How to be a good installation engineering technician

Updated on workplace 2024-04-05
9 answers
  1. Anonymous users2024-02-07

    1. Strictly implement the national safety and fire protection regulations and implementation rules, and implement the company's engineering site fire protection management regulations and project safety production management regulations. Assist the project manager to do a good job in the safety work of the construction site, conscientiously implement the policy of "safe production" and "prevention first", and strictly implement the "Construction Safety Standards" and "Construction Team Site Safety Technical Specifications".

    2. Conscientiously implement the company's "safe and civilized construction measures", strengthen the inspection of the construction site, ensure the safety of personnel and materials entering the construction site, report in advance if unsafe factors are found, and take active measures.

    3. Adhere to the principle, conscientiously follow the relevant regulations of the superior and the company, boldly supervise and inspect the authority, dare to stop the illegal command, and have the right to stop the illegal operation.

    4. Participate in production meetings and technical disclosures, review the construction organization design and safety technical measures plan, and put forward safety work requirements for the construction situation.

    5. Pay attention to safety and fire prevention, especially the safety management of flammable and explosive products and the safety operation procedures of electrical appliances, establish a fire protection system, conduct regular inspections, and make records.

    6. Strengthen the safety management of the construction site, wear a safety helmet when entering the site, and set up safety warning signs and safety technical operation procedures.

    7. Construction personnel entering the construction site shall not work after drinking, shall not fight, steal, and smoke shall not be allowed on the construction site.

    8. Within the scope of construction, the security personnel and vehicles must enter and exit with vouchers, and the items must be used to go out with the door slip, strengthen the inspection of the security personnel, and eliminate the hidden dangers of accidents.

  2. Anonymous users2024-02-06

    Installation engineering technicians need both theory and practice: theory is the basic knowledge of school learning: (electrical engineering, mechanical foundation; mechanical drawing); Management knowledge (relevant regulations; Fundamentals of Management; knowledge of engineering management, etc.) and so on.

    In addition, it is necessary to have some experience in the actual operation of the installation project, and it is best to work in the installation team for 3 months, which will help to have a perceptual understanding of technology and business management in the future, and will not be blindly commanded. If you have a college degree, it is best to take a "constructor" qualification, which will be helpful for personal development.

  3. Anonymous users2024-02-05

    The main work of engineering technicians is to participate in the preparation of construction plans, and prepare specific construction plans, report to the project manager for comprehensive evaluation and implementation, rational use of labor, grasp the quality dynamics of the work, and organize operators to carry out quality self-inspection, mutual inspection, etc.

    The main work content of an engineering technician is as follows:

    1. Participate in the preparation of the construction plan, prepare a specific construction plan, and report to the project manager for comprehensive evaluation and implementation;

    2. Familiar with and master the design drawings, construction specifications, procedures, quality standards and construction technology. Make technical disclosure to the team, supervise and guide the actual operation;

    3. Organize construction according to the construction plan, technical requirements and construction organization design;

    4. Rational use of labor, grasp the quality dynamics of the work, and organize operators to carry out quality self-inspection and mutual inspection;

    5. Inspect the construction quality of the team and stop the behavior of violating the construction procedures and specifications;

    5. Inspect the construction quality of the team and stop the behavior of violating the construction procedures and specifications;

    7. For the losses caused by the construction quality, it is necessary to investigate in a timely manner, analyze the causes, assess the losses, formulate corrective measures, and deal with them in a timely manner after being approved by the project engineer;

    8. Responsible for on-site civilized construction and safety disclosure;

    9. According to the actual construction progress of the project, provide the material demand plan to the material department;

    10. Participate in the investigation and handling of safety accidents, do a good job in the statistics, analysis and reporting of work-related accidents (traffic), propose measures to prevent accidents in conjunction with relevant personnel, and supervise and inspect the implementation;

    11. Work with relevant personnel to do a good job in anti-corrosion, anti-mildew, heatstroke prevention and cooling and protection of female workers, and supervise the timely distribution and rational use of protective supplies, health food and soft drinks by relevant departments;

    12. Do a good job in the monthly report of work-related injuries, establish work-related injury accounts, and do a good job in the management of original records of safety inspections and safety data files;

    13. Make a good daily patrol safety record.

  4. Anonymous users2024-02-04

    Learn more, watch more, ask more!

    Be sure to ask more questions to your seniors, you can learn a lot of tricks!

    The older you get, the more valuable it is!

  5. Anonymous users2024-02-03

    1. Master relevant professional knowledge;

    2. Work with a serious and responsible attitude;

  6. Anonymous users2024-02-02

    Data clerk, technician is a hard job, but also the construction unit of the relatively low level of technical positions, may be the usual work, will be more irritable, but, the bird knows the ambition of the bird, as long as the hard work, there are many opportunities, only to lay a solid foundation, in order to work hard.

    Conscientiously familiarize yourself with the construction drawings, put forward the problems existing in the drawings, and do a good job in the review of the drawings.

    Prepare the construction drawings (construction) budget, calculate the material analysis summary table, and propose the material plan according to the sub-project (foundation, main body, decoration, layering) (the budget work is generally carried out by the budget officer, and the material table is sometimes submitted by the material officer).

    Prepare construction organization design and construction plan, and formulate various safety, quality and cost measures in the construction process. Do a good job in the technical disclosure information of each sub-project, and make technical disclosure to each team.

    Responsible for the positioning, pay-off, leveling, settlement, and observation records of the project (generally cooperated with surveyors and constructors).

    Responsible for the custody of measuring tools and instruments, and regularly calibrate measuring instruments (generally with surveyors).

    Carry out the collection and sorting of technical data in the construction process, and file, bind and deliver the data after the completion of the project. Collect and sort out the change visa information in the construction of the project.

    Do a good job in the cost accounting of divisions and sub-items, and settle the divisional, sub-item, stratified and individual completion task accounts of each construction team on time (generally cooperate with the budget officer).

    Provide the construction site mix ratio, including concrete, mortar, etc., and send the sample to the laboratory that needs to issue data from the laboratory. Carry out the production, maintenance, inspection and test report of the on-site test block.

    According to the actual situation of the site and the general plan of materials, prepare monthly and weekly plans for materials, and be responsible for the preparation of seasonal construction measures.

    Conscientiously cooperate with the work of the project manager (constructor) and complete other tasks assigned by the engineering manager.

  7. Anonymous users2024-02-01

    If you want to be a good construction technician, you must strictly follow the job responsibilities of the technician to demand yourself:

    Construction Technician Job Responsibilities.

    1. The technician is the one who carries out various technical work under the leadership of the engineer in charge. 2. Cooperate with the engineer in charge to prepare a monthly report on the quality and safety of the monthly construction progress, report the capital budget and specific payment in the field under his management to the engineer in charge, and participate in the contact and coordination between the relevant project and the first department, the design unit and the construction unit before the start of construction. 3. Responsible for the preliminary review of the construction organization design submitted by the construction unit, and cooperate with the supervision during the construction process to be fully responsible for the construction inspection and acceptance of the relevant projects until the completion and acceptance are delivered to use.

    4. Master and be familiar with construction drawings, construction specifications and quality inspection and acceptance evaluation standards, and be responsible for the inspection and supervision of civilized construction such as project progress, safety and fire protection. 5. Responsible for on-site coordination, design, civil engineering, installation and the contradiction between progress and quality. 6. Participate in the bidding and contract preparation of projects, materials and equipment within the scope of the project under management, and supervise, inspect and approve the supply quality of incoming materials and equipment in a timely manner.

    7. Verify and sign the information about the progress, quality and quantity of the project, and report to the chief engineer and department manager, review and sort out the project completion information, and report to the data clerk for the record. 8. Timely and on-site supervision found that the construction is not according to the drawings and the construction is not in accordance with the specifications, if the on-site correction is invalid, cooperate with the supervision to issue a suspension and rectification order, and report to the chief engineer. 9. Supervise the safety of on-site safety facilities, measures and the safety status of personnel and machinery and equipment in construction, and put forward rectification opinions in a timely manner.

  8. Anonymous users2024-01-31

    I just came to the construction unit for a month, and now the construction captain has something to go home for half a month, and asked me to temporarily be responsible for the installation of the steel structure, which is a little apprehensive. After all, I studied mechanical manufacturing and design in college. I would like to ask you what I should do well, and what should I pay more attention to?

  9. Anonymous users2024-01-30

    What the technician does: what needs to be done to lay the foundation, and then build scaffolding, that is, formwork engineering, in that is, rebar binding - rebar engineering, and finally pouring concrete - concrete engineering) is basically these processes, layer by layer to build up. Measurement pay-off (must know, rarely do it yourself, there is a survey team).

    Then the technician is mainly responsible for writing the technical disclosure - to the construction team of the construction staff to the construction, we just play a supervisory role, and then after each step of the project is completed, then submit to the supervision for inspection, this is the technician's big deal. In many places, technicians still have to calculate the amount of work, and even have to learn a little bit about things in the laboratory (it is better to know everything, otherwise they will not be able to solve many things in time - reflect the ability).

    If there are any changes in the project, those drawings are sorted out by the technician and then reported.

    Finally, after the completion of the project, there is a review of the completion data, basically there is no problem (I don't know if the usual data is done by you, anyway, I want to write the data) but when it comes to large projects, the kind of projects in the city, the data is very troublesome, and a lot of it has to be rewritten.

    Suggestion: Take the construction drawings to calculate the engineering quantity when you have nothing to do, which is very helpful to understand the entire construction process of the project, and it has made great progress. Let's take an analogy - if you calculate the amount of reinforcement in a certain layer, you will know how long the reinforcement is, and whether the anchorage length is 35d or 40d

    How long is the hook, how long is the binding bar, how many centimeters is the protective layer, and how long is the hook where the encryption is. Then the thickness of the floor slab, the inclination, the amount of concrete,. **You are clear about the beam, the construction is much more convenient, the key is that everyone thinks you have the ability, the natural upper level to learn a lot of knowledge, first of all, the basic knowledge, that is, some concepts and calculations learned in the university, and then the construction specifications (housing construction specifications) are some indicators stipulated by the state, such as piling, the verticality of the pile does not exceed 5%, the deviation of the pile diameter shall not be greater than a few centimeters, and the deviation of concrete thickness shall not be greater than a few centimeters.

    And many more. Construction data (construction plan. Technical disclosure, change disclosure, management data a lot) you have a lot of supervisors Section chiefs, you can copy more points to see yourself, basically what the technician does is that you copy the data on those things, you see more when you operate your own handy, I do this, progress is very fast.

    The specific implementation is still slowly groping by myself, and I have been on the construction site for a long time, and I have no teacher. The first is to learn construction first, have the ability and experience and then move on to management.

Related questions
6 answers2024-04-05

Method steps.

1. Be familiar with the quality standards and physical standards of the product, understand and master the difference between the actual indicators of the product and the product standard, and find out the key index items and general index items. The key indicators must be qualified, and the general indicators have room for fluctuation in quality control. >>>More

16 answers2024-04-05

The beginner's tutorial for AE novices is as follows: >>>More

7 answers2024-04-05

Front office management is comprehensive, comprehensive and coordinated in the hotel, which is the nerve center of the hotel and the link between customers and the hotel. The customer's first impression and final impression of the hotel are formed in the front hall, and the overall service quality and service level of the hotel are reflected in the front hall. >>>More

13 answers2024-04-05

A good mother is a role model for her daughter or son. Don't just be reasonable, learn to lead by example. >>>More

11 answers2024-04-05

I think the following points should be noted; 1. To be a good manager, especially a grassroots leader, we must first put responsibility first and dilute rights. Second, you should try your power to be "decentralized" and "open". We must exercise strict self-discipline and never monopolize power and abuse power for personal gain. >>>More