-
In the matter of decoration, I think it is important to listen to the advice of experienced people and not do it blindly, because decoration is not such a small thing on the surface, and there are many details that need to be dealt with.
When I was decorating, it was because I was too arrogant, so after the stay, I found that many small details were not perfect, if we found that the position of the concrete slab on the ground needed to be moved during the renovation, for this case, most craftsmen would choose to re-knock it out and then remake the concrete slab.
This method is time-consuming and labor-intensive, and it also wastes time and money, as a landlord, is the most reluctant to do such a thing, which comes down to the lack of homework done in the early stage, if we have put everything in advance in the hands of the renovation company, then we will definitely not follow his other advice, but must do so, because the waste of work and money has nothing to do with you.
But as ordinary craftsmen, they still have some other small ways to deal with this situation. First of all, make a groove on the concrete, turn it on to the position where the light is moved, and then replace the original wires, or not, but I suggest that if it is your own house, it is better to change it to a better quality.
After all, you get what you pay for. Then take a new one, but it is strongly recommended to change it to avoid the joint is not firm in the future, and there will be leakage or more serious problems, after the line pipe is laid out first, it should also be in place, and after it is done, the line pipe is fixed with cement.
This can solve this problem, but there are also certain drawbacks in it, because it is not very beautiful, and if there is no secondary modification, it is obvious that the traces of changes can be seen.
-
The light position on the bottom of the prestressed concrete slab, to move the position, how to deal with it can make a groove in the invisible place.
-
Concrete cannot be moved unless a lampholder is placed on the side.
-
The lamp position on the bottom of the prestressed concrete slab, if you want to move the position, you can find a professional mechanic to help.
-
The concrete floor slab can be slotted and the lamp position can be moved, and this situation is best handled by a professional.
-
The prestressed concrete slab lamp position, to move the position, to see whether the original lamp hole can be filled.
-
The light position on the bottom of the prestressed concrete slab needs to be moved by a professional machine.
-
The light position on the bottom of the prestressed concrete slab, to move the position, you can only find a professional.
-
The light position on the bottom of the prestressed concrete slab, to move the position, must be operated by professionals.
-
This kind of professional problem is best done by finding professional workers.
-
Then the setting of water and electricity is especially important when decorating. You have to choose the best material for this. Including wires, including water pipes, be sure to choose relatively high-quality materials.
How to plan the socket at home must be thought about, because my home is the socket has not been planned before, so it has not been enough. The main project designer conducts on-site accurate measurement of the house, deepens the layout (customer confirmation), a full set of construction drawings, renderings, project budgets, and deepening PPT plans. The product designer finally completes the product plan, the main material budget table, etc.
The soft decoration designer finally completes the product plan, soft decoration budget table, etc.
The interior decoration of <> residences is generally divided into hard decoration and soft decoration. Hard decoration refers to the transformation and fixed decoration of the interior structure and layout of the house; Soft decoration refers to the arrangement of movable basic functional facilities and decorations in the overall space of the house. The interior decoration is first hard decorated, and the soft decoration handyman is carried out after the hard decoration is completed.
The workers in this part include wall masters, garbage cleaning masters, building materials transportation masters, customized installation masters, cleaning masters and so on. Mason. Masons need to work hard to build walls and plaster after structural renovation.
Regularly and irregularly understand and inspect the progress and quality of the decoration project, find problems and solve them in a timely manner, and do not lay the root cause for subsequent disputes. Before the construction of hydropower renovation, it is necessary to plan it well, communicate with the designer and the person in charge of construction, and ask them to groove according to the straight line (to find the location of the water pipe and line pipe in the later stage), and it is best to accept each item in person (the appearance and acceptance criteria are explained, easy to understand, and the designer can be asked in detail).
If you choose the decoration company decoration, you must pay attention to the signing of the contract is half or full package, payment method, delivery time, material cooperation business, etc., it is generally best to choose half a package, the main material is chosen by yourself, in case the decoration company in the middle of the price difference, more importantly, in order to save the cost of the water pipe at the top of the bathroom, the corner of the standpipe, in the decoration process must do a good job of sound insulation, under normal circumstances, wrap a layer of sound insulation cotton, rest at night will not be woken up by the sound of water upstairs.
-
In such a situation, I think you should reinforce it, and you should also move the position of the lamp, and you should also pay attention to the choice of position.
-
There is a slot in the concrete slab, just move the light position after opening it. But pay attention to safety during the moving process.
-
If the lamp position is to be moved, it is best to hire a special electrician, otherwise it is more dangerous to do it yourself.
-
This should be carried out safely according to the actual needs.
-
The general decoration master knows it, you can't do it yourself, just listen to the professionals.
-
I think I really don't know much about inviting a professional master to get it for you.
-
If you don't know this, you can ask the decorators, they are all very professional.
The strength grade of prestressed concrete should not be lower than C30, and when carbon steel wire, steel strand, and heat-treated steel bars are used as prestressed tendons, the concrete strength grade should not be lower than C40. >>>More
It should be determined according to the relevant indicators of soil structure and soil physical and mechanical properties in the engineering geological data, with reference to the pure pile sinking time. Where there is a sand interlayer, the soil grade should be determined according to the sand layer first. If there is no sand layer, it shall be determined according to the physical and mechanical properties of the soil and refer to the average pure pile sinking time per meter. >>>More
1.The prestressed carbon fiber plate anchor for the original bridge is selected and installed without slotting, which protects the structure and is convenient for construction, saving the cost of labor and slotting materials. >>>More
The strength, fluidity, coagulation time, water leakage, expansion rate, gas content and other properties of the pore grouting slurry should meet the design requirements. When the design is not required, rightPrestressed concreteThe beam shall comply with the following regulations: >>>More
Answer]: c, d
The setting of the tension end of the tendon should meet the design requirements. When the design is not required, the following provisions should be met: curved prestressed tendons or linear prestressed tendons with a length greater than or equal to 25m next to the filial piety stove should be tensioned at both ends; Straight-line prestressed tendons with a length of less than 25m can be tensioned at one end. >>>More