China Water Resources and Hydropower Engineering Bureau ranking, which China Water Resources and Hyd

Updated on educate 2024-03-04
21 answers
  1. Anonymous users2024-02-06

    Hello, I graduated in 2012 into the 14th Bureau of Hydropower, currently in its secondary unit under the project department as a comprehensive officer, our project department salary by me, at the same time I can also see the salary of all our secondary units, so you want to know the treatment of the words I am most qualified to say: the 14th Bureau has a salary standard, the bureau directly under the unit salary standard is high, the secondary unit will be a grade lower, at the same time the undergraduate will be higher than the junior college a starting point, but in general is not high, and the 14th bureau deducted the housing provident fund is relatively high, Therefore, as a freshman, it is generally about 2000 (2013 standard), if you graduate from a junior college, you can get less than 2000, and if you are an undergraduate, it will be about 2300. What is 2,000 yuan enough to do in this era?

    But if you can go abroad, the annual salary will not be less than 100,000, and going abroad in a second-level unit will be lower than going abroad directly in an overseas business department, but if you want to go abroad in an overseas business department, unless your major is a foreign language or other majors required by overseas business departments! However, I personally think that going abroad is not worth it, one of them: if it is a one-year or two-year project, it is fine, if it is a big project in 10 years, you will have nothing but the remaining 1 million after ten years, and even if you have no savings in the country for ten years, you can establish a lot of useful relationships in life; Second:

    Besides, the engineering thinking abroad is completely different from that in China, and you will not be able to do domestic engineering when you return to China after ten years; Third: The overseas projects of the 14th Bureau are basically power station projects, and power stations mean that those places are wilderness, and doing projects in those places is definitely exchanging lives for money. Secondly, if you are in a project with good benefits, the project can take out some money to pay employee benefits, but once it is a loss-making project, it is normal for the salary to be in arrears for half a year, you don't want to have other benefits, the general situation is 4 days off per month, and there are about 20 days of paid home leave every year after the regularization, and there is no overtime pay at ordinary times, and there is overtime pay on national statutory holidays!

    My personal suggestion: if you can not do the project as much as possible, now the hydropower industry does not want to be treated like before, the project is basically the same, you can mix well for another 10 years to mix a project manager, but what about the project manager, you are not yet abandoning your wife and children to run away from home, how sure do you think you can ensure the stability of your backyard, once an employee jokingly said to another colleague: "You don't want to be a wife", he said

    I don't soak other people's wives, people want to soak my wife" Even if your backyard is stable and you lose your children's education, then who are you running around for in this life? Do you think it's worth the money? Don't say come and learn something first, why waste this precious time if you're not going to do it for a long time!

    It's hard to get back to the rear! But if you decide to do construction, or you don't have a better choice, then the 14th Hydropower Bureau is still in the forefront of the entire hydropower industry, and it is also among the best in similar industries in Yunnan, and it is not bad in the entire construction industry! I hope you think about it!

  2. Anonymous users2024-02-05

    The fourth, seventh, eighth, and fourteenth bureaus are very good, and they are more distinctive in the industry. In addition, the Gezhouba Engineering Bureau is also not bad.

  3. Anonymous users2024-02-04

    The best right now is 4 innings, followed by 7, 8 and 12 innings.

  4. Anonymous users2024-02-03

    There doesn't seem to be a specific ranking for this, just listen to what they said, generally seven games and eight games are the best, followed by 14 rounds and four games are better, and the eastern games are not very well understood.

  5. Anonymous users2024-02-02

    The Fourth Engineering Bureau of China Water Resources and Hydropower is good.

    In the long-term practice of water conservancy and hydropower project construction, China Hydropower Fourth Bureau has vigorously promoted scientific and technological progress, implemented the strategy of "rejuvenating the bureau through science and technology", focused on improving the level of enterprise technology and equipment, extensively carried out the research, development and application of new technologies, new processes and new materials, and made many breakthroughs in various fields, especially national research projects, and successively won more than 80 scientific and technological achievement awards at or above the national, ministerial and provincial levels.

    On May 25, 2021, it was awarded the title of "Collective that has made important contributions to the relief of urban workers in difficulty" by the All-China Federation of Trade Unions.

    In September 2021, he was awarded the nomination award of the 4th China Quality Award.

    In the past 50 years, the company has accumulated a heavy historical and cultural connotation, and the spirit of "unremitting self-improvement and courage to surpass", the quality of "five special" plateau hydropower people, and the sense of social responsibility of "willing to dedicate and have the courage to take responsibility" have become a strong spiritual driving force for the people of the four bureaus to continuously create brilliance.

    Tianxingjian, a gentleman strives for self-improvement. At present, the Fourth Bureau of China Hydropower is building a first-class enterprise in the field of hydropower and non-hydropower construction in accordance with the principle of "leading in the industry, first-class management, obvious brand influence, spanning the domestic and international construction markets, and enjoying a reputation in the field of hydropower and non-hydropower construction". "Development strategy, the boat breaks the waves, and strives to move forward, we are willing to work together with friends from all walks of life to create a brilliant and beautiful tomorrow.

  6. Anonymous users2024-02-01

    Won the list of the top 20 national water conservancy and hydropower construction enterprises in the first time

    The Seventh Engineering Bureau of National Water Resources and Hydropower.

    The 13th Engineering Bureau of National Water Resources and Hydropower.

    Railway Construction 18th Bureau Group ****.

    State Water Conservancy and Hydropower Minjiang Engineering Bureau.

    The 12th Engineering Bureau of State Water Resources and Hydropower.

    The 15th Engineering Bureau of the State Hydropower Construction Group****.

    The 10th Engineering Bureau of National Water Resources and Hydropower.

    Guangxi Zhuang Autonomous Region Hydropower Engineering Bureau.

    The 14th Engineering Bureau of National Water Resources and Hydropower.

    The Fourth Engineering Bureau of National Water Resources and Hydropower.

    National Water Conservancy and Hydropower Engineering Bureau.

    The Fifth Engineering Bureau of State Water Conservancy and Hydropower.

    Railway Construction 16th Bureau Group ****.

    The Sixth Engineering Bureau of National Water Resources and Hydropower.

    The Eighth Engineering Bureau of National Water Resources and Hydropower.

    The Ninth Engineering Bureau of National Water Resources and Hydropower.

    The Second Engineering Bureau of Water Resources and Hydropower.

    The Third Engineering Bureau of National Water Resources and Hydropower.

    Guogezhouba Group Company.

    State Water Resources and Hydropower Infrastructure Bureau.

  7. Anonymous users2024-01-31

    The 14 bureaus of the water and electricity bureau are the best, which is the overall statement, and in fact, you are assigned to each project department. The benefits are not the same. The salary is also different, but the water is not good overall, and it is not as good as China Construction.

    It's even worse than CCCC. And the middle water is very bitter, deep in the mountains and old forests. These words are really not just words.

  8. Anonymous users2024-01-30

    The ranking of companies in the water conservancy and hydropower industry, except for a few subsidiaries that are not subsidiaries of China Water Conservancy and Hydropower, the rest are the rankings of China Water Electronics Corporation.

    1. The Seventh Engineering Bureau of China Water Resources and Hydropower, Chengdu.

    2. The 13th Engineering Bureau of China Water Resources and Hydropower, Dezhou.

    3. China Railway Construction 18th Bureau Group ****).

    4. China Water Resources and Hydropower Minjiang Engineering Bureau, Sanmenxia.

    5. The 12th Engineering Bureau of China Water Resources and Hydropower, Hangzhou.

    6. The 15th Engineering Bureau of China Hydropower Construction Group**** Xi'an 7 The 10th Engineering Bureau of China Water Resources and Hydropower Chengdu.

    8. Guangxi Zhuang Autonomous Region Hydropower Engineering Bureau).

    9. The 14th Engineering Bureau of China Water Resources and Hydropower, Kunming.

    10. The Fourth Engineering Bureau of China Water Resources and Hydropower, Xining.

    11. China Water Resources and Hydropower First Engineering Bureau, Changchun.

    12. The Fifth Engineering Bureau of China Water Resources and Hydropower, Chengdu.

    13 China Railway Construction 16th Bureau Group **** Fuzhou).

    14. Dandong, China Water Resources and Hydropower Sixth Engineering Bureau.

    15. The Eighth Engineering Bureau of China Water Resources and Hydropower, Changsha.

    16. The Ninth Engineering Bureau of China Water Resources and Hydropower, Guiyang.

    17. China Water Resources and Hydropower Second Engineering Bureau, Beijing.

    18. The Third Engineering Bureau of China Water Resources and Hydropower, Xi'an.

    19. China Gezhouba Group Corporation).

    20China Water Resources and Hydropower Infrastructure Bureau.

  9. Anonymous users2024-01-29

    I don't know if you are a major in water conservancy and hydropower, I suggest you go to the construction unit, not to the water general. I'll introduce you to the name of the construction unit. China Datang, China Huadian, Huaneng, Huadian, Guodian, you can look up their recruitment information, you can apply for their engineering cost professional job recruitment information.

  10. Anonymous users2024-01-28

    At present, the Seventh Hydropower Bureau and the Fifth Hydropower Bureau are relatively loud, and if you are interested, you can also consider the armed police hydropower.

  11. Anonymous users2024-01-27

    There are a total of 15 China Water Resources and Hydropower Engineering Bureaus, which are as follows:

    Changchun: Hydropower Bureau.

    Beijing: Second Bureau of Hydropower.

    Xi'an: Hydropower Bureau No. 3.

    Xining: Fourth Bureau of Hydropower.

    Chengdu: Fifth Bureau of Hydropower.

    Dandong: Sixth Bureau of Hydropower.

    Chengdu: Hydropower Bureau No. 7.

    Changsha: Eighth Bureau of Hydropower.

    Guiyang: Hydropower Ninth Bureau.

    Dujiangyan: Hydropower Tenth Bureau.

    Sanmenxia Water: 11th Bureau of Electricity.

    Hangzhou Water: Electricity 12th Bureau.

    Texas Water: Electricity 13th Bureau.

    Kunming Water: 14th Bureau of Electricity.

    Xi'an Water: 15th Bureau of Electricity.

  12. Anonymous users2024-01-26

    The First Engineering Bureau of China Water Resources and Hydropower is very good. China Water Resources and Hydropower First Engineering Bureau (China Hydropower First Engineering Bureau) is affiliated to China Water Resources and Hydropower Construction Corporation. Overall, including 2,914 professional and technical personnel, 1,786 intermediate professional and technical personnel, 263 senior professional and technical personnel, 358 qualified project managers, and more than 5,000 sets of large and medium-sized construction equipment.

    With the continuous improvement of the comprehensive ability and overall quality of the enterprise, the annual output value of construction and installation can be completed by the First Bureau of China Hydropower is more than 1.8 billion yuan, and the annual construction capacity is: 20 million cubic meters of earth and stone excavation and backfill; 1.5 million cubic meters of concrete poured; 20,000 tons of metal structures were fabricated and installed, 200,000 linear meters of foundation treatment and rock drilling and grouting were installed, and many large-scale hydro-generator sets were installed in different places during the same period.

    China Hydropower No. 1 is willing to carry out extensive and sincere cooperation with friends at home and abroad with sophisticated equipment, exquisite technology, scientific management and loyal commitment, and make greater contributions to the rapid development of water conservancy and hydropower construction.

  13. Anonymous users2024-01-25

    The ranking of water conservancy projects is 1 Hohai University, 2 Tsinghua University, 3 Wuhan University, 4 Dalian University of Technology, 5 Tianjin University, 6 Sichuan University, 7 China Agricultural University, 8 Xi'an University of Technology, 9 Huazhong University of Science and Technology, 10 Three Gorges University, 11 Yangzhou University, 12 North China Electric Power University, 13 Taiyuan University of Technology, 14 Changsha University of Science and Technology, 15 Xinjiang Agricultural University, and 16 Guangxi University.

  14. Anonymous users2024-01-24

    According to the results of the discipline evaluation of the Ministry of Education in 2012, the ranking of water conservancy engineering is 1 Hohai University, 2 Tsinghua University, 3 Wuhan University, 4 Dalian University of Technology, 5 Tianjin University, 6 Sichuan University, 7 China Agricultural University, 8 Xi'an University of Technology, 9 Huazhong University of Science and Technology, 10 Three Gorges University, 11 Yangzhou University, 12 North China Electric Power University, 13 Taiyuan University of Technology, 14 Changsha University of Science and Technology, 15 Xinjiang Agricultural University, 16 Guangxi University, etc.

  15. Anonymous users2024-01-23

    The correct order is (according to the authoritative results of the latest subject evaluation of the Ministry of Education): Hohai University, Tsinghua University, Tianjin University, Wuhan University, Dalian University of Technology, Sichuan University.

  16. Anonymous users2024-01-22

    Hehai, Wuhan University, Tsinghua University, Tianda, Sichuan University.

  17. Anonymous users2024-01-21

    Water Conservancy: Hohai University, Tsinghua University, Wuhan University, Sichuan University.

  18. Anonymous users2024-01-20

    Dear, the best is of course Tsinghua University's water conservancy, the best specialized water conservancy and hydropower university is 211 University, North China Electric Power University, Beijing and Hebei have campuses, and then Northeast Electric Power University, Shanghai Electric Power University, North China Institute of Water Resources and Hydropower. That's it..

  19. Anonymous users2024-01-19

    In general, the seventh, eighth, thirteenth, eleventh, fourth, and fourteenth innings are better and stronger.

    However, the subsidiaries of the hydropower group are very large, and each subsidiary is divided into many subsidiaries and project departments, and each subsidiary and project department are different, so it is difficult to determine which one is better.

    The China Hydropower Engineering Bureau is a state-owned enterprise. China Hydropower Engineering Bureau, including China Water Resources and Hydropower First Engineering Bureau to the Seventeenth Engineering Bureau, are all subordinate to China Water Resources and Hydropower Construction Corporation.

    China Water Resources and Hydropower Construction Group Co., Ltd. is a comprehensive large-scale state-owned holding enterprise with multinational operations, and is the largest water conservancy and hydropower construction enterprise in China, with leading scientific and technological level, strength and strong industry brand influence. It has the national construction general contracting special enterprise qualification, the right to contract and operate foreign projects, the right to import and export, and the AAA credit rating.

  20. Anonymous users2024-01-18

    Dear, hello, the fourth, seventh, eighth, fourteenth bureau are very good, and in the industry are more distinctive, at present, these bureaus are developing horizontally, involved in some subway, highway and other projects, not only do hydropower! In addition, the Gezhouba Engineering Bureau is also not bad.

    Questions. Which is better, the first or twelfth bureau of China's hydropower and hydropower.

    Dear, I hope you can be satisfied with my reply, and I look forward to your praise Thank you! Happy every day.

    Questions. I have already signed a contract with another company, and then I have interviewed another one and I was successfully interviewed, but I need to sign a contract with a termination letter, so there is no problem with this.

    Dear, you're amazing, this doesn't matter, I suggest you contact in advance.

    Questions. Contacted, after the termination of the contract, you can't sign it here.

    Dear, yes.

    Questions. Which is better, the first or twelfth bureau of China Hydropower.

    Hello dear, I personally feel twelve rounds.

    Questions. Which is the better salary?

    Dear, the scope of your question is beyond yours, I suggest you check it yourself!

  21. Anonymous users2024-01-17

    Summary. 2. China Railway 12th Bureau.

    The 12th Bureau of China Railway, formerly known as the Second Division of the Railway Corps, can be traced back to the Huimin Detachment of the Jilu Border District, which was established in 1940. Now, after more than 70 years of development, it has accumulated and formed a strong comprehensive competitive advantage.

    There are more than 13,000 employees, including more than 10,000 management and technical personnel. In recent years, the company's profitability has been strong, from 2014 to 2016, it has achieved a net profit of 100 million yuan, 100 million yuan and 100 million yuan respectively, and the average net profit is the first among the 25 engineering bureaus.

    Which bureau of water conservancy and hydropower in China is better.

    Hello, I have seen your question, and the answer is being sorted out rapidly, please wait for two minutes

    Hello, the fourth, seventh, eighth, fourteenth bureaus are very good, and in the industry are more distinctive, at present, these bureaus are developing horizontally, involved in some subway, highway and other projects, not only do hydropower! In addition, the Gezhouba Engineering Bureau is also not bad. At present, the seventh bureau (Chengdu), the eighth bureau (Changsha), and the fourteenth bureau (Kunming), which are recognized as the best in the industry.

    Which is better, the first or twelfth bureau of China's hydropower and hydropower.

    Which is better, the first or twelfth bureau of China's hydropower and hydropower.

    Hello, of course twelve rounds are better, one game is the worst.

    Which salary package is better.

    Which salary package is better.

    Comprehensive ranking of the strength, efficiency and salary of each bureau of China Railway: China Railway Fourth Bureau, China Railway 12th Bureau, China Railway 11th Bureau, China Railway 1st Bureau, China Railway 3rd Bureau, China Railway 18th Bureau, and China Railway 20th Bureau.

    Can the twelve rounds be ranked?

    Can the twelve rounds be ranked?

    Is a round the worst thing to do?

    Is a round the worst thing to do?

    Hello, in comparison, of course, twelve rounds is better than one.

    2. China Railway 12th Bureau, formerly known as the Second Division of the Railway Corps, can be traced back to the Jilu Border District Muslim Detachment established in 1940. Now, after more than 70 years of development, it has accumulated and formed a strong comprehensive competitive advantage. There are more than 13,000 employees, including more than 10,000 management and technical personnel.

    In recent years, the company's profitability has been strong, from 2014 to 2016, it has achieved a net profit of 100 million yuan, 100 million yuan and 100 million yuan respectively, and the average net profit is the first among the 25 engineering bureaus.

    Do you choose twelve rounds for comparison between the two?

    Do you choose twelve rounds for comparison between the two?

    Hello, the choice is in your hands, you see who you prefer to choose, I just list it with you for a comprehensive comparison, and the final choice is still on your side. Thank you for your question and have a great day

    How much is the salary of a game.

    How much is the salary of a game.

    Hello, the question you asked involves privacy, and our platform has rules that do not allow this kind of question. I'm sorry

Related questions
10 answers2024-03-04

According to the current division of majors, architecture, civil engineering, and water conservancy and hydropower engineering (that is, water conservancy and hydropower construction) are three majors, each of which is independent. If you want to talk about the relationship between them, it can be said that they are all civil engineering. >>>More

13 answers2024-03-04

Of course, yes.

Civil engineering refers to the planning, construction and maintenance of all infrastructure related to water, soil and culture. In general, civil engineering includes architecture, urban planning, and civil engineering. >>>More