What are the components of the purification project and what is included in the purification project

Updated on society 2024-04-08
15 answers
  1. Anonymous users2024-02-07

    The purification equipment included in the purification project includes: air shower room, cargo shower room, laminar flow hood, high-efficiency air supply outlet, pressure relief valve, air volume control valve, etc. The local environmental purification level of the purification project is very high, so we introduce customers to use clean workbenches, clean sheds and other purification equipment.

    The surrounding structure materials include color steel plates and various aluminum profiles.

    Electrical parts: air conditioning circuits, purification equipment circuits, lighting circuits.

    Air conditioning and ventilation part: The materials of the air conditioning part include air conditioning host, return air pipe, galvanized water pipe (or PVC water pipe), water tower, gate valve, water pump, Y-type filter, rubber soft connection, check valve, water flow switch, thermometer, pressure gauge, filter, and various pipe codes. The materials of the ventilation part include medium-efficiency pressurization box, damper, air volume regulating valve, primary rainproof louver, return air louver, primary filter, medium-effect filter, high-efficiency filter, laminar flow hood, thermal insulation cotton, thermal insulation hose, and various auxiliary materials.

    Floor part: epoxy resin flooring, PVC flooring, raised floor flooring.

  2. Anonymous users2024-02-06

    In fact, there are six main components of the purification project, namely: ground system, air duct system, automatic control system, electrical system, water supply and drainage system, and air filtration system.

    Floor system: Epoxy resin is generally used to clean the floor. Envelope structure system: Simply put, it is the three parts of the roof, wall and ground, that is, the six sides that make up the three-dimensional confined space. In detail, it includes doors and windows, decorative arcs, etc.;

    Air duct system: including air supply, return air, fresh air, exhaust duct, terminal and control device, etc.; Air conditioning system: including cold (hot) water units (including water pumps, cooling towers, etc.) (or air-cooled pipeline level, etc.), pipelines, combined purification air conditioning boxes (including mixed flow section, initial effect section, heating section, refrigeration section, dehumidification section, pressurization section, medium effect section, static pressure section, etc.);

    Automatic control system: including temperature control, temperature control, air volume and pressure control, opening sequence and time control, etc.;

    Electrical system: lighting, power, weak current three parts, including purification lamps, sockets, electrical cabinets, lines, monitoring, ** and other strong and weak current systems;

    Water supply and drainage system: water supply, drainage pipes, facilities and control devices, etc.;

    Air filtration system: junior high efficiency filter and other purification equipment: such as ozone, ultraviolet lamp, air shower (including cargo shower), transfer window, ultra-clean workbench, interconnection lock and other purification auxiliary equipment.

    Purification engineering can be divided into air purification and water purification engineering, air purification is within a certain space range, the air particles, harmful air, bacteria and other pollutants in the air are eliminated, and the indoor temperature, cleanliness, pressure, air velocity and air distribution, noise, vibration, lighting, static electricity control within a certain range of engineering disciplines. The specially designed rooms of the purification project have the performance of maintaining the cleanliness, temperature, humidity and pressure of the original set requirements, regardless of the changes in external air conditions.

  3. Anonymous users2024-02-05

    The purification project is mainly used in the electronics industry, food industry, pharmaceutical industry and other industries that require air cleanliness. The purification project mainly includes the ground, air duct, automatic control system, electrical system, water supply and drainage system, purification and air conditioning system, etc.

  4. Anonymous users2024-02-04

    Design and 13932174871 13832370865 construction of various types of laboratories, laminar flow laboratories, ICU disinfection rooms, central oxygen supply, hemodialysis rooms, GMP plants, etc

  5. Anonymous users2024-02-03

    The purification project mainly excludes pollutants such as particles, harmful air and bacteria in the air within a certain space range, and controls the indoor temperature and humidity, cleanliness, indoor pressure, air velocity and air flow distribution, noise and vibration, lighting and static electricity within the required range. The main thing is to precisely control the cleanliness, temperature and humidity to improve the working environment and increase the yield rate. <

    The purification project mainly excludes pollutants such as particles, harmful air and bacteria in the air within a certain space range, and controls the indoor temperature and humidity, cleanliness, indoor pressure, air velocity and air flow distribution, noise and vibration, lighting and static electricity within the required range. The main thing is to precisely control the cleanliness, temperature and humidity to improve the working environment and increase the yield rate.

  6. Anonymous users2024-02-02

    Air dust removal system, air disinfection system, airflow organization system and other units. The main equipment of the air purification project is composed of induced draft fan, pre-filter, main filter (electrostatic precipitator), ozone sterilization layer, activated carbon filter, negative ion generator and other parts. In addition, in order to ensure the humidity and temperature in the air, the dust-free purification project can also add heating or cooling, constant humidity and other devices.

    1) Induced draft fan: Generally, multi-stage centrifugal fan is used, which can ensure both air volume and pressure, and at the same time has low noise. The use of electrostatic precipitator can also be used to use a through-flow fan, which can also meet the requirements.

    2) Main filter: Remove particles less than 1. Choose between a HEPA filter or an electrostatic precipitator. Among them, the proportion of electrostatic use dust collectors is 90%.

    3) Activated carbon filter: After the main filter, it can be filtered through the activated carbon column, which can remove ozone and acid gas, and can purify the dust, aerosol and steam in the gas.

    4) Pre-filter, i.e., primary filter and intermediate filter, the purpose of dust-free purification project is to remove particles greater than 5 in the fresh air and protect the high-performance filtration equipment behind.

    5) Ozone sterilization layer: Use an ozone generator to generate ozone to sterilize and sterilize the air.

    6) Negative ion generator: The anion generator can make the particles floating in the air with negative electricity, and the dust-free purification project is to make these particles easy to collect or precipitate, so as to make the workshop air fresher. Therefore, the vast majority of air cleaning systems are equipped with ionizers to improve air quality.

  7. Anonymous users2024-02-01

    The purification project is composed of air conditioning and air purification system, which is also the heart of the purification system, purifying the number of dust particles in the air in the workshop, and regulating the temperature and temperature of the workshop.

    Changing room, air shower room and clean room are the three basic components of the workshop purification system.

    The air shower is a passage in and out of the clean area, and the high-speed clean air flow is sprayed to effectively and quickly remove the dust and bacteria carried by the human body.

    The clean room is made of sandwich color steel plate to isolate the space or wall, the upper color steel ceiling, and the floor is paved with epoxy resin.

    The purification equipment mainly includes purification workbenches, self-purifiers, high-efficiency filters, fume hoods, biological safety cabinets, various air showers and clean transfer windows. The above is provided by Shandong Purification Company Runde Purification.

  8. Anonymous users2024-01-31

    The decoration project of the purification workshop is composed of the following systems (none of which is missing in the components of the system.

    Yes), otherwise it will not constitute a complete and good quality clean room

    1) Ceiling system: including boom beams, ceiling lattice beams.

    2) Air conditioning system: including air cabin, filter system, windmill, etc.

    3) Partition panels: including windows, doors.

    4) Flooring: Including raised flooring or anti-static comfortable flooring.

    5) Lighting equipment: including fluorescent lamps, yellow tubes, etc.

    The main structure of the clean room building is generally made of steel bars or bone cement, but no matter what kind of structure, the following conditions must be met:

    a.No cracks due to temperature changes and vibrations;

    b.It is not easy to produce fine dust particles, and it is difficult to attach particles;

    c.Low hygroscopicity;

    d.In order to maintain the humidity conditions in the room, the thermal insulation should be high;

  9. Anonymous users2024-01-30

    1.Turbulent flow:

    The air enters the clean room from the air conditioner through the air duct and the air filter (HEPA) in the clean room, and is returned by the wall panels of the compartments on both sides of the clean room or the raised floor. The air flow is not a linear movement and is in an irregular turbulent or vortex state. This type is suitable for cleanroom class 1,000-100,000.

    2.Laminar flow (laminar):

    Laminar air flow air flow into a uniform straight line, air through a 100% coverage filter into the room, and through the raised floor or both sides of the partition board return air, this type is suitable for clean room level needs to be higher environment, generally its clean room level is class 1 100. Its type can be divided into two types:

    1) Horizontal laminar flow type: the horizontal air is blown out from the filter in one direction, and the air is returned by the return air system of the opposite wall, and the dust is discharged outdoors with the wind direction, which is generally seriously polluted on the downstream side.

    2) Vertical laminar flow type: the ceiling of the room is completely covered with ULPA filter, and the air is blown from top to bottom, which can obtain a higher cleanliness, and the dust generated by the process or staff can be quickly discharged outside without affecting other working areas.

    3.Mixed type:

    The composite type is a combination or combination of turbulent flow type and laminar flow type, which can provide local ultra-clean air.

  10. Anonymous users2024-01-29

    Purification project (i.e. clean room, clean room, clean room) refers to the removal of particles, harmful air, bacteria and other pollutants in the air within a certain space range, and the indoor temperature, cleanliness, indoor pressure, air velocity and air distribution, noise, vibration, lighting, and static electricity are controlled within a certain range of needs, and the room is specially designed. That is to say, no matter how the external air conditions change, the interior can maintain the characteristics of cleanliness, temperature, humidity and pressure that were originally set. It is mainly used in electronics, semiconductor, food, printing and packaging industries and other industries.

    With the development of society, more and more industries also need dust-free workshop purification projects.

    With the development of science and technology, people's living standards continue to improve, so the living environment and product quality requirements are getting higher and higher, dust-free workshop purification engineering is suitable for electronics, electrical appliances, medicine, food, scientific research, laboratories, hospitals and other industries. The needs of the production process are closely related to the production equipment and production environment

    1.To prevent dust, there is a lot of dust floating in the air.

    2.To prevent dandruff and hair from falling onto the product, it is strictly necessary to wear gloves, so as to ensure product quality, 3Prevent static electricity.

  11. Anonymous users2024-01-28

    The purification project is mainly in the space range, the air inside the effective elimination of various pollutants, this is the main core work of the purification project, in addition, should also adjust the temperature and noise and other invisible pollution, this is also a part of the purification project, but also the purification engineering company must complete the work!

  12. Anonymous users2024-01-27

    Purification engineering: control the cleanliness, temperature and humidity of the atmosphere that the product (such as silicon chips, etc.) is exposed to, so that the product can be produced and manufactured in a good environmental space. The design and construction process of this environmental space can be called a purification project.

    Purification engineering is a very wide range of basic supporting industries in the application industry, (21st century) in electronic information, semiconductors, optoelectronics, precision manufacturing, medicine and health, biological engineering, aerospace, automotive spraying and many other industries have applications, and according to the industry's precision and dust-free requirements, the grade difference is also large.

    At present, the highest level is the aerospace aviation warehouse, which basically belongs to level 1, which belongs to a special field and has a relatively small area.

  13. Anonymous users2024-01-26

    Hello answer, my side is inquiring for you, please wait a while, my side will reply to you 1Find the right purification company First of all, you must find a professional purification engineering company on the Internet, and choose from the qualifications, reputation, design level, and professionalism.

    After receiving the customer's demand, the purification engineering company will generally send a professional construction design team to the customer's location for on-site investigation. Start setting up your plan based on your customers' needs.

    4.Dust-free workshop construction drawing design After you are satisfied with the preliminary plan, the design company will begin to design the construction drawing.

  14. Anonymous users2024-01-25

    Design and 13932174871 13832370865 construction of various types of laboratories, laminar flow laboratories, ICU disinfection rooms, central oxygen supply, hemodialysis rooms, GMP plants, etc

  15. Anonymous users2024-01-24

    Purification engineering refers to clean room engineering, clean room, as mentioned above. Cleanrooms are mainly divided into industrial cleanrooms and biological cleanrooms. An industrial cleanroom is one that focuses on the control of inanimate particles.

    It mainly controls the pollution of air dust particles to the working object, and generally maintains a positive pressure state inside. It is suitable for precision machinery industry, electronics industry (semiconductors, integrated circuits, etc.), aerospace industry, high-purity chemical industry, atomic energy industry, optical and magnetic products industry (optical disc, film, tape production), LCD (liquid crystal glass), computer hard disk, computer head production and other industries.

    It mainly controls the contamination of working objects by living particles (bacteria) and inanimate particles (dust). It can be divided into:

    a. General biological clean room: mainly to control the contamination of microbial (bacteria) objects. At the same time, its internal materials should be able to withstand the erosion of various sterilants, and the internal pressure is generally guaranteed.

    In essence, the internal materials should be an industrial clean room that can withstand various sterilization treatments. Example: pharmaceutical industry, hospital (operating room, sterile ward) food, cosmetics, beverage product production, animal laboratory, physical and chemical laboratory, blood bank, etc.

    b. Biological safety clean room: mainly control the pollution of living particles to the outside world and people by the working object. The interior should be kept under negative pressure with the atmosphere. Examples: Bacteriology, Biology, Clean Laboratory, Matter Engineering (Recombinant Genes, Vaccine Preparation).

    The above information is provided by Zhongshan Jiemeirui Purification Project****.

Related questions
9 answers2024-04-08

Hello, to do a clean operating room, first of all, you need to have a professional design plan, as well as the corresponding engineering team, clean operating room includes: electrolytic plate, electric airtight door, steel airtight door, stainless steel medicine cabinet, instrument cabinet, anesthesia cabinet, purification light strip, medical sink, laminar flow ceiling, etc. The hospital should also have a ** room, operating room, etc.

8 answers2024-04-08

The commonly used tree species for landscaping are divided into south and north according to different regions. >>>More

9 answers2024-04-08

The essence of data visualization is visual conversation. Data visualization combines technology and art to convey and communicate information clearly and effectively with the help of graphical means. >>>More

7 answers2024-04-08

Building lighting project is an important part of urban lighting project, and excellent building lighting design plays an important role in enhancing the image of the city. The following seven issues need to be considered when doing the design of building lighting engineering: >>>More

16 answers2024-04-08

The basic requirements for binding are on.