-
Do you know that now? We only do the labor, how much money can be done.
-
Founded in 1999, it is a professional color brick, color tile plastic mold box, manhole cover mold, high-speed railway cover mold, building materials mold, cement products mold, concrete prefabricated parts mold, high-speed railway highway cement prefabricated mold, bridge, tunnel cover mold, river, dam slope protection cover plate mold, pool, canal, guardrail, fence, fence and other molds. Color brick mold, color tile mold, roadside stone mold, manhole cover mold, roadside stone side drainage mold, drainage manhole cover mold, sewage manhole cover mold, communication manhole cover mold, cement manhole cover mold, lawn mold, river slope protection brick plastic mold box manufacturer.
Our factory produces multi-functional cutting and forming machines, color brick hydraulic presses, various steel molds, steel fiber production equipment, concrete inspection manhole cover production equipment, sidewalk brick and brick supporting plates, block cutting machine composite supporting plates and other products, providing customers with construction consulting, feasibility production reports to help build factories and training production personnel for the production of municipal building materials products, wall materials, cement products and a series of high-quality services.
The main products are:
High-speed railway cover: high-speed railway cable cover, high-speed railway cobblestone cover, high-speed railway bridge cover, highway, railway, bridge, culvert, tunnel, plant cable engineering cable cover mold, mold box. Our factory produces and processes all kinds of high-speed railway cover mold box molds, has a certain production scale and experience, and professional technology can meet the requirements of each customer.
-
Dear, you are very happy to answer your <>
How much is a cubic meter of high-speed slope protection project, the contractor does not package 200 yuan a cubic meter can do, this highway slope protection is actually a stone wall, basically if it is just 200 yuan a cubic meter can be done manually, of course, it still depends on the actual situation, how many meters of slope protection is the highest, whether there is high-altitude work, etc., these situations need to be considered, if there are more high-altitude operations, the slope protection height may need to talk about more than 200 cubic meters. It is difficult to do one cube, and one cube is 78 pieces. To do 6 arches is only one cubic meter.
If it is fully artificial, it generally costs 280 yuan per cubic meter. The arch skeleton slope protection contractor package slurry sheet stone is 200 yuan m3 (Party A provides sheet stone) cast-in-situ C15 water retaining rib 660 yuan m3 Note: the skeleton net distance is not the same, the cross-sectional size is not the same, and the engineering volume of a square area is not the same.
-
Summary. Hello, I'm glad to be able to answer your questions. Slope protection yuan cube, high-speed slope protection project, ** as follows: canal yuan meter, slope protection yuan cube, six shuttle block element cube, arch skeleton slurry stone foot protection element cube, high-speed slope protection project how much is a cube.
Kiss! Hello, a blessing, a warmth, a touch. With a cautious and grateful heart.
Life is full of envy and trembling! Your question has been received, it will take a little time to type, please wait a moment and please do not end the consultation. You can also take this time to provide more effective information, so that I can better answer for you, rough is sorting out the answer for you, please wait a while!
Hello, I'm glad to be able to answer your questions. Slope protection yuan cube, high-speed foundation protection slope project, ** so messy: canal yuan meter, slope protection yuan cube, six shuttle block element cube, arch skeleton slurry stone foot guard cube, <>
Leisurely Fight Cover] <>
If my answer is helpful to you, please give a thumbs up (comment in the lower left corner), look forward to your like, your efforts are very important to me, and your support is also the motivation for my progress. If you feel that I am satisfied with my answer, you can click on my avatar one-to-one consultation. Finally, I wish you good health and a good mood!
Omori destroys saffron] <>
-
Clearance of labor services**,**excluding taxes and fees, the data is true, for reference only. 1. Concrete prefabricated skeleton slope protection is 297 yuan per side. 2. The cast-in-place concrete slope foot foundation is 117 yuan per cubic meter.
3. Active protection net is yuan per square meter. 4. Passive protection net is yuan per square meter. 5. The foot of the slurry stone slope and the slope are 387 yuan per cubic meter.
6. The slurry stone trapezoidal embankment side ditch is 268 yuan per cubic meter. 7. The cast-in-situ concrete interception ditch is 243 yuan per square meter per square meter. 8. The triangular prefabricated block ditch is 333 yuan per cubic meter.
9. The cast-in-place rapids groove and stepping are 459 yuan per cubic meter. 10. The cast-in-place anchor cable frame girder is 594 yuan per cubic meter. 11. The production of steel bolts is 223 yuan per ton.
12. The hexagonal block of hollow brick for slope protection at the head of the bridge is 207 yuan per cubic meter. 13. The slope protection step of the bridgehead is 333 yuan per cubic meter. 14. The bridgehead sheet stone concrete is a stone blocker wall per dollar.
-
Summary. Hello, different slope protection materials (such as concrete, slurry masonry, dry masonry, turf, grid beams, Renault pads, ecology), different slope protection thicknesses and local labor unit prices. The unit price of the slope protection contractor is also different, such as the thickness of the slurry masonry slope protection, between 35 and 40 yuan per square meter.
The labor is 70 yuan per party, and the owner needs to provide a small ton forklift to cooperate with the operation, and the stones and sand paddles can not be too far.
Labor cost per cubic meter of skeleton slope protection.
Arch skeleton slope protection contractor slurry stone is 200 yuan m3 (Party A provides sheet stone) cast-in-place C15 water rib 660 yuan m3 Note: the skeleton net distance is not the same, the cross-sectional size is not the same, the engineering quantity of a square area is not the same, the skeleton slope protection is generally collected according to the square area, generally 4m net distance, each square slurry stone is, the amount of each square cast-in-place rib is each square, and the flange is generally calculated according to the length according to the cross-sectional size. In addition, there are soil fills and grass planting, and the soil fills are generally 3 yuan a square.
The above unit price is the labor subcontract price in Hunan, which may be different due to the different construction environment of the project!
Arched skeleton, under normal circumstances, 350 yuan ton is a more suitable unit price.
How to calculate the construction cost of highway slope protection, it is more than one meter, or more than one square meter, ask for guidance, thank you.
It is between 230 and 260 per cubic meter. Calculated according to the square: about 30 yuan (it is a concrete block 500 * 400 * 100 trough type).
How to calculate the construction cost of highway slope protection concrete grid? Including formwork support and pouring concrete.
Hello, different slope protection materials (such as concrete, slurry masonry, dry masonry, turf, grid beams, Renault pads, ecology), different slope protection thicknesses and local labor unit prices. The unit price of the slope protection contractor is also different, such as the thickness of the slurry masonry slope protection, between 35 and 40 yuan per draw. The labor is 70 yuan per party, and the owner needs to provide a small ton forklift to cooperate with the operation, and the stones and sand paddles can not be too far.
Skeleton slope protection per cubic meter labor cost arch skeleton slope protection contractor slurry stone is 200 yuan m3 (Jiatong Chinese side provides sheet stone) cast-in-situ C15 water rib 660 yuan m3 Note: the skeleton net distance is not the same, the cross-sectional size is not the same, the engineering quantity of a square area is not the same, the skeleton slope protection is generally collected according to the square area, generally 4m net distance, the amount of each square slurry stone is, the amount of each square cast-in-place rib is each square, and the flange is generally calculated according to the length according to the cross-sectional size. In addition, there are soil fills and grass planting, and the soil fills are generally 3 yuan a square.
The above unit price is the labor subcontract price in Hunan, which may be different due to the different construction environment of the project! Arched skeleton, generally 350 yuan per ton is a more suitable unit price.
How much does grid beam construction cost? How is it calculated? By square or cubic? Including formwork and concrete pouring.
The highway slope protection grid beam is 300 high and 200 wide
How are you please? Master ** went?
-
Summary. Hello dear! I've seen your question and I'm trying to sort out the answer, and I'll get back to you in five minutes, so please wait a minute
Hello dear! I've seen your question and I'm trying to sort out the answer, and I'll get back to you in five minutes, so please wait a minute
Hello, happy to answer your <>
Highway concrete slope protection manual 120-160 a cubic.
The labor cost per square meter is about 40 yuan, and the labor cost of pouring concrete is about 35-40 yuan per square meter.
I hope the above is helpful to you If you are satisfied with me, please give a thumbs up Welcome to the consultation <> next time
How much is the reinforced concrete slope protection.
The labor cost per square meter is about 40 yuan, and the labor cost of pouring concrete is about 35-40 yuan per square meter.
-
Summary. How much is the general cost of concrete slope protection: according to conventional calculations, unreinforced concrete is about 450-500 yuan per cubic meter, and the installation mold is about 600 yuan cubic meter! If there is a steel bar, then calculate the cost of the steel bar!
How much is the general cost of concrete slope protection: according to conventional calculations, there is no Zheng sell auspicious concrete about 450-500 yuan per cubic meter, and the installation of mold is about 600 yuan cubic meters! If there is a steel bar, then calculate the cost of the steel bar!
15 cm thick.
Answer: C25 commercial nuclear eggplant concrete 410 yuan cubic meter. 15 metric weight = 15 centimeters = meters, cubic meters. 410* yuan. Therefore, C25 concrete, 15 cm thick socks, 1 square yuan.
Different forms of slope protection are different, generally 100-300 yuan per square meter.
C25 A: C25 commercial core eggplant concrete 410 yuan cubic meter. 15 metric weight = 15 centimeters = meters, cubic meters. 410* yuan. Therefore, C25 concrete, 15 cm thick socks, 1 square yuan.
Slope protection. How much is a pound squared.
According to conventional calculations, the unreinforced concrete is about 450-500 yuan per cubic meter, and the additional mold is about 600 yuan cubic meters! If there is a steel guess spike burning tendon spike is empty, then the family collapse and calculate the cost of the steel bar!
C25, 15 cm thick slope protection how much is a square.
Unreinforced concrete is about 450-500 yuan per cubic meter.
Square? Different forms of slope protection are different, generally 100-300 yuan per square meter.
In China's general plain and micro-hill areas, the average cost per kilometer of expressways is about 30 million yuan, and the average cost per kilometer of expressways in mountainous areas is close to 40 million yuan. >>>More
For how much is a square meter of scraping putty, we must first figure out this problem. It contains three points: one is the method of scraping putty, the second is the material used in scraping putty, and the third is the calculation method of scraping putty area. The current market price is 12-18 yuan per square meter. >>>More
The price of manganese sand does not depend on its name, but on itself, such as the level of purity, the size of the specification, the amount of transportation cost, etc., just like the same style of a piece of clothing with different fabrics, the price is different in different places. At present, the price of manganese sand is not very high, roughly between 250 and 300. Of course, maybe the truth will be higher or lower than that.
How much does 10 square meters of fresh cold storage cost, this should first determine the size of the cold storage, according to the area of the cold storage cost budget. >>>More
How much is a square meter of ice cream cold storage installation, how much is the cost of ice cream cold storage and the capacity of cold storage has the most direct relationship, but the first cold storage can not be calculated by how much money per cubic (square), this should first determine the size of the cold storage, according to the area of the cold storage cost budget. >>>More