How long can the fan be hoisted and on what basis

Updated on healthy 2024-04-08
14 answers
  1. Anonymous users2024-02-07

    You're talking about the basis of the wind turbine, right?

    The foundation generally takes 7 days for civil health care. If the weather is good, it will take about 3 days.

    The basis is that civil concrete has strength specifications.

    For example, for large-scale fan installation, the foundation strength must reach more than 70%.

    If the weather is good, you should wait at least 3 days, and if you have a large wind turbine, it is better to be more safe for 7 days.

    A small fan for 3 days is enough.

  2. Anonymous users2024-02-06

    1.The foundation generally takes 7 days for civil health care. If the weather is good, it can be about 3 days for a small one, and if you are a large fan, it is best to be more safe for 7 days.

    2.The basis is that civil concrete has strength specifications, such as the installation of large fans, the foundation strength must reach more than 70%.

  3. Anonymous users2024-02-05

    The foundation of general civil engineering and health care takes seven days. The weather is good for h8ua for about 3 days. The basis is that there are strength specifications for civil engineering mixed soil.

  4. Anonymous users2024-02-04

    30 minutes, plant think to feed feed feed ask Weifang top wear.

  5. Anonymous users2024-02-03

    Won't do anything to resurrect haha.

  6. Anonymous users2024-02-02

    I don't know what basis I'm going up there and collecting it.

  7. Anonymous users2024-02-01

    Actually, I don't know, for your own good, I can't decide.

  8. Anonymous users2024-01-31

    If the concrete does not reach 75% of the design by 28 days, then there is really a problem with the concrete, and the general temperature can reach 80% of the design in 7 days

  9. Anonymous users2024-01-30

    If it does not include construction positioning and pay-off, earthwork excavation, equipment entry and exit, and material reversal, up to 1200 t. of reinforcement70 formwork, 50 cubic meters of concrete, 7000 foundation rings.

  10. Anonymous users2024-01-29

    First of all, we must know the foundation size of the fan, and then we must know the weight of the fan, the general foundation size is 50 100mm larger than the overall size of the fan foundation, the concrete strength and the number of steel bars are designed according to the weight of the fan, the foundation thickness is determined according to the design requirements and environmental requirements, and the number and thickness of the anchor bolts or the size and thickness of the connecting plate are confirmed according to the fan structure.

  11. Anonymous users2024-01-28

    Here you are asking about the cost of one cubic meter, right? For the fan foundation, it is relatively simple, and the cost is four or five hundred yuan per square.

  12. Anonymous users2024-01-27

    The exterior should be strengthened and covered with film to prevent temperature loss.

  13. Anonymous users2024-01-26

    This is mixed with 107 glue to make the surface layer, in fact, the fan foundation is generally directly poured with concrete at one time, and then directly calendered, without plastering again.

  14. Anonymous users2024-01-25

    After chiseling and brushing, water and moisten, and then sit on the bottom with the cement mortar of the concrete mark, and then pour the concrete to vibrate and compact.

Related questions
7 answers2024-04-08

Work-related injuries are subject to a period of suspension with pay, which is generally calculated based on the time of medical treatment** and the rest recommended by the medical institution. During the period of suspension of work with pay, the employer shall pay wages according to the original salary. The determination of the period of suspension of work and pay for injured employees varies from place to place, and there are roughly the following three methods: >>>More

10 answers2024-04-08

Do not freeze, the task of seed storage is to ensure the quality of seeds, prolong the life and use of seeds. >>>More

11 answers2024-04-08

Authentic sweet and sour garlic pickling method, sweet and sour garlic home recipe, white sweet and sour garlic pickling method, sweet and sour garlic pickling method correct method, authentic sweet and sour garlic pickling method, sweet and sour garlic recipe**, sweet and sour garlic home cooking, sweet and sour garlic pickling method tips.

28 answers2024-04-08

1. After the car is pasted with film, avoid raising and lowering the window within three days; >>>More

13 answers2024-04-08

It usually takes 1-2 days, and you can wash your face after recovery. Beauty lovers must be cautious in choosing a hospital, and it is recommended to choose a regular tertiary hospital for surgery. Of course, it is also important to take care of the post-operative work, and do not do strenuous exercise for a short time after the surgery. >>>More