  1. Anonymous users2024-02-08

    This is divided into what kind of quality inspector you are, and it should be divided into: incoming inspection, process inspection, and shipment inspection.

    1. Incoming inspection.

    The most important thing is to see the size of the paper. The key is to grasp the installation size, that is, the important, critical size. At the same time, it is necessary to complete the record and keep it for reference within 3 years.

    If you want a shortcut, write down the wrong size and check the corresponding size later. Also, it is important to pay attention to which standard the company inspects the material, and the appearance is sometimes quite important

    2. Process inspection.

    The main thing is to guide and monitor the production process in the workshop. What must be done is the first inspection record, and some companies also do the final inspection. Also, to complete the inspection record, remember that you don't stay on site 8 hours a day.

    It's a patrol. There should be a rule on how much time to check the company or department. Of course, after discovering the problem, you can't solve it yourself, it's better to find a leader:

    3. Shipment inspection.

    This one is easier. However, pay attention to the location and time of shipment, and complete the shipment report. Some companies need to keep a record of all the products that go out** (traceability labels) for reference.

    Generally, the shipment inspection also has to bear a problem, that is, the record of customer returns.

    Of course, I also have to complete other tasks arranged by the leader, hehe!

    In my experience, it seems like that's all. I can't remember anything else. Let someone else supplement it for you

  2. Anonymous users2024-02-07

    To put it simply, the most important duty of a mechanical inspector is patience and responsibility! Of course, the mechanical inspector must be familiar with various measuring instruments such as inner diameter, outer diameter, depth, height, angle, r-degree, etc. Will look at the drawings.

    It would be even better if you could also use some simple programming or CAD and other drawing software.

    The two most important points for inspectors:

    1.Test skills – the ability to spot problems. In addition to reducing the missed detection rate, it is also necessary to be sensitive to anomalies and some less obvious defects on the production line.

    2.Communication skills – the ability to report problems. For the QC supervisor, one of the most important qualities of the inspector is "can only block but not put", but although he must be selfless, he must learn to do a good job in the communication of the production line, not let defective products or risky products flow out, and supervise the production line to do a good job in product isolation and timely processing.

  3. Anonymous users2024-02-06

    First of all, it is necessary to read drawings, be familiar with tolerances, be proficient in the use of measuring tools, and have the ability to find problems and communicate in time.

  4. Anonymous users2024-02-05

    1. Methods for dimensional inspection of related products;

    2. The use of measuring tools;

    3. Identification of drawings;

    What kind of test do you do?

  5. Anonymous users2024-02-04

    will use micrometers, vernier calipers, depth gauges, these east.

  6. Anonymous users2024-02-03

    Summary. The operator reworks the defective product inspected by the inspector. This is 1, the unqualified products into the unqualified area, by the team leader (supervisor), quality inspectors jointly review and determine the need to rework the process, rework methods (including rework, repair, point return), when the review can not be determined, timely report for re-review;

    The operator reworks the defective product inspected by the inspector. What is it.

    The operator reworks the defective product inspected by the inspector. This macro is 1, unqualified products into the unqualified area, by the team leader (supervisor), quality inspection group inspectors jointly review and determine the need to rework process, rework methods (including rework, repair, point return), when the review can not be determined, timely report for re-screening review;

    2. The quality administrator of the quality inspection department is responsible for passing the unqualified products to the factory director of the production code. 3. The inspectors of the quality inspection department are responsible for monitoring the quality of the rework process and re-inspecting and confirming the finished products after rework.

    The inspector is responsible for the quality and control of the product quality of the injection molding process according to the order requirements or the corresponding process documents. Sampling inspection is responsible for the comprehensive inspection of the injection molding products on duty before the bridge is put into storage, and if there are any doubts and disputes during the inspection, they must be coordinated and handled by the superior.

  7. Anonymous users2024-02-02

    Dear, I am glad to answer for you After completing the process inspection, the inspection personnel should carry out the following work: 1Record the test results:

    The inspector shall accurately record the inspection results, including the number of qualified products, the number of nonconforming products, and the description of undesirable phenomena. 2.Analysis of the causes of defects:

    The inspector shall maintain and maintain the inspection equipment used to ensure the accuracy and reliability of the equipment. 5.Improving the process:

    Through the analysis of inspection results and the causes of defects, inspectors can make recommendations to improve the process flow to optimize the production process and improve product quality. 

  8. Anonymous users2024-02-01

    Answer]: B construction machinery must go through safety inspection, and only those who pass the inspection can be used. Therefore, choose B.

  9. Anonymous users2024-01-31

    The "three inspection system" method of the first article inspection refers to the self-inspection by the operator first, and then re-inspection by the team leader or quality officer, and finally the special inspection by the inspector.

    The first article inspection operator does not need to self-check, and the quality inspector will go to the operation station for inspection after the inspection, right?

    Hello dear is very happy to serve you, thank you for your poor waiting. The first piece of inspection does not need to be self-inspected, and the quality inspector will inspect it at the station after the inspection, which is incorrect. The "three inspection system" method of the first article inspection refers to the self-inspection by the operator first, and then re-inspection by the team leader or quality officer, and finally the special inspection by the inspector.

    1. The inspection of the first or first few products processed by the production line at the beginning of each shift or after the process is changed. The number of inspections can be formulated according to the requirements of different enterprises or customers. 2. Generally speaking, it is necessary to inspect at least 3-5 products of Tuan Zhaonian continuously produced, and only after passing the test can the follow-up products be processed.

    3. In the event of any change in the equipment or manufacturing process, as well as before the start of processing in each work shift, the first article inspection must be strictly carried out.

    I hope mine is helpful to you, I wish you a happy life, everything goes well, smile often, be happy every day, and be happy every day.

  10. Anonymous users2024-01-30

    Hello! In order to improve and maintain the original performance of mechanical equipment, through the five senses of human beings (sight, hearing, smell, smell, smell, touch) or with the help of vertical slag tools and instruments, in accordance with the pre-set weekly cleaning period and method, the specified parts (points) on the equipment are preventively and carefully inspected for abnormality, so that the hidden dangers and defects of the equipment can be early detection, early prevention, and early treatment, and such equipment inspection is called spot inspection.

    Hope it helps!

  11. Anonymous users2024-01-29

    There are many types of mechanical inspections, including hydraulic systems, electrical systems, transmission systems, and braking systems, ......The quantities required for daily life are as follows: theodolite (perpendicularity detection), level (horizontality), rotation meter (span, parallelism), meter ruler, angle ruler, micrometer, vernier caliper (length); Multimeter, shake meter (electrical detection).

    In daily life, these are enough, the hydraulic system is not professional and difficult to detect, and can only be visually inspected for oil temperature and oil quality.

    Routine maintenance is based on experience, and the key is to detect anomalies before they fail.

  12. Anonymous users2024-01-28

    Calipers, micrometers, depth gauges, deflection meters. The inspection of the machinery manufacturing industry is basically these things. Maintenance is all about rust prevention and correction.

Related questions
8 answers2024-04-30

1) Familiar with the drawings, according to the standards and process requirements, correctly grasp and understand each process. >>>More

7 answers2024-04-30

Check the loose thickness when paving, cement dose, compaction times, compaction degree, loose paving thickness with a ruler, on-site measurement, according to the test section to determine the loose thickness, cement dosage with EDTA titration (specification JTGE51-2009 has a method), the other 2 needless to say, it's too simple.

5 answers2024-04-30

Generally, choose a big brand, the quality of workmanship and materials should be paid attention to, in one is to look at the power performance parameters, generally based on the rated power, do not look at the peak power, the peak power is used by deception. If you are studying the details, it is to increase the voltage with the measurement data, which is very laborious, mainly to see whether 170V-240V can be normal enough to stabilize the voltage of the computer. Now the broadband voltage can reach 140V-240V can be tested, but you need the help of instruments.

7 answers2024-04-30

This is a very tricky problem, which was originally intended to be overhauled, and as a result, there was a quality accident. >>>More

7 answers2024-04-30

It is recommended to use volko, and then wear the lanolin thread. Try to buy a light pat, easy to use.