How is the decoration construction managed from entering to leaving?

Updated on home 2024-04-03
22 answers
  1. Anonymous users2024-02-07

    According to the construction contract: First, review whether the stoppage order is correct and whether the reason for the stoppage is sufficient and correct. Secondly, whether there is a contractual basis for the withdrawal and whether Party B breaches the contract or violates the provisions of the Construction Law.

    No matter who proposes to terminate or rescind the contract, both parties must have a contractual or legal basis! If you terminate a contract if there is no contract or legal basis, you will be liable for breach of contract or compensation. When the construction contract is terminated, both parties shall confirm the quantity of the project, as well as the confirmation of the project payment, payment method and time.

    In addition, it is necessary to make an agreement on the aftermath of the construction site, such as the disposal of construction materials.

    The construction sequence of the renovation works is:Building Structure Renovation Water and Electricity Wiring Waterproofing Engineering Tile Paving Carpentry Production Wood Painting Wall Finishing Floor Paving Water and Electricity Installation Equipment Installation Pollution Control Sanitation and Cleaning. When formulating specific construction procedures, attention should usually be paid to the principle of shortening the construction period, the protection of finished products and the safety of reasonable overall arrangements.

    Here are some of the design and construction issues that often arise during the construction process.

    Generally speaking, the admission procedures require the original and copy of the ID card of the person in charge of the decoration team, the original and copy of the owner's ID card, the copy of the business license of the decoration company, the copy of the construction permit of the decoration company, and the decoration deposit.

    Second, the next step is to knock on the wall. Before designing, it is necessary to grasp the load-bearing structure of the building, and distinguish between the demolivable part and the non-demolivable part. Under normal circumstances, in the community that implements unified property management, in addition to the load-bearing walls and columns of the building, all building components that affect the appearance of the building shall not be changed, such as windows, balconies, etc.

    The calculation of the knock area can be done according to the floor plan drawings of the house, which have all the detailed various data about the house. Remember to measure the area of the wall before knocking on the wall, and know that the price of knocking on the wall is calculated according to the area.

    3. After knocking on the wallThe garbage has been cleaned up, and the plasterers should be in the field. Plasterers are mainly responsible for building walls, plastering, sporadic repairs, tiling, waterproofing, ground leveling, and installing floor drains.

    Pay attention to interior decoration pollution. In China's current situation, almost every decoration is polluted. Let's not have a fluke mentality, don't think that by opening windows for ventilation and raising green plants can control decoration pollution, if that's the case, those large enterprises that produce pollution control products must not starve to death.

    Pollution is long-term and the harm is huge and hiddenEspecially families who are planning to have a baby and families with pregnant women or children should pay more attention not to leave lifelong regrets in the future! Qualified families must carry out the necessary pollution prevention in the decoration process, and choose powerful enterprises or reliable quality products for necessary air quality testing after decoration and before moving in.

  2. Anonymous users2024-02-06

    From entering to exiting, it should be simple and complex. Finally, the floor is laid and exited.

  3. Anonymous users2024-02-05

    From the entry to the exit of the renovation work, I think it is necessary to choose a more stable person to supervise the work, but in general, it is not necessary. People are more conscious.

    The manager must be a responsive person. If there is a problem with his work, superiors and subordinates, the cause must be identified in time and dealt with immediately. Always "yes" or "no" to others.

    Only with a fast reaction can we get ahead of others. As a business, especially a manager of a sales business, marketing is a big deal. Even a seemingly small problem can be mishandled and can cause major disasters, such as delivery problems, timely response to product problems, urgent need for formulation adjustments, etc.

    When there is a contradiction, as a manager, we must first deal with the external contradictions, that is, we must first ensure customer satisfaction, and secondly, we must deal with the internal contradictions and give priority to them, so as to reduce the ideological burden and psychological pressure of our subordinates and let them travel lightly. When your subordinates ask questions, start by asking them to come up with at least three solutions and repeatedly prove which one is more appropriate. Finally, it is up to the manager to guide and make their own suggestions, enabling the subordinate to improve faster.

    Why can we be managers? Because we know more than our subordinates, have strong understanding, think more comprehensively, think more from the company's point of view, and better grasp the direction. For example, a regional manager should first be familiar with the company's policies, sales system and performance calculation methods.

    You don't know how to teach your subordinates? Know how to analyze the market, do a good job in product positioning, and know how to formulate sales ideas and sales plans in the region.

    It makes the communication of information more authentic, so that the company can make appropriate strategic planning, and employees can better understand and implement the company's practices.

  4. Anonymous users2024-02-04

    This professional will definitely know and they will do the job well, don't worry.

  5. Anonymous users2024-02-03

    They have special management methods, as well as special tools for renovation, so don't worry about that.

  6. Anonymous users2024-02-02

    General decoration of those that do not affect the movement, and finally start to install tiles.

  7. Anonymous users2024-02-01

    Of course, it is to enter the punch card first to send a hard hat, and then come out and punch in again, and collect the hat record.

  8. Anonymous users2024-01-31

    I think it is necessary to choose a more secure person to supervise the work, but under normal circumstances, it is not necessary, and the current workers will be more conscious.

  9. Anonymous users2024-01-30

    Decoration construction generally starts from the innermost part of the construction, and then slowly goes outward.

  10. Anonymous users2024-01-29

    It should be that each place has a special person to supervise, so there is no need for us to worry.

  11. Anonymous users2024-01-28

    I think this has a special management agency, so as to keep the decoration perfect to the greatest extent.

  12. Anonymous users2024-01-27

    Acceptance of the completed part. Count the amount of work that has been completed. Settlement is made in accordance with the contract**.

  13. Anonymous users2024-01-26

    Why did you quit halfway? If there is no justifiable reason, it is purely a breach of contract or even an illegal act, and if the loss has been caused, it is required to compensate in full.

  14. Anonymous users2024-01-25

    That's easy to do, you can do whatever you want, sister.

  15. Anonymous users2024-01-24

    Reinforcing worker: The advanced field can be withdrawn from the foundation until the main structure is completed.

    Formwork: In the case of pile foundation, you can wait for the foundation earthwork excavation before entering the site.

    Concrete: from the time when the project involves the use of concrete, it begins to enter the site, and the interior floor and ground are completed in the decoration stage.

    Bricklayer: If it's a contractor, then you won't leave the site from the beginning of the project until the end of the project.

    Scaffolding: If you need shelf equipment, then the foundation will enter the site at the beginning, otherwise it will enter the site after the first floor plan, and the shelf will be dismantled and withdrawn at the end of the exterior wall decoration stage.

    Plasterer = Bricklayer's decoration stage name: come when you need to plaster, and leave when plastering is over.

    Carpentry = formwork.

  16. Anonymous users2024-01-23

    Isn't it reflected in your contract? If not, according to the statutory **, thirty percent. However, most renovation contracts are 10 percent.

  17. Anonymous users2024-01-22

    I think you have the liability for breach of contract in your decoration contract. You can mediate the price increase of the project manager through the decoration company, because on our side of Qicai.com, the supervision is not allowed to have such an over-budget.

  18. Anonymous users2024-01-21

    If Party A does not breach the contract, and the construction unit terminates the contract without authorization

    If there is an agreement in the contract between the two parties, the construction party may be required to bear the liability for breach of contract and compensate for losses in accordance with the contract.

    If there is no agreement in the contract, it is recommended to calculate the amount of loss, provide evidence of loss, and require the construction party to compensate for the loss.

  19. Anonymous users2024-01-20

    Do you have to find someone else to do it after you leave? Doesn't it take time to find someone else to do it, which is a waste of time, and if the project is done like this, others will not take this job. Even if you retreat, others will take it, in case there are problems here and there after the project is completed, who do you find to be responsible?

    Is it the front or the back approach? The front will say that it is the problem of the back, and the latter will say that it is the problem of the front, and no one can say clearly, and it is you who suffers. What can be done now is to make the current project to seize the time.

    Besides, the decoration to the back is latex paint or installation engineering, if it is a half package, then the money that people should make has been earned, and there is no money in the back project. If the whole package involves the floor or something, although the construction period is delayed, it is impossible for people to terminate the contract with you so quickly. To put it bluntly, you are an uncle before the renovation, and they are the uncle after the renovation.

    You can see the specific situation yourself.

  20. Anonymous users2024-01-19

    You can return a little, but you can't return all of them.

  21. Anonymous users2024-01-18

    At present, the Construction Committee does not have a corresponding exit contract, and you need to draft it yourself according to your actual situation.

  22. Anonymous users2024-01-17

    You can take the contract and ask the company to compensate you, because the construction period, construction quality, etc., the state only has decoration demonstration standards, as for the exit agreement, there is none.

Related questions
11 answers2024-04-03

The site does not meet the construction requirements.

18 answers2024-04-03

After buying a house, many people have to start renovating it soon so that they can move in as soon as possible. The basic process or stages of renovation is relatively complex, and the main body demolition is the signal for the start of decoration, and the project includes removing walls, building walls, shoveling walls, removing heating, replacing plastic windows, etc. There is no way back for hydroelectric power decoration! >>>More

4 answers2024-04-03

1. The electricity used on the construction site shall comply with the provisions of the "Technical Code for Temporary Electricity Safety on the Construction Site" (JGJ 46-2003). >>>More

3 answers2024-04-03

When decorating, the order of the main material needs to be carried out in accordance with the decoration process. First of all, it is usually the water and electricity renovation materials, including wires, switches and sockets, water pipes, etc., which are the work that needs to be completed after the wall renovation and before the wall treatment. Secondly, it is waterproof materials, such as waterproof coatings, waterproof tapes, etc., which are mainly used in toilets, kitchens and other areas that need to be waterproof. >>>More

7 answers2024-04-03

After the pile head is broken, the pile test and inspection should be carried out, and the cushion cap cushion should be poured after qualification, and then the formwork should be installed with steel bars, and the cushion cap concrete should be poured. There is a 'brick enclosure' that may be a side formwork for the cushion cap.