The construction organization design should first calculate the engineering quantity, consider the construction plan, select the construction machinery and tools, and determine the approximate number of people according to the engineering quantity. Then draw the construction schedule and adjust it continuously until the conditions of reasonable construction period and minimum cost are met. Finally, after the failure of the preparation is determined, the calculation of the material use plan, the personnel and staff species entry plan, and the safety tremor measures are broken.
-
I have a lot of construction organization designs and plans.
You add me to buckle 48293972
-
Hey, that's too much.
1. I don't know.
2. The first empty feels like using a node to indicate the work code and duration, and I don't know what to do later.
3. Free time difference refers to the maneuver time of the work without affecting the earliest start time of the work.
4. I don't know how to fill in, but the definition of total time difference is the maneuver time of the work without affecting the total construction period or the latest start time of the subsequent work.
5. The first empty should be the end node, and the others are unknown. The total time difference should be calculated from the end node of the network diagram against the arrow line to the start node.
6. It should be the time interval from the earliest end time of work i to the earliest start time of work j immediately after it.
7. The first null is probably a logical relationship, because the arrow line of the single-code network diagram only represents the logical relationship, not the duration. I don't know anything else.
Ignorance. Below in parentheses.
1. It should be a single-code network diagram and a double-code network diagram, because there are only these two network diagrams.
2. Could it be a node, a defeat or an arrow line and duration? I can't eat accurately.
3. Logical relationship and node.
4. The first two are empty. The last two nulls should be the earliest start time for work that starts with that node and the latest time for finishing the work with that node.
5. The line composed of the work with the smallest total time difference. I'm not sure about it. As for the number of days that affect the total construction period, as long as the total time difference is subtracted by the number of days delayed, if it is positive, it will not affect the total construction period, if it is negative, the negative number is a few days.
6. As above, it refers to the earliest start time of work I without affecting the immediate work J. TF is the maneuver time that does not affect the latest start time of J work or the total duration of work I. FF is the free time difference and TF is the total time difference.
7. Did you make a mistake? ff is free jet lag group fight, and the definition can be seen in front.
8. Look ahead.
9. It should be the earliest start time and the earliest completion time of each work in the direction of the arrow line, and the latest completion time, the latest start time, free time difference, and total time difference of the work should be calculated in the direction of the arrow line.
10. The end node starts the calculation of the reverse arrow line, and the latest completion time is calculated until the start node.
11. I don't know.
12. Forgot. I really can't remember.
13. I don't know.
14. Optimization of construction period, cost and resources.
15. I don't know.
-
1。The drawing is simple, easy to check and modify, the image is not intuitive enough, and there are many vertical and horizontal crossings of arrow lines.
-
How to leave an email address for you.
-
I can complete the construction organization design.
-
Special construction plan for foundation pit slope and edge protection.
Special construction plan for ash compacted piles.
Special program for temporary electricity consumption.
Formwork construction plan.
Rainy winter construction measures.
HSE construction scheme.
Panax notoginseng soil cushion special program.
Earthworks construction scheme.
Organizational design of the construction of residential buildings.
-
Mianyang City a bank accommodation building reinforcement project construction group (** after the reinforcement of brick-concrete structure) 47 brick-concrete construction organization 195
Construction organization design of decoration and decoration project of a local taxation office in Henan Province (brick-concrete structure) 217 Construction organization design of multi-storey brick-concrete residential building 721
Brick and Concrete Housing Construction Scheme 566
Brick-concrete structure construction organization design 1450
Brick-concrete structure construction code late organization design 420
Construction plan for brick-concrete structure of 6-storey apartment building 965
Six-storey brick-concrete structure construction organization design 1662
Organization design of brick-concrete structure construction 1160
Kindergarten brick-concrete structure construction organization design 527
Construction organization design of multi-storey brick and concrete residential buildings 1691
Construction plan for an eight-storey brick and concrete residential building 1133
Brick-concrete structure construction organization design template 2220
Construction organization design of brick and concrete house construction project 1166
Construction organization design of multi-storey brick-concrete structure office building 1995 Civil brick-concrete structure formwork construction plan 981
Brick and concrete structure commercial residential construction organization design 1090
Relocation of brick and concrete farmhouse 280
Construction organization design of brick-concrete structure and steel-concrete frame structure expansion project 420 construction plan of residential buildings in brick-concrete structure community 695
Brick-concrete structure aluminum-destroyed molded plastic steel doors and windows manufacturer office building construction organization design 260 brick-concrete structure residential building construction plan.
-
It's too long to send to you!!
-
I'm sorry, but my side is all framed.
-
Is your QQ email address correct, sent a copy, I don't know if you received it?
Legal analysis: ensure that the vehicle is in good condition, the vehicle is clean and tidy, the three certificates are complete, consciously obey the command of the dispatcher of the project department, and drive safely in strict accordance with the on-site traffic signs and the actual on-site road. All construction units and departments of the project department must have their own vehicles, and must hold the internal vehicle pass issued by the office of the project department, and the voucher can enter and exit. >>>More
This thing should be self-created and affectionate.
I've found two for you, take a look.
The second two can be changed one by one >>>More
The main content of the tender can be divided into three parts: procedural terms, technical terms, and commercial terms. It contains the following nine main contents: >>>More
How should I write an application correctly?