What is the difference between a estimator and a budgeter?

Updated on workplace 2024-03-17
5 answers
  1. Anonymous users2024-02-06

    1) The two levels are different: the cost engineer is intermediate, and the budget clerk is junior.

    2) The main examination department is different: the cost engineer is the Ministry of Personnel and the Ministry of Construction, and the budget officer is the Provincial Department of Construction.

    3) The scope of use is different: the cost engineer is common throughout the country, and the budget officer can only be used within the province.

  2. Anonymous users2024-02-05

    The budget clerk is the cost clerk, but the qualification certificate. The cost engineer is the national registered cost engineer college graduation 5 years after the qualification certificate,,, level is relatively high...

  3. Anonymous users2024-02-04

    Yes, it's big, the budget clerk also has a certificate, and the province generally arranges exams, and it's very simple to pass 80%. The cost engineer is a unified examination arranged by the Ministry of Personnel and the Ministry of Construction, and the qualification certificate is issued after the examination, and the registration certificate is issued after registration. The budget clerk's card is worth 500 yuan. 30,000 yuan a year for cost engineers!

  4. Anonymous users2024-02-03

    Cost engineer refers to the engineering economic professionals who are qualified by the state and licensed to practice after registration, and are specifically designated, entrusted or hired by a certain department or a certain unit, and are responsible for and assist them in valuing, pricing and managing the project cost, so as to safeguard their legitimate rights and interests.

    Budgeter refers to the detailed or rough statistics on the most basic labor, materials, machinery and other expenses completed by a project, including taxes, profits, etc. Budgeters are also commonly referred to as building budgeters or civil budgeters.

  5. Anonymous users2024-02-02

    1. The nature of the work is different.

    The budget clerk is to budget the investment of the project before the construction of the project, and the cost clerk is to the project after the completion of the project.

    The actual costs incurred are carried out in the cost consulting (audit) work. Cost clerks can also work on budgeting, but the budget is known.

    Employees are not allowed to engage in cost consulting work.

    2. The work unit is different.

    The budget clerk generally works in the construction enterprise, and the cost clerk generally works in the cost consulting enterprise.

    3. The certificates are different.

    The budget officer is a certificate printed by the Hubei Provincial Department of Construction and issued by the Hubei Provincial Department of Construction. Cost Engineer is a cost consultant in China.

    The certificate of the association (China Price Association) is issued by the Hubei Provincial Cost Management Station.

    The budget clerk is a certificate of qualification for the training of key positions in the construction industry in Hubei Province, and it can only be issued after participating in the training examination.

    Proof. The cost officer is the national cost officer qualification certificate, and there is no requirement for training.

    4. The application conditions are different.

    Basically, there are no restrictions on the application conditions for budget officers, and no relevant work experience is required. There are strict application conditions for cost personnel.

    system, non-cost majors must have more than one year of cost-related work.

    If you have any other questions, please feel free to contact us.

Related questions
13 answers2024-03-17

So many questions·· If you still want to learn all at once about civil engineering, garden installation, steel structure and water conservancy!! >>>More

14 answers2024-03-17

"Flower arrangement" refers to the cutting of plant branches, leaves, flowers, fruits as materials, after a certain technology (pruning, pruning, bending, etc.) and art (conception, modeling, coloring, etc.) processing, reconfigured into a delicate and beautiful, full of poetry, can reproduce the beauty of nature and the beauty of life of the floral artwork, so it is called flower arrangement art. >>>More

4 answers2024-03-17

Most of the company's products and interactions are done by the same person. I look at it this way: the product person focuses on meeting the user's needs (what the product can give the user) and the product goals (the company's business goals), and the functional scope (what are the main functions of the product and which are secondary). >>>More

15 answers2024-03-17

What's worth buying is the value of the help you buy.

8 answers2024-03-17

The meanings of these two words are very similar and sometimes interchangeable, but the order of the words is different. >>>More