-
Processing 600 * 2 = 12 million in two days.
A total of 20 million pieces were processed.
-
600 2 = 1200, 6 million more processed per day, 12 million more processed in 2 days, 5-2 = 3, this 12 million is equivalent to the original 3 days of work, 1200 3 5 = 2000, a total of 20 million processing.
-
Solution: The plan is to process x 10,000 per day.
5×x=(x+600)×2
5x=2x+1200
5x-2x=1200
3x=1200
x=1200÷3
x = 400 to be processed in total: 400 5 = 20 million.
A: A total of 20 million pieces will be processed.
-
An additional 6 million per day will process an additional 600 212 million per day, so the original plan was to process 1200 (5-2) 4 million per day, for a total of 400 520 million.
-
The original plan was to process y0,000 per day, according to the title:
5y=(y+600)x2, solution, y=400 (10,000).
A total of 5x400 = 2000 (10,000 units).
A: A total of 20 million pieces were processed.
-
120*8=960 (pcs)
960 6 = 160 (pcs).
An average of 160 pieces are processed per day.
-
Summary. Hello, 252 were processed on the first day, and 48 more were processed on the second day than on the first day, how many were processed in two days? The specific calculation process is as follows:
252 were processed on the first day, 48 more on the second day than on the first day, how many were processed in two days?
Hello, 252 were processed on the first day, and 48 more were processed on the second day than on the first day, how many were processed in two days? The specific calculation process is as follows:
252 + 252 + 48 = 552 pcs.
So a total of 552 pieces were processed in two days.
-
750 pieces per day, 15 days planned, so 750 * 15 = 11250 parts are planned, and 750 + 25 = 775 parts are actually processed per day, and it actually takes 11250 775 days.
If your problem description is correct, this is the result of the above.
-
According to the title, it is known that a production team processes 750 parts per day, which is planned to be completed in 15 days, but it is actually 25 more than the original plan. Therefore, you need to find out how many days it actually takes, and the detailed operation is as follows:
75 15 = 5 (days).
-
Wrong. There are a total of 750 parts 15 = 11250 pcs.
The actual number of parts processed per day is 750 + 25 = 775.
The actual number of days used is 11250 775 = days.
-
There are a total of 600x10=6000 pieces, and the actual processing is every day, so it takes 6000 750 = 8 days.
-
The total number of parts to be machined = 150 * 20 = 3000.
Actual number of processed units per day = 150 * (1 + 1 3) = 200 pcs.
Actual processing days = total number of parts to be processed Actual number of processing units per day = 3000 200 = 15 days.
-
Hello princess with bells:
Solution: It can be completed in X days.
20:x=(150+150×1/3):150200x=3000
x=15
-
It can be done in x days.
150×(1+1/3)x=150×20
4/3x20
x=15
-
Solution: Let the actual number of days be less than the actual 14-x days because the total amount of processing is the same, so the equation can be listed.
14-x)*2100=14*1500x=4
-
The actual processing is x days less than planned.
14×1500=(14-x)×2100
x=4I hope it can help you,@数学辅导团 I wish you progress in your studies, please ask if you don't understand, please be timely if you understand! (*
Here's how to plan your vacation:
1. First of all, the principle of spring rent according to the importance of the planned item. More time is allocated for important planning items, and less time is allocated for vice versa. Second, plan the time you have at your disposal and ignore the time you don't. >>>More
The glass cup is a cup made of glass, usually the raw material is borosilicate glass, which is fired at a high temperature of more than 600 degrees, which is a new type of environmentally friendly teacup, which is more and more favored by people. >>>More
Study plan for the new semester.
No one is perfect" is the idiom that works best for me. The teacher asks us to follow 13 good study habits, such as: being willing to read outside of class, being diligent in reading aloud and memorizing ......I've done a good job, but my other bad habit is that I don't do enough to have the right reading and writing posture. >>>More
Gear hobbing machine (gearhobbingmachine) is the most widely used machine tool in gear processing machine tools, on the gear hobbing machine can cut spur teeth, helical cylindrical gears, worm gears, sprockets, etc. A gear processing machine for processing spur, helical and herringbone cylindrical gears and worm gears by the hob method. [Click to get real-time from the manufacturer**]. >>>More
Afternoon processing is considered as unit 1
210 (2+1 4) = 280 3 (kg). >>>More