According to the "Regulations on the Supervision and Administration of Fire Protection of Construction Projects", it shall be handled by the construction party.
-
To be handled by the construction, a complete set of construction drawings is required, and the fire protection drawing review application and the company's relevant information are filled. After the review, the fire department will issue a fire protection construction drawing review opinion.
-
Of course, it is handled by the construction unit.
-
For the fire record, the construction shall apply to the fire department for acceptance, and the specific required information:
1. Application Form for Fire Protection Acceptance of Construction Projects
2. The original "Opinion on Fire Protection Design Review of Construction Engineering".
3. Design changes, meeting minutes and other documents approved by the public security and fire protection agencies.
4. Project completion drawings.
5. Copies of relevant materials and purchase and sale contracts of various fire-fighting products.
6. Copies of relevant materials and construction contracts of each fire protection engineering construction unit.
7. Construction records (including concealed engineering acceptance records and relevant test reports) 8. "Technical Inspection Power of Attorney for Automatic Fire Protection Facilities of Construction Projects" and commissioning and testing reports of relevant fire protection facilities.
9. Self-inspection report of the construction unit and the construction unit.
10. There is a fire protection facility inspection report issued by a testing institution with fire protection facility testing qualifications.
Probably these, when testing, it is necessary to check whether the water comes out of the high-rise fire hydrant and whether the range reaches the specified distance; whether the fan can be linked; Whether the standby power supply switching starts in time and so on, anyway, there are some in the architectural design drawings, you have to have them, and the construction has to be standardized.
-
Legal analysis: Renovation projects below 300 square meters do not need fire protection filing, on the contrary, decoration projects above 300 square meters need fire protection filing.
Legal basis: Fire Protection Law of the People's Republic of China
Article 10 For construction projects that need to carry out fire protection design in accordance with the national fire protection technical standards for engineering construction, the fire protection design review and acceptance system for construction projects shall be implemented.
Article 13 The competent department of housing and urban-rural development stipulates that the construction project shall apply for fire protection acceptance for completion, and the construction unit shall apply to the competent department of housing and urban-rural development for fire protection acceptance. For other construction projects other than those provided for in the preceding paragraph, the construction unit shall, after acceptance, report to the competent department of housing and urban-rural development for the record, and the competent department of housing and urban-rural development shall conduct spot checks. Construction projects that shall be subject to fire protection acceptance in accordance with the law are prohibited from being put into use if they have not been accepted for fire protection or are unqualified for fire protection acceptance; If other construction projects fail to pass random inspections in accordance with law, they shall be stopped.
-
The project is returned to Huai for the record, which is handled by the construction unit. The construction contract is a contract between the employer and the contractor to clarify the relationship of mutual rights and obligations in order to complete the agreed construction and installation project. Within 7 days of signing a written contract, the winning bidder shall send the contract to the construction administrative department at or above the county level for the record.
-
The construction contract is required for the filing of the project fire protection; The following materials are required to apply for contract filing:
1. "Construction Contract Filing Form" (4 originals are collected, and this form should be collected at the window of the government affairs center).
2. All "Construction Contracts";
3. Provide no less than 2 copies of the original and duplicate of the construction contract, retain 1 copy, and recommend the signing of the construction contract using a unified format of the model text), bidding documents and bidding control price and electronic data, (including the standard text of the bidding documents and the bidding control price stamped with the official seal of the bridge lease unit 1 copy and 1 electronic data in the form of electronic data).
4. The commercial bid and the winning bid price and electronic data of the winning bidder (including 1 copy of the commercial bid and the winning bid price stamped with the official seal of the applicant and 1 copy of the electronic ** form data).
5. The project budget confirmed by both parties (1 copy of the project budget stamped with the official seal of the applicant and 1 copy of electronic data in electronic form).
6. For the implementation of the guarantee project, the guarantee letter of both parties shall be submitted; (Check the original, receive 1 copy of the official seal of the unit and 1 copy of electronic data in electronic ** form).
7. Power of attorney of the legal representative (1 original copy will be collected).
8. Contact Form for Handling Construction and Management Procedures (check the original, and receive 1 copy stamped with the official seal of the applicant unit).
9. Notice of winning the bid (1 copy of the official seal of the applicant will be received).
Note: 1. The bidding project does not provide the information in item 5.
2. The project that does not carry out bidding according to law does not submit the project information;
3. The project that does not try to guarantee does not submit the information in item 6;
4. The legal representative does not submit the information in item 7 when signing the contract.
5. The electronic data here needs to be engraved and handed in.
1. What is the filing process of construction project contracts?
The law has specific provisions on the filing of construction contracts, and Article 47 of the Administrative Measures for Bidding and Bidding for the Construction of Housing Construction and Municipal Infrastructure Projects stipulates: "Within 7 days of signing a written contract, the winning bidder shall send the contract to the local people's construction administrative department at or above the county level where the project is located for the record." It can be seen from this that there is a time limit for the filing of construction contracts, and it must be filed with the designated department within 7 days.
The ICP filing process includes the following:
1. Online declaration. First of all, the contractor logs in to the portal, and then declares the contract online in the construction project contract filing management information system, fills in the relevant information in the corresponding contract filing form according to the specific nature and content of the contract, and prints out the contract filing form with a barcode.
2. Go through the filing procedures. The parties to the contract shall bring the relevant materials to the contract filing management agency to go through the contract filing formalities.
3. Formally issue the contract filing form. The filing agency shall review the contract filing materials provided by the parties to the contract, and if it meets the requirements, it shall affix a special seal for the filing of the contract.
Before a public gathering place is put into use or opened, its owner shall report to the public security and fire protection agency for fire safety inspection in accordance with the law, and shall submit the Application Form for Fire Safety Inspection, the Opinion on Fire Protection Design Review of Construction Projects, the Fire Protection Acceptance Opinion for Construction Projects, the fire safety management system and other relevant materials at the same time. From the date of acceptance, the personnel of the public security and fire department shall conduct an on-site inspection within four working days, and make and deliver the "Fire Safety Inspection Opinion" within three working days from the date of inspection, and agree to put it into use or open for business if it meets the fire safety conditions; If it does not meet the fire safety conditions, it will put forward rectification opinions, and the owner shall rectify it according to the requirements of the "Fire Safety Inspection Opinion" until it meets the fire safety conditions and can be put into use or opened only after passing the inspection by the fire protection agency. (Fu Dongjun).
Contact your local fire brigade.