I don t know what to do if I want to bid?

Updated on society 2024-03-19
16 answers
  1. Anonymous users2024-02-06

    Tender Table of Contents 1, Bid Letter 2, Power of Attorney of the Legal Representative of the Bidder.

    3. Certificate of legal representative 4. List of bidding ** (separately sealed) 5. List of bidding products ** and ** list (separately sealed) 6. Bidding equipment plan and ** description 7. Deviation of business terms 8. Bidder's comprehensive report 1 Enterprise profile and enterprise profile table 2 Main production equipment and testing equipment of the bidding enterprise 3 Balance sheet in the past three years.

    and profit and loss statement 4 sales performance of the bidding enterprise in the past three years 5 quality assurance and after-sales service commitment letter 6 quality assurance system 7 payment method, delivery time, preferential conditions commitment letter 8 delivery method and transportation 9 contract dispute resolution 10 economic behavior in the past three years prosecuted 9, bidder qualification certificate 1 bidder qualification statement letter 2 legal person business license and tax registration certificate 3 organization ** certificate.

    4 ISO9001 Quality Assurance System Certificate 5 Bidding Product Inspection Report 6 High Voltage Switchgear Production Order Rectification Certificate 7 Trademark Registration Certificate 8 Ping An Insurance Co., Ltd. of China ****.

    Product Liability Insurance Certificate 9 Other Honorary Certificates 10, Bidder Technical Certification Document 1, Bidding Equipment Technical Specification 2, Bidding Goods Supply List and Technical Performance Indicators 3, Equipment Manufacturing, Acceptance, Inspection Standards List 4, Complete Equipment Production and Inspection Process Flow Table 5, Document Delivery Plan and Technical Service and Training 6, Project Implementation Plan 7, Spare Parts and Service Personnel Table 8, Technical Deviation Table This is a complete set of blocks, you can refer to this is my previous bidding document.

    You can get to know the directory, which is basically the same. The tender should be 3 points, ** 2 points, and they should be sealed. Paper generally needs to be more than A4 paper.

    Okay, thicker. It's basically the same.

  2. Anonymous users2024-02-05

    This question Bidding is a technical job, if you don't have professional knowledge, it's difficult, if you want to learn, you can refer to the bidding guide book, of course, if you have the money to play casually, I don't have any opinion.

  3. Anonymous users2024-02-04

    To learn bidding, it is best to go to relevant enterprises to understand the industry on the spot and participate in related work, which will help you learn the relevant knowledge of bidding faster and better, and understand the current situation of this industry.

  4. Anonymous users2024-02-03

    If you have a major, you can find a bidding agency to apply. You can learn on the job, mainly to master national policies and be familiar with the process Other skills can only be obtained through practice. Personal opinion, for reference only.

  5. Anonymous users2024-02-02

    First learn from the national and local laws and regulations related to the company's bidding and procurement industry, and then learn the bidding document template, contract template, pricing specifications and other materials

  6. Anonymous users2024-02-01

    To learn bidding, it is best to work in this industry by yourself and practice it.

  7. Anonymous users2024-01-31

    Go to the exam, you will become after the exam, real gold is made of fire, participate in the supervision engineer, consulting engineer (investment), bidding engineer exam can be.

  8. Anonymous users2024-01-30

    Tongtong wine is going to be learned? Bidding things are also available.

  9. Anonymous users2024-01-29

    Summary. 1.It is recommended that the owner determine the person who is responsible for contacting the ** agency to avoid multiple policies and ensure the smooth implementation of the bidding.

    2.It is suggested that the supervision, construction, and procurement of equipment and materials of the project should all be included in a procurement plan and arranged as a whole.

    3.It is recommended that the owner should do a good job in defining the scope of bidding and subcontracting planning according to the actual situation of the project, so as to avoid disputes over subcontracting with the general contractor in the future construction, which will affect the construction period and quality.

    4.It is recommended that the owner carry out a separate procurement bidding for the large-scale mechanical and electrical equipment required for this project, and it is not suitable to be included in the general contracting of the project. Separate procurement bidding can reduce the equipment, ensure your company's control of the equipment model and technical performance, ensure that the contract price is paid to the supplier smoothly, reduce contract disputes, and facilitate contract management.

    5.In order to effectively control the cost, it is recommended that the owner should conduct the bidding of the supervision team before the design bidding, so that the supervision team can intervene in advance, start from the source of design, and effectively control the project cost.

    6.In order to choose a truly powerful bidding agency, your company can inspect the bidding company one by one when time permits, and understand the real situation on the spot.

    I don't bid for any company.

    Hello dear, happy to answer for you.

    1.It is recommended that the owner determine the person who is responsible for contacting the ** agency to avoid multiple policies and ensure the smooth implementation of the bidding. 2.

    It is suggested that the supervision, construction, and procurement of equipment and materials of the project should all be included in a procurement plan and arranged as a whole. 3.It is recommended that the owner should do a good job in defining the scope of bidding and subcontracting planning according to the actual situation of the project, so as to avoid disputes over subcontracting with the general contractor in the future construction, which will affect the construction period and quality.

    4.It is suggested that the owner of the industry will carry out a separate procurement bidding for the large-scale mechanical and electrical equipment required for this project, and it should not be included in the general contracting of the project. Separate procurement bidding can reduce the equipment, ensure your company's control of the equipment model and technical performance, ensure that the contract price is paid to the supplier smoothly, reduce contract disputes, and facilitate contract management.

    5.In order to effectively control the cost, it is recommended that the owner should conduct the bidding of the supervision team before the design bidding, so that the supervision team can intervene in advance, start from the source of design, and effectively control the project cost. 6.

    In order to choose a truly powerful bidding agency, your company can inspect the bidding company one by one when time permits, and understand the real situation on the spot.

    Dear, I hope my reply can help you, I wish you a happy life, thank you.

  10. Anonymous users2024-01-28

    Bidding process: 1. Preliminary work. It is necessary to conduct a preliminary investigation of the invested project, including the project content, construction period, and the availability of funds, etc., and understand the situation according to the investigation and combine it with its own reality to see whether it is suitable for bidding.

    2. Registration stage. According to the tender announcement, carefully prepare the registration materials, if it is pre-qualified, you need to bring all the required certificates (pay attention to whether a copy is required); If the qualification is pending, it must be handled according to the requirements of the qualification; Pay attention to the requirements for the payment of bid deposits and production costs.

    3. Bid preparation. After the registration is completed to obtain the bidding documents, it is necessary to carefully study the bidding documents, be familiar with the content of the bidding documents and related requirements, pay attention to the timing of the bidding documents and handle them as required. According to the requirements of the development of the tender, we must pay attention to the content of the tender to be complete, the signature and seal can not be omitted, if the engineering technical tender is a hidden standard, it should be prepared according to the relevant requirements, the cover, font, content have strict requirements, do not add snakes. Pay attention to performance requirements and bidding commitments, which are easy to score and easy to ignore.

    4. Bidding. Relevant personnel should sign in according to the time requirements, complete the relevant certificates, abide by the on-site discipline, sing the bid as required, listen to the arrangement, carefully record the bid opening, do the confidant of the other, and wait for the bidding results.

    5. Bid summary. Each time the bidding is completed, whether it is won or not, it is necessary to summarize it to see if there are any mistakes, whether there are good practices which are blind for future bidding reference, if the bid is won, it is necessary to handle the notice of winning the bid, sign the contract, and organize the construction (or supply) according to the requirements of the bidding documents. If the bid is not won, the bid deposit will be refunded as required.

  11. Anonymous users2024-01-27

    Responsibilities of the Bidding Office of the Construction Committee:

    1. Responsible for incorporating the industry's public resource trading activities into the public trading platform of public resources. Perform pre-transaction regulatory duties, accept bidding applications, and record and review the documents (announcements) of public resource transactions (bidding, auction, listing, etc.) in the industry.

    After the examination of qualified entry into the public resources trading procedures, bear the responsibility of review negligence; For regulatory loopholes and problems that arise before the transaction are discovered, remedial measures shall be taken in a timely manner and a management system shall be formulated and improved.

    2. Implement whole-process supervision of public resource transactions in the industry in accordance with the law (including on-site supervision such as extraction of ** institutions, selection of bid evaluation experts, bid opening, bid evaluation, etc.), to ensure the confidentiality of the process of bid opening and evaluation activities, and to handle the relevant procedures of the transaction in accordance with the regulations, and bear the responsibility for supervision and negligence.

    3. Establish and improve the bid evaluation expert database suitable for the characteristics of the industry as needed, supervise the use process, and assume the responsibility of supervision and negligence. Conduct management, assessment, rewards and punishments and training for bid evaluation experts and public resource trading intermediaries. Establish records of the negative conduct of relevant enterprises and personnel, and disclose them to the public in accordance with laws and regulations.

    4. Formulate the trading rules, operating procedures, regulatory systems and accountability systems of the industry, and organize the implementation after the approval of the Economic Ning Municipal Public Resources Trading Supervision and Management Committee. Establish and improve the industry's public resource transaction credit system, illegal behavior record announcement system, supervision and inspection system.

  12. Anonymous users2024-01-26

    Pay the money to get the tender documents and drawings.

    Pay the bid deposit.

    Prepare qualification documents and bidding documents according to the requirements of the bidding documents. Bids. Bid evaluation. The bid is awarded, and the bid is deemed to have won the bid after receiving the notice of winning the bid, and the performance bond must be paid after winning the bid. Construction begins.

  13. Anonymous users2024-01-25

    1.Obtaining or purchasing tender documents, sometimes pre-qualified documents2Prepare qualification documents and bidding documents according to the requirements of the bidding documents 3

    Pre-bid meeting (that is, to ask the tendering unit questions about the bidding documents of the project) 4Bids. The tendering unit reads out the bidding documents of each bidding unit 5

    Bid evaluation. 6. The bid evaluation experts will evaluate the bidding documents 6Calibration.

    Determine the winning bidder to sign the contract.

  14. Anonymous users2024-01-24

    1. Carefully reading the content of the bidding documents is the most critical step before writing the bidding documents. If this step is not done well, no matter how well written the bid is, it may be invalid. There are many people who do not carefully read the content of the bidding documents when writing the bid, and the written bids do not respond to the requirements in the bidding documents, and finally cause the bid to be scrapped.

    For example: the construction period required in the bidding documents, the credit certification documents required to be issued, and even the certification documents required to be issued should be colored, etc., such as not doing it as required when making the bid, it will cause the bid to be scrapped.

    2. Familiar with and understand the company or unit.

    To write a bid, first, the bid letter part will deal with some departments within the company, such as issuing audited financial statements for the previous three years, which must be provided by the finance; To provide similar completed works contracts, bid winning notices, etc., may be provided by the Contract Department; The staffing of the company may be provided by the administration department. Of course, some companies may already have the bidding documents they have done before, so they are not so troublesome.

    The second is the technical standard part, according to the bidding documents (including drawings) to take different construction techniques and measures for each sub-project, and it is necessary to explain clearly that sometimes it is not possible for one person to do.

    The third is the business part. The main thing is the budget, under normal circumstances, a reasonable and legal budget is the key to winning the bid. A budget clerk or cost clerk must be clear about the construction process of the whole project, simply put, the construction process of each sub-item.

    In this way, there will be no missing items when setting prices, and at the same time, it has a rigorous logic. B budget staff must be clear about the raw materials on the market, so that the budget will not be outrageous in the unit price, and can better grasp the profit margin of the budget. It is recommended to find a master with a belt, which is easier to use.

  15. Anonymous users2024-01-23

    Let the seniors find the bidding projects that the company has done before, to see the bidding documents and the bidding documents together, so as to compare a project to see how others are doing, and how to respond to the problems in the bidding documents one by one, if your previous staff will also note down the key difficult problems or experience of each bidding project, it is best to look at such documents, which are the valuable experience left by the predecessors, and then follow the people who take you to learn hard, How does he say that you think about what to do, and you also make a note for yourself every day to accumulate it, and have one or two projects of practical experience, just take the original project to simulate yourself to do bidding documents or have a project that is being tendered, and you can learn to do all or part of it, as long as you are attentive, there are many ways to learn.

  16. Anonymous users2024-01-22

    1. It is the most basic to understand the bidding documents and respond to the requirements of the bidding documents.

    2. On the premise of responding to the requirements of the bidding documents, try to make the bidding documents detailed and clear; Because it is generally scored by clause, it is important to have a good list of sub-categories.

    3. The business standard is to be reasonable, to see what is the way to open the bid, some are the lowest bid, some are the way of the quadratic average, and different bids should be determined according to the different ways of winning the bid, which is the most important thing, and the conditions that are met in front of this are the most important one to determine whether the bid can be won.

Related questions
15 answers2024-03-19

I don't know if you went to Korea to learn Korean well, but fortunately, I hope to go on to further education. There is a certain age limit for studying in Korea, so once you make up your mind. It's important to act on it right away. >>>More

7 answers2024-03-19

I'm going to do the same to your boyfriend, a man wants to have a woman who loves him wholeheartedly and doesn't have a grain of extra sand. That's why there will be extramarital affairs, "only depending on the individual's thoughts, not only all", but in the "password", there are some things about physiology, of course, it needs to be meaningful. . . Women's physiological things, it's not good, women don't know as much as men. >>>More

11 answers2024-03-19

Today, I will share a home-style version of the ramen method, without putting ramen agent, you can easily pull out thin and long, smooth noodles, and novice can also pull the success, let's see how to do it. >>>More

15 answers2024-03-19

I'm also such a girl, I don't know him well, I don't want to meet him, because I don't know what to talk about when we meet, it's embarrassing. Actually, I'm not the type of quiet.,It's just quiet to people you don't know.,I can talk to people who are very familiar with anything.,I think she's the same.,Take your time.,Let's text and chat first.,Let's meet again after you don't feel strange before.。

24 answers2024-03-19

As long as you don't have any thoughts about the third party, you can face it correctly, explain it carefully, and then say that there is such a girlfriend, and you have to believe in each other.