From start to finish, what is the right home improvement process and focus?

Updated on home 2024-03-22
18 answers
  1. Anonymous users2024-02-07

    After buying a house, many people have to start renovating it soon so that they can move in as soon as possible. The basic process or stages of renovation is relatively complex, and the main body demolition is the signal for the start of decoration, and the project includes removing walls, building walls, shoveling walls, removing heating, replacing plastic windows, etc. There is no way back for hydroelectric power decoration!

    Wrong installation, no chance to install again! Therefore, the water and electricity renovation must be careful, and before starting, it is necessary to confirm all switches, socket locations, bathtubs in the waterways, washing machines, etc.! In the renovation of hydroelectric power, the cabinet designer should come to the door to make the first measurement of the cabinet, and help determine the renovation plan of electricity and waterway on site.

    There should also be a power socket under the sink, and the small kitchen treasure should be powered on in the future. Air conditioning holes and power supply are best installed on this wall next to the bed. Do not install on the wall next to the bed.

    The air conditioner was dry against people. The decoration should be made in advance with an air-conditioning hole.

    The kitchen and bathroom are two of the wettest spaces in the new house! Don't use wood for structural things! Renovation is a long-term thing, and after ten years make sure the house is still strong.

    After waterproofing, the next step is tiling. Please note that in addition to the normal packaging process, how to paste more beautiful tiles must be prepared in advance for floor leakage! There are also many distinctions between ground leaks.

    The bathroom has a dedicated toilet, washing machine, shower, and the kitchen has a dedicated floor leak. But no matter what type of leak it is, it must be odor-proof! When buying bricks, be sure to prepare a few more bricks!

    5% of the total amount is about 10%, <>

    There's not much to say when painting the walls. Flat polishing rollers, if the walls are ready to paint color, be sure to pay attention to the paint! The paint is applied at least twice, so the color of the paint should be lighter than the color card!

    Otherwise, apply a light paint to create a dark effect! After painting the walls, the wallpaper is first painted! When the nitro paint is dry, you can find a master to paste the wallpaper, and within 48 hours after the wallpaper, do not open the window to ventilate, so that it will slowly blur.

    If you don't want to put wallpaper, skip this step. Install the water heater and bathtub first, and cover the roof after installation, so that the water heater can be better promulgated. That is, it can be connected more beautifully.

    The ceiling of the kitchen and bathroom should be buckled with aluminum buckles, and the aluminum buckles can be removed after installation, and now the integrated ceiling uses modular splicing. Split button module, heating module, lighting module, ventilation module. Simple installation, flexible layout, easy maintenance, is the mainstream of bathroom and kitchen ceilings.

    Before installing the cabinets, install the hood, stove and sink at the same time! These kitchen utensils should be coordinated with each other and <>

    There are still many styles of interior decoration, and the more popular ones are modern and simple style, modern and fashionable. If you want to be a little more luxurious, you can choose European or American style. Chinese style is unique to our country, so the combination of traditional Chinese culture and modern elements in home decoration is in line with the aesthetics of modern people, can inherit traditional Chinese art, and gives people a sense of simplicity and style.

  2. Anonymous users2024-02-06

    Find a designer to determine the size and location of various appliances.

    Find the construction party and inspect the construction site.

    Measure the room, determine the drawings, **, water and electricity estimates, etc.

    Buy all kinds of materials, air conditioning, heating, cabinets, etc.

    Acceptance of hydropower.

  3. Anonymous users2024-02-05

    First of all, you should install water and electricity lines, and secondly, you should choose to lay floor tiles or some wooden floors, and then carry out the overall hard decoration, and then buy the corresponding furniture. The key point is that the water and electricity lines must be laid very appropriately, so that it is very comfortable and convenient to live.

  4. Anonymous users2024-02-04

    The correct home decoration process must be the first water and electricity entry, followed by waterproofing, tiling, carpentry, putty, painting, each of these steps is very important, if not done well, it will be very troublesome later.

  5. Anonymous users2024-02-03

    When buying a house, if there isRough houseThere are options to choose from, and most people will choose a rough house. The ** of the rough house is relatively cheap, and there is no sign of outsiders living in it. They can decorate it to their liking.

    After the delivery of the new home, we will start the renovation. Soon we will be able to move into the new house. For those who are in a hurry to move in, it is very necessary to understand the construction period of the renovation.

    Renovation is a process that needs to be worried about by the owner at any time. Before the renovation construction, the owner should ask the foreman to show the decoration construction schedule.

    A piece of decorationFloor plan, is a commitment to the owner. In the future, if there is a delay in the construction period, the owner can protect its legitimate rights and interests according to the schedule. The work in the early stage of decoration is mainly decoration design.

    Choose from a renovation company.

    It takes 10-15 days to determine the design scheme. The main thing is to choose the main materials for the decoration, especially tiles and cabinets. Professional cabinet designers need to design the kitchen according to the actual situation, and custom cabinets also take a certain amount of time, generally 20-35 days.

    Ceramic tiles are the first to be used after construction.

    ManyDecoration styleIt is also decided by people of different ages. Generally speaking, young people who live in the wedding room prefer the simple Beimo Mengou style.

    Middle-class people renovated their homes in a new Chinese or American style with economically improved houses.

    Modern light luxury style and so on, I suggest that you carefully choose a reputable decoration company before decorating, take the first step, the following is more smooth. The schedule can also be used as a reference for the owner's regular inspection and acceptance of the project.

    In the whole decoration process, the most time-consuming thing is to scrape the wall, because there are many processes to scrape the wall, and the wall needs to be dried once and then dried again, so the time is the longest. As long as it is decorated, it must be filed with the property to avoid trouble. If it's a new home, the property will charge a garbage collection fee, so you save a lot of things.

    There will be more changes in the kitchen, so before decorating the water and electricity, you can determine the location of the water and electricity with the renovation company, especially pay attention to the location of some embedded appliances. It's not easy to determine the location and make adjustments later. Hydropower transformation is the top priority, whether it is a bright line or a dark line, it is very important.

    If we ignore it at this time, future problems will be difficult to maintain. It costs not only a lot of money, but also a lot of materials.

  6. Anonymous users2024-02-02

    In the process of decoration, it takes the longest time to make furniture, because it takes a month from the measuring stick of the designer to the renderings to the production and installation at the earliest, which is the longest step in the repair of Li Mao.

  7. Anonymous users2024-02-01

    If the furniture is made on site, the carpentry step will take longer, about 10-20 days. If it's custom furniture, it's faster, and you don't need to fight for so long. In addition, the longer construction period is the painter's silver branch stage, which generally takes seven to fourteen days.

  8. Anonymous users2024-01-31

    In the whole process of decoration, the time to scrape putty is the longest, because generally this needs to be scraped three times, and it is necessary to wait for the second time after getting the rent Huiban, so the blue sky of this time delay is more disadvantageous.

  9. Anonymous users2024-01-30

    In the decoration process, in addition to the impact of special circumstances, the general paint construction stage takes a long time, about 20 days, because the construction of the paint is more complicated, and each link of construction needs to wait for the previous coating to dry completely, otherwise the follow-up coating is prone to quality problems, such as drumming, pure and pure letter mold, cracking, etc., in the case of serious problems, and even all need to be reworked, so it is very time-consuming.

    The paint application process is as follows:

    1. Carry out the base treatment first, clean the construction surface, ensure smoothness and drying, and avoid affecting the quality of the paint layer, and then polish the surface with sandpaper to ensure smoothness, and also enhance the adhesion of the next coating.

    2. After the base is treated, you can start to scrape the putty, the main purpose is to ensure the flatness of the wall, so the specific number of layers should be subject to the site, it is generally recommended to have 2 to 3 layers, and each layer needs to wait for the coating to dry, and then the pants are sanded with sandpaper before the next layer of construction can begin.

    3. After scraping putty, you can start to paint it, there are two situations of paint, first you need to apply 2 layers of primer, the requirements are the same as the putty, you need to wait for the previous process to dry before you can continue, after the primer is over, you can start to paint paint, it is generally recommended to have 2 to 3 layers, because the paint film should be uniform, and not too thick, some colors are darker, more than three layers may be required, and the specific number of layers should be subject to the actual situation.

  10. Anonymous users2024-01-29

    The two complement each other, and the middle of the process is perfected to highlight the focus of the entire decoration style and make people get a pleasing feeling.

  11. Anonymous users2024-01-28

    The specific process, first of all, is to demolish and renovate the wall, transform the layout of the home, and then change the water and electricity, lay the bricks, make the cabinet, scrape the putty, and then buy furniture for soft decoration. I think the key is to do a good job of waterproofing the bathroom, and be sure to plan the layout of the kitchen, so that life will be more assured in the future.

  12. Anonymous users2024-01-27

    Pre-design, main body demolition and modification, water and electricity transformation, carpentry tiling, wall painting, kitchen and bathroom ceiling, cabinet installation, wooden door installation, floor installation, paving wallpaper, radiator installation, switch and socket installation, lighting installation, hardware and sanitary ware installation, curtain rod installation, pioneer cleaning, furniture entry, home appliance installation, home accessories.

  13. Anonymous users2024-01-26

    After starting, first determine the design plan of you and the designer, and then clarify the water and electricity according to your and the designer's plan, the electrician will locate and draw the line, and then continue to dismantle hard, and then carry out the work, the electrician and the plumber can also work together, then the floor heating project, and then the backfill, about 2-3 days, this depends on the site situation, and the floor heating can be mastered. Judging the dust.

    <> when the toilet begins to do waterproofing, waterproofing usually has to be done 2 times, once is flexible waterproofing, 1-2 days, under normal circumstances, the strength of dry cement comes up, the toilet should be drained, that is, the toilet waterproofing project, usually through the experiment for at least 24 hours, what problems do you have to test whether the toilet is waterproof, and then the work of the bricklayer, after the bricklaying, put 2-3 days for carpentry, carpentry, is Beibei's work, after Beibei is all kinds of work, such as cabinets, doors, etc. , and then there are all kinds of installation, and then it is sanitary cleaning, and after the cleaning is completed, it is the owner's acceptance, and after the acceptance, the project is over.

    The small repair materials here include cement, mortar, proposition materials, etc., digging Qi Zen Generally speaking, the decoration company will provide the brand selection of materials, if the decoration company can ensure the after-sales quality, and the first is not higher than the market price, the owner can choose to be purchased by the decoration company, even if it can not save money, it can also save a lot of time, and it can also ensure the quality. In this era of light decoration and heavy decoration, soft decoration is extremely important, from the positioning of the color to the placement of furniture, as small as a vase, as large as the sofa, and even the matching of lighting, all need fine design. Soft decoration accessories must not be careless, related to the quality of life in the later stage, can have a special designer for the overall matching, to ensure the perfect presentation of details.

    Do a detailed interpretation of the problem, I hope it will help you, if you have any questions, you can leave me a message in the comment area, you can comment with me more, if there is something wrong, you can also interact with me more, if you like the author, you can also follow me, your like is the biggest help to me, thank you.

  14. Anonymous users2024-01-25

    The first is to change the corresponding hydropower, after the laying of the water and electricity pipelines, the floor is laid first, the floor is laid before the simple noise, and the corresponding waterproof work is done. The key is to do a good job in pipeline laying, waterproofing, waterproofing, electricity, and fire prevention in bathrooms and kitchens.

  15. Anonymous users2024-01-24

    And their own contact designer, the style of the room design, and the designer to indicate your circuit problems and waterway problems of the route, after the water and electricity pipelines are laid, the floor is laid, before the change is carefully paved to lay the floor heating, do the corresponding waterproof work, in the design of the design is to avoid unnecessary trouble, but also according to the general score and lighting to set the corresponding grid.

  16. Anonymous users2024-01-23

    The process is to change the water and electricity, the beams are rotten to do waterproofing, do the rubber to close the leakage of warmth, change the anti-theft door, pave the floor tiles, the ceiling, install doors and windows, do carpentry, buy furniture, the focus is to pave the floor tiles, when paving the floor tiles, you must put the cement and sand in proportion, and the floor tiles must be soaked in water before the ground or paved.

  17. Anonymous users2024-01-22

    The correct decoration process is to first lay the floor tiles, then replace the door, then replace the water circuit, then deal with the wall in front of the town, and finally install the wardrobe, and finally carry out the secondary treatment of the wall of the selling wheel.

  18. Anonymous users2024-01-21

    1. First of all, we must find a special designer to design before decorating, and clarify how many materials to use in the home and how many sizes of furniture need to be placed in each room.

    2. Then, we have to ask the construction team to carry out the overall transformation according to the drawings, such as dismantling the wall and shoveling the wall skin, removing the floor heating, or replacing the windows.

    3. Then, we have to transform the waterway and circuit, in the process of transforming water and electricity, we must determine the location of the power supply such as the cabinet, the lamp, the air conditioner, etc., and determine these positions, so that we can install the switch, and the location of the bath and washing machine switch air conditioner can be installed in the appropriate position.

    4. After the switch is installed, we have to paint the wall, the wall painting includes painting the wall, pasting the wallpaper, at this time the paint will come on, after painting, we have to wait until it is completely dry before the wallpaper.

Related questions
16 answers2024-03-22

At that time, I was preparing to go to graduate school abroad, and I had a vocabulary of about 20,000 (15,000 can write, spell, and use), so I prepared for a week of listening, thinking about how to deal with reading, and then when I arrived at the test room, I thought a little too much, I originally thought that TOEFL should be very difficult, and it was very easy to do. The first time I took the test 113, the second time, the third time I didn't take it too seriously, 109 and 103. The last time I did the mock questions for three days, to be honest, I didn't feel useless, and I didn't take the test after taking the 117 test. >>>More

8 answers2024-03-22

Yangjiagou Revolutionary Memorial Hall Shaanxi Provincial Patriotism Education Base. >>>More

18 answers2024-03-22

Bus No. 364 [Intermediate] Main Urban Area Guanzhong Bus Group [Air Conditioning] Bus 6:20 20:00 Nanping (Bus Hub Station) - Nanping West Road (Wanshou Road Intersection) - Qilong Villa - Optical Circuit [Mingjia Intersection] - Optical Circuit [Armament Department] - Dongqiaotou (Zhaojiaba) - Xie Jiawan - Grand Mansion - Loncin - Chenjiaping Electromechanical Market (Exhibition Center) - Shiqiaopu Brewery (out of the city) - Shixin Road [Trading City] - Clock Factory (Ceramic City) - Bashan - Bashan Vehicle Management Office - Orchid Community (16 stops) No. 819[Intermediate] main urban bus group [air-conditioned] car 6: >>>More

9 answers2024-03-22

The first thing to check is what the minimum IELTS score required by the school you are applying for. >>>More