What procedures are required for fire protection installation, and what certificates are required fo

Updated on society 2024-02-22
2 answers
  1. Anonymous users2024-02-06

    Before a public gathering place is put into use or opened, its owner shall report to the public security and fire protection agency for fire safety inspection in accordance with the law, and shall submit the Application Form for Fire Safety Inspection, the Opinion on Fire Protection Design Review of Construction Projects, the Fire Protection Acceptance Opinion for Construction Projects, the fire safety management system and other relevant materials at the same time. From the date of acceptance, the personnel of the public security and fire department shall conduct an on-site inspection within four working days, and make and deliver the "Fire Safety Inspection Opinion" within three working days from the date of inspection, and agree to put it into use or open for business if it meets the fire safety conditions; If it does not meet the fire safety conditions, it will put forward rectification opinions, and the owner shall rectify it according to the requirements of the "Fire Safety Inspection Opinion" until it meets the fire safety conditions and can be put into use or opened only after passing the inspection by the fire protection agency. (Fu Dongjun).

  2. Anonymous users2024-02-05

    Qualification standards for professional contracting of fire-fighting facilities engineering.

    The professional contracting qualification of fire protection facilities engineering is divided into level 1 and level 2.

    Level 1 Qualification Standards:

    1. Enterprise assets.

    Net assets of more than 10 million yuan.

    2. The main personnel of the enterprise (1) There shall be no less than 5 first-class registered constructors in mechanical and electrical engineering.

    2) The technical person in charge has more than 10 years of experience in the construction technology management of fire protection facilities engineering, and has the senior title of Liang Yu in the engineering sequence; There are no less than 10 personnel with intermediate titles or above in HVAC, water supply and drainage, electrical, automation and other majors, and the majors are complete.

    3) There are no less than 20 construction site management personnel with post certificates, and the construction personnel, quality personnel, closed letter safety officers, material personnel, data personnel and other personnel are complete.

    4) There are no less than 30 skilled workers above the intermediate level who have passed the assessment or training.

    3. Enterprise engineering performance.

    In the past 5 years, he has undertaken the construction of 2 fire-fighting facilities projects with a single construction area of more than 40,000 square meters (each project includes automatic fire alarm system, automatic fire extinguishing system and smoke prevention and exhaust system), and the quality of the project is qualified.

    Can be linked or v, a 5 bi

    Related questions
    9 answers2024-02-22

    How to use the fire extinguisher and precautions How to use the fire extinguisher and precautions. >>>More

    14 answers2024-02-22

    A first-class fire engineer has requirements in terms of academic qualifications and working years, and there is no restriction on the major. >>>More

    9 answers2024-02-22

    The annual inspection within 6 years can be handled by going to the vehicle management office or the traffic police brigade. The original driving license, a copy of the compulsory traffic insurance, and the original ID card are required. After bringing the materials, fill in the application form for motor vehicle inspection marking.

    7 answers2024-02-22

    The procedures and procedures required for private real estate transactions are as follows: >>>More

    4 answers2024-02-22

    First of all, you need to get your passport. Bring your household registration booklet, ID card, and 2 2-inch white backgrounds**, and go to the Citizen Exit and Entry Administration Office of the Public Security Bureau where your household registration is located, which is very convenient. After the passport is processed, you need to apply for a South African visa, which you can find a professional agency, such as a travel agency. >>>More