How much does an apprentice plumber pay I worked as a plumber for two months now

Updated on society 2024-04-28
6 answers
  1. Anonymous users2024-02-08

    Novice water and electricity installation now has a daily salary of at least 100 yuan, and a large worker salary of about 200 yuan per day, which is more reliable. The technology is very good, and the salary of the class will be higher, which can only give you a reference, depending on the region, there are differences in different regions, and the difference is not very big in general. How much money you can get a day depends on the talk you talk to your boss, but also depends on the technology, your workload, and your luck.

  2. Anonymous users2024-02-07

    In most people's concepts, there will be some misunderstandings about the income of hydropower installation apprentices, which will also lead to a certain misunderstanding of income.

    First: Hydropower apprentices and plumber workers are often mixed together. At present, the income of a small worker is around 2 0 0 a day.

    Therefore, many apprentices and masters also want to have an income of more than 2 0 0 as soon as they enter the industry. In the end, I made myself a small worker. There is no progress in 1 year of study.

    Second: Hydropower apprentices enter the industry and learn from the master mainly to learn technology. Strive to learn the technology in 2-3 months, which is the beginning of your money. You don't know anything, the salary that the master can give you, that is, tens to more than 1 0 0 points. None of this is the point.

    Third: The point is that the master takes you without profit. He won't teach you by heart. Whether you study for half a year or 1 year depends on how much he pays you.

    Fourth:The income of hydropower apprentices in caliper hydropower practical operation technology is generally between 10 0 - 1 5 0, according to the current decoration**, every year. It's been almost 2 months, and I'll do it all by myself

    Helpful to you, hope and like

  3. Anonymous users2024-02-06

    Summary. Hello dear, it is tiring to go to the construction site to do a hydropower apprenticeship. The first is the plumber apprentice on the construction site, and the second is the decoration plumber apprentice.

    Even though they were both apprentices, what they did was more than 10 times different from what they finally achieved. The first kind of construction plumber apprentice, at the beginning of the work is a small worker, I think it is to learn hydropower technology, but I don't know, the boss is to do manual work, make money small workers, go for half a year, so to speak, even the edge can not be touched. Because no master is obligated to teach you.

    Is it tiring to go to the construction site to do a hydropower apprenticeship.

    Hello dear, it is tiring to go to the construction site to do a hydropower apprenticeship. The first is the plumber apprentice on the construction site, and the second is the decoration plumber apprentice. Even though they were both apprentices, what they did was more than 10 times different from what they finally achieved.

    The first kind of construction plumber apprentice, at the beginning of the work is a small worker, I think it is to learn hydropower technology, but I don't know, the boss is to do manual work, make money small workers, go for half a year, so to speak, even the edge can not be touched. Because no master is obligated to teach you.

    The second kind of decoration plumber apprentice, at the beginning with a good mix of masters, you will do the embedding box, pull the thread, cleaning, but it is a relatively easy thing. It was also a pleasure to learn. If you follow a master who is not well mixed, you will start with grooving, and this job will make most of the apprentices who have just started to do it tired enough, unable to persevere, and choose to give up.

    Slotting is done by professional masters, most of the hydropower masters can't stand it, this has nothing to do with your own ability) Don't follow this kind of master, just find another master, this previous article also has a detailed talk about finding a master. The general working time is 8-9 hours.

    It's too tiring to be a construction site water and electricity apprentice.

    What should I do if I can't hold on to learning plumbers on the construction site.

    Plumber apprentice, if you feel tired and can't persevere, there are several reasons, and it has little to do with you First: you chose the wrong master, the first day you went to learn, the master let you slot, the job of slotting is done by professional people, we are all contracted out, your master wants to earn this money, so let you do it. It's normal for you to be tired, so find another master.

    Second: You entered the industry as a small worker, and did not apprentice with the master, and as a result, the boss arranged all the work for you as a small worker. It's all physical work, and it's so tiring that you can't do it.

    Third: You don't have a clear plan for the time and future development of hydropower technology, and you come to learn hydropower as soon as your head is hot. Therefore, any difficulty is a very big obstacle for you.

    There are also things to pay attention to, and it's all up to you to figure it out. Your heart is tired. Fifth:

    Apprentices in the practical operation of caliper plumbers generally learn almost everything in 2 months, and they take over the work themselves, and they don't slot. The master also talks about experience.

  4. Anonymous users2024-02-05

    1. Pipe slotting.

    When installing hydropower, the first thing is to need pipe slotting, which includes two aspects, one is water pipe slotting, and the other is wire line slotting. When the pipeline is slotted, it is best for the owner to check the quality on site to ensure that the horizontal and vertical lines are played before slotting, and the construction is carried out according to the line.

    2. Water pipeline installation.

    The installation of water pipes in hydropower installation is very important, most of the water pipe materials are PPR pipes, aluminum-plastic pipes, and the installation of water pipes should also pay attention to the placement of faucets, and the owners had better supervise and observe in person, so as to ensure its practicability.

    3. Wire wiring.

    Wires are a key material in hydropower installation, and the common wires on the market have copper core wires of more than square meters. When installing wires, it is necessary to separate the strong and weak currents, switches, air conditioning sockets and electrical sockets, so that the panel installation at the back will be smoother.

    4. Water pipe inspection.

    After the construction is completed, it is necessary to carefully check whether there are quality problems in the water pipes, so that the potential safety hazards of the waterways can be eliminated. When inspecting, you can use the method of pressure test, first use the gambling head to bet all the mouths to death, test the water with a pressure gauge, check all pipes and all joints after the pressure, and if there is no water leakage, it means that the water pipe installation is qualified.

    What to pay attention to in the installation of water and electricity.

    1. When designing the waterway, you should first think about all the equipment related to water, such as water heaters, water purifiers, washing machines, toilets and wash basins, etc., and think about the installation location, method and whether you need hot water.

    2. In addition to the water outlets such as wash basins, cloth pools, and clothes machines, it is best to install a faucet in the bathroom to facilitate the connection of water and flushing the ground in the future.

    3. It is best to have the property present when conducting the suppression test, so as to play a supervisory role and avoid some decoration teams from deceiving the owners. The method of pressure is to open the "return valve" of the pressure pump to form a circuit to see if there is pressure in the tube, especially for the electric pressure pump, we should pay more attention.

    4. After the waterway is installed, it is necessary to pay attention to check whether the waterway in each place is kept unblocked, such as: whether each drain outlet of the faucet such as kitchen, bathroom, balcony is unobstructed. If you find that the drainage is slow or poor, you should get the property unblocked in time.

  5. Anonymous users2024-02-04

    Now in this era, the lowest 100 go out and work all day. There is no hard work and there is fatigue.

  6. Anonymous users2024-02-03

    According to the ** hydropower installation apprentice in Guangdong, it is = the initial 70 yuan, and after a period of time, it is a middle worker, and the salary is 100 yuan - 150 yuan.

Related questions