party A, the general contractor and the equipment and materials.

    Information system engineering supervision refers to the information system engineering supervision unit established in accordance with the law and with corresponding qualifications, entrusted by the owner unit (construction unit), in accordance with the relevant national laws and regulations, technical standards and information system engineering supervision contract, the implementation of supervision and management of information system engineering projects.

    What are the four controls?

    Quality control: At all stages of the supervision work, it is necessary to strictly follow the requirements of the construction contract, review the key processes and phased results, check whether it meets the predetermined quality requirements, and the whole supervision work should emphasize the pre-control, in-process supervision and post-evaluation of the project quality.

    Progress control: During the implementation of the project, the supervising engineer follows up the progress of the project in strict accordance with the requirements of the bidding documents, contracts and project schedules to ensure that the overall construction is carried out in an orderly manner.

    Cost control: The investment in information system engineering is basically composed of investment in the purchase of software and hardware equipment, investment in supporting projects, project integration costs and other investment in engineering construction, mainly including investment control in the design stage and investment control in the implementation stage.

    Change control: Manage changes to ensure that changes are carried out in an orderly manner. For software development projects, there are many changes that occur, so change control is particularly important.

    What are the three tubes?

    Contract management: effectively resolve the contract disputes between the owner and the contractor in the process of project construction, and protect the rights and interests of all parties involved in the project.

    Information management: scientifically record the engineering construction process, ensure the integrity and timeliness of the engineering documents, and provide document guarantee for the inspection of the engineering construction process and the later maintenance of the system.

    Safety management: Improving the safety production management system, establishing and improving the safety production management system, safety production management institutions and safety production responsibility system is an important part of safety production management, and it is also the organizational guarantee for achieving safety production target management.

    1. What is coordination?

  5. Anonymous users2024-02-02

    Three controls, two management and one coordination refer to: three controls, namely quality control, progress control and investment control; The two management are contract management and information management; One coordination is to do the coordination of all parties and the surrounding environment.

    Because there are many safety accidents in recent years, the state has increased the management of building safety, and the supervision of the corresponding lack of foundation should also strengthen the management of the safety of the construction site and bear the corresponding responsibilities, such as the supervision rules must have special safety supervision measures and methods.

    The three pipes have become contract management, information management and security management. Construction project management is the whole process and comprehensive management of construction projects by construction enterprises using systematic views, theories and methods.

    Features:

    The content of construction project management changes in phases in an orderly process that takes place over a long period of time. Each project is carried out according to the construction procedure, according to the construction procedure.

    Managers need to make designs, sign contracts, propose measures, carry out targeted dynamic management, and optimize the combination of resources to improve construction efficiency and construction benefits according to the changes in construction content brought about by the passage of construction project management time.

  6. Anonymous users2024-02-01

    The three controls, three controls and one coordination of construction refer to investment control, schedule control (progress control in the project implementation stage), quality control, contract management, information management, safety management, and organization and coordination (the scope of coordination is divided into internal coordination and external coordination).

    Construction refers to the assets made of artificial construction, which belong to the category of fixed assets, including houses and structures. Housing refers to engineering buildings for people to live, work, study, produce, operate, entertain, store goods and carry out other social activities, and buildings are different from structures, and structures refer to engineering buildings other than houses, such as fences, roads, dams, wells, tunnels, water towers, bridges and chimneys.

  7. Anonymous users2024-01-31

    Three control, three management and one coordination is a kind of engineering construction in the main body of the construction of the main party of the work, construction, real estate and construction supervision of the basic work, roughly including "three control", "two management", "one coordination" main content. The basic method of supervision is control, and the basic work is "three controls", "two managements" and "one coordination". The "three controls" include project progress control, quality control, and project cost control.

    Law of the People's Republic of China on the Management of Sources and Numbers of Work Safety

    Article 5 The main person in charge of the production and business operation entity shall be fully responsible for the safety production work of the unit.

    Article 18 The main person in charge of the production and business operation entity shall have the following responsibilities for the safety production work of the unit:

    1) Establish and improve the responsibility system for production safety in the unit;

    2) Organize the formulation of the unit's safety production rules and regulations and operating procedures;

    3) Organize the formulation and implementation of the unit's hail socks safety production education and training plan;

    4) Ensure the effective implementation of the unit's investment in production safety;

    5) Supervise and inspect the safety production work of the unit, and eliminate the hidden dangers of production safety accidents in a timely manner;

    6) Organize the formulation and implementation of the emergency rescue plan for production safety accidents of the unit;

    7) Report production safety accidents in a timely and truthful manner.

Related questions
8 answers2024-03-08

The project supervision is well managed, and it is over every day to find a little fault, and there is a sign after completing the progress, how simple it is. The salary is a little lower, but there is a lot of oil and water, and you have just graduated. After two years, you'll know that it's not a problem to get more than 100,000 a year. >>>More

6 answers2024-03-08

Do the math how much it will cost you to renovate your home >>>More

5 answers2024-03-08

1) Daben, engaged in professional and technical work for more than one year. >>>More

10 answers2024-03-08

According to the current division of majors, architecture, civil engineering, and water conservancy and hydropower engineering (that is, water conservancy and hydropower construction) are three majors, each of which is independent. If you want to talk about the relationship between them, it can be said that they are all civil engineering. >>>More

3 answers2024-03-08

The Pyramid of Khufu, Egypt The Pyramid of Khufu was built during the reign of Khufu, the second pharaoh of the Fourth Dynasty of Egypt (c. 2670 BC), and is believed to have been built by Khufu as a mausoleum for himself. In ancient Egypt, every pharaoh began to build a mausoleum for himself from the day he ascended the throne, in order to transcend himself as a god after death. The 4 inclined planes of the Great Pyramid of Khufu are facing the east, south, west and north squares, the error does not exceed 3 points of the arc, the bottom edge is originally 230 meters long, due to the limestone falling off the outer layer of the tower, the bottom edge is now shortened to 227 meters, and the inclination angle is 51 degrees 52 minutes. >>>More