At present, the bidding company is determined by the level of the bidding project and the workload of the project, and the project at different levels is not the same when making the bidding. Generally, ** is about 1200 yuan - 3400 yuan per bid, and there are also charges according to the size and complexity of a project, usually between 1200 yuan and 3500 yuan per bid.
It is necessary to describe in detail the production outline, the material, weight, external dimensions and various functional requirements of the equipment of the processed product. The basic requirements should also describe the processing cycle, the working time per unit of production, energy consumption, etc. The basic requirements should also explain the requirements for noise, three wastes, environmental protection, labor insurance, etc.
-
This question can not simply say how much money is needed, which should be determined according to the scalar quantity of the project, the amount of the project and the number of bids, which normally requires several thousand yuan.
-
Hello, to make a construction project bid, usually in the range of a few thousand yuan to ten thousand yuan.
It is necessary to determine the cost of bidding according to the situation of the project and the number of project lists.
-
The project rejection bid should list the enterprise profile, the company's business performance of the Spring Festival banquet, the enterprise qualification certificate, the performance of the enterprise in the past three years, the construction machinery equipment, the bid notice, the authorization certificate, the bid deposit, the financial situation in the past two years, the bank certificate of its own funds, the bid commitment, the project budget, the first book, the construction organization design, the liability for breach of contract, etc.
[Legal basis].Article 27 of the Zhaoxiang Suspected Bidding Law.
Bidders shall prepare bidding documents in accordance with the requirements of the bidding documents. The bidding documents shall respond to the substantive requirements and conditions put forward in the bidding documents. If the bidding project belongs to construction, the content of the bidding documents shall include the resume, performance and machinery and equipment to be used to complete the bidding project by the project leader and the main technical personnel.
-
The first point is to have the right to an independent contract, the second is to have the ability to perform the contract, the third is that it has not been ordered to suspend business and the bidding qualification has been cancelled, and the fourth is that it has not won the bid by fraud and serious breach of contract and major project quality problems in the past three years.
-
1) Detailed understanding of the requirements of the bidding documents.
Carefully read the bidding documents, understand the bidding project, analyze the bidding requirements, or it is necessary to conduct on-site investigation, and do a good job in the bidding strategy, which is the premise for us to do a good job in the bidding documents.
2) Tender preparation requirements.
Strictly in accordance with the requirements of the bidding documents for the preparation of the order, format and content of the preparation; The bidding documents need to prepare a cover page, table of contents, set page numbers, and there should be no typos, etc. (especially the company name).
3) Qualification review of bidding documents.
According to the qualification requirements of the bidding documents, comprehensive analysis and evaluation, on the basis of meeting the requirements of the bidding documents, do a good job of point-to-point bidding documents.
4) the commercial part of the bidding documents and the construction part.
According to the business project of the bidding documents, check the response content of the bidding documents in turn, and under normal circumstances, it is necessary to fully respond to the requirements of the bidding documents, and there are terms that are better than the bidding documents need to be clearly written in detail.
The construction part also needs to be checked, inspected, improved and supplemented one by one. The implementation plan must be combined with factors such as the project site investigation and the actual implementation environment to make a special technical plan.
5) The bidding documents are perfect.
According to the instructions of the bidding documents, check, improve and supplement the bidding documents one by one, and there can be no lack or non-satisfaction.
1. What is the proportion of project bid deposit?
1) The amount of the bid bond usually has two ways: a relative proportional amount and a fixed amount. The relative proportion is based on the total bid price. In order to avoid the tenderer setting an excessively high bid bond amount, different types of bidding projects have relevant provisions on the maximum amount of bid bond.
2) Engineering construction projects: the bid deposit shall generally not exceed 2 of the total bid price, and the maximum shall not exceed 800,000 yuan.
3) Survey and design projects: If the bidding documents require the bidder to submit a bid bond, the amount of the deposit is generally not more than 2 of the survey and design fee, and the maximum is not more than 100,000 yuan.
Second, the bidding process of construction projects.
1) Bidding for construction projects.
Public bidding shall issue a tender announcement. The tender announcement shall be published through newspapers and periodicals or other media.
2) Bidding for construction projects.
Bidders shall prepare bidding documents in accordance with the provisions of the bidding documents.
3) Bid opening for construction projects.
The opening of bids shall be carried out in an open manner in accordance with the time, place and procedures specified in the bidding documents. The bid opening shall be presided over by the tenderer or the bidding and bidding intermediary agency, and the members of the bid evaluation committee, representatives of the bidders and representatives of relevant units shall be invited to participate.
4) Bid evaluation and award of construction projects.
Bid evaluation shall be carried out in accordance with the provisions of the bidding documents. The tenderer or the bidding intermediary agency is responsible for the establishment of the bid evaluation committee. The bid evaluation committee is composed of representatives of the tenderer and its hired technical, economic, legal and other experts, and the total number is generally more than 5 odd numbers, of which the hired experts shall not be less than two-thirds.
Persons who have an interest in the bidder shall not enter the bid evaluation committee. The bid evaluation committee is responsible for evaluating the bid. The bid evaluation committee shall review all the bidding documents, and shall decide that the bidding documents that are substantially inconsistent with the provisions of the bidding documents shall be invalid.
Tender Template (Construction Works).
Construction unit: >>>More
The hardships of climbing the mountain.
On the morning of August 1, the weather was sunny and sunny, with a few white clouds floating in the blue sky, and the soft sunlight shone on the earth, as if a "golden quilt" had been covered for the earth that had not yet woken up. A few friends and I went to Bun Mountain with excitement to enjoy the mountains and rivers. >>>More
Summary. Kiss <>
I'm glad to answer for you: how to write a rental contract is beneficial to tenants, and here are some terms that can be written in the rental contract that are beneficial to tenants:1 >>>More
Decoration project file receipt list.
Construction unit: Project content: No.: >>>More
Banyan tree: large tree with a wide canopy; Old trees often have rusty brown aerial roots. The bark is dark gray. >>>More