-
I only know what the general method of garbage disposal is As for how much manpower, material benefits and funds are needed, I don't know much The following is for reference only Thank you: 1Landfill treatment Landfill is an effective method for absorbing a large amount of municipal solid waste, and it is also the final treatment method for all waste treatment process residues.
The so-called direct landfill method is to fill the garbage into the prepared pit and cover it with compaction, so that it undergoes biological, physical and chemical changes, decomposes organic matter, and achieves the purpose of reduction and harmlessness. 2.Incineration The incineration method is a method in which garbage is placed in a high-temperature furnace to fully oxidize the combustible components in it, and the heat generated is used for power generation and heating.
The waste-to-energy system jointly developed by Westinghouse and O'Connor has been successful. The incinerator of the system can turn the garbage with a humidity of 7% into a dry solid for incineration when burning garbage, with an incineration efficiency of more than 95%, and at the same time, the high temperature on the surface of the incinerator can convert heat energy into steam, which can be used for heating, air conditioning equipment and steam turbine power generation, etc., 3Composting treatment piles up household garbage, keeps it warm to 70 storage, fermentation, and decomposes organic matter into inorganic nutrients with the help of the ability of microorganisms in garbage to decompose.
After composting, household waste becomes hygienic, odorless humus. It not only solves the way out of garbage, but also achieves the purpose of recycling, but the amount of domestic garbage compost is large, the nutrient content is low, and long-term use is easy to cause soil compaction and groundwater quality deterioration, so the scale of composting is not easy to be too large. Regardless of whether municipal solid waste is landfilled, incinerated or composted, it must be pre-treated.
The pre-treatment procedure first requires residents to bag domestic garbage according to the ** substances, organic substances and inorganic substances, and then, the garbage disposal company collects and transports them according to the classification, and treats and utilizes them separately.
-
Design department salary, engineering department salary, plant costs, machinery and equipment, raw materials, transport vehicles, basically that's all!
The specific amount to use depends on the number of employees, plant area, and the number of raw materials!
If your question is more detailed, the answer will be more accurate!
-
Professional Hangzhou company registration, enterprise change, consulting on QQ
-
Design department salary, engineering department salary, plant expenses, machinery and equipment, raw materials, transport vehicles, etc.
-
Fees and booth configuration:
Zone A: Special installation (raw space) and standard change only.
Special decoration (raw space): RMB 1000 square meters.
Standard change booth (9 square meters) 11,000 yuan.
Zone B: Special (Raw Space): RMB 900 sq.m.
Standard booth (9 square meters): 9,000 yuan.
Another 800 yuan booth will be charged for the corner position.
Description: 1. The special equipment (raw space) does not contain any facilities. To apply for a special booth, you need to pay the venue management fee to the exhibition hall during the exhibition arrangement, and you need to rent an electric greeting box for lighting or other purposes, 2. Standard booth configuration:
A: Booth construction and dismantling B: Pavilion cleaning and security C:
1 negotiation table, 2 chairs, D: 2 spotlights and 220 volt power socketsE: 1 wastebasket.
3. In addition to the standard exhibition chain and bridge configuration, the standard booth also includes unified decoration such as deformation and upgrading to make the booth more beautiful.
The charging standard of exhibition design booth charging is different in different regions. One place has one price, and the price of the local materials in the shed should also be considered.
-
1: First of all, booth design, if your company has its own design of the renderings, then let the builder build according to the renderings you provide, if not, you have to find a design company to design the renderings, of course, some construction companies are to provide renderings design, you can according to your own requirements let him design the renderings first, and then report to the leadership for approval.
2: The construction materials on the exhibition site are generally required to use fireproof materials, of course, the quality of the materials determines the level of construction costs. When the exhibition hall is built, the height is limited, and the height limit is generally 6 meters, which will be in the exhibitor's manual.
3: I personally suggest that you don't use too good materials, and general fireproof materials are fine, because those things are all waste products as soon as the exhibition is over. As for the ** aspect, I can reveal the construction cost of Nanjing:
36 square booths, the construction cost of about 18,000 should be able to talk about the guess, for your reference, hehe.
4: If you are exhibiting in other places, it is best to find a local construction company, and if you sign a contract with the construction company, you must indicate: if you work overtime, the exhibition hall will be charged, and the builder will bear it. The cost of overtime in the pavilion is very high.
5: Special management fee, which is handed over to the exhibition hall, can be borne by yourself, or by the construction company, the key depends on how you talk to the construction company, you must talk, if you don't talk, the construction company will ask you for this money. If you bear this part of the cost, you can also entrust the construction company to pay, and let the construction company settle with you with the ticket.
Any charge in the exhibition hall is organically billed. There's also a clearance deposit, which is a matter of building a company, so you don't have to worry about it.
6: The exhibition hall will charge the construction company the cost of the construction permit, which is generally the responsibility of the builder himself, to prevent them from letting you bear the money, generally a worker a construction permit, a construction permit ranging from 5 to 10 yuan (varies from place to place).
7: At the exhibition site, you must rent tables and chairs, LCD or something, directly rent with the builder, they have a complete set of equipment, the things in the exhibition hall are expensive to death, the exhibitor's manual has the pavilion's **, you and the builder's ** compare it to know.
8: The choice of the construction company, as long as they have done the exhibition construction before, this thing has no technical content, all the workers of the construction company are found from the roadside guerrillas. They are the ones who have work and do it there.
9: There is also a distribution box fee, the special booth needs to apply for the distribution box, to the exhibition hall service desk to apply, the special booth electricity in Nanjing is divided into 2 parts: 1:
During the exhibition arrangement, the electricity is erected (300 yuan), 2 electricity is used during the development period (300 yuan), and the electricity consumption during the exhibition can be borne by the builder, and the electricity consumption during the exhibition period should be borne by yourself.
Having said so much, in fact, there are only two pieces, one is the design drawing, the other is the cost, as for the materials or something, the builder knows better than you, you don't have to worry. If he asks you to choose the material, you can choose the average one, or simply choose the cheapest one. For the specific charging items of the exhibition hall, you can see the exhibitor's manual, which is all there.
Writing so much, hehe, I hope it can help you ......
-
First of all, you have to take a look at the exhibitor manual, what special requirements does the organizer have! If all the entry procedures are handed over to the exhibition company, you don't need to get anything, just emphasize that the exhibition company must pay attention to the quality! The procedures to be done by the exhibition company are also to pay money.
To enter the venue, you must pay the construction management fee, the extension of electricity bills, temporary electricity, construction permits, and safety deposits! As long as that's done, you're all set! Hope it helps!
Starbucks is a relatively branded coffee shop, and if you invest in it, it will cost at least about 2 million yuan!
The last time I opened it, it cost 13 bucks.
Just do it with the business tax business license and the like! >>>More
Renovation costs
There is a certain difference between opening a teahouse and a tea shop, the area of opening a teahouse needs to be at least 200 square meters, and the decoration cost is between 100,000 yuan and 150,000 yuan. It should be noted that the decoration of the teahouse should pay special attention to the chic design of the windows, and the lights on the roof should not be too bright, soft and comfortable. The size of the room can be set to 2 people, 4 or 8 people. >>>More
1. Company registration and name check: the time is about 3-5 working days. Materials to be provided: Copies of ID cards of all investors and their respective signatures; More than 3 company names; investment ratio; The main business scope. >>>More