What is the installation process for sports wood flooring?

Updated on home 2024-05-06
9 answers
  1. Anonymous users2024-02-09

    Method steps.

    Pre-installation site visit.

    There are two situations in which solid wood sports flooring is installed in the sports hall, one is the newly opened sports hall, and the other is to replace the better wooden floor, but no matter what kind of situation it is necessary to mention the site survey, the size of the site is on the one hand, the focus is to have a preliminary understanding of the construction site, and the ground installed on the solid wood sports floor must be kept clean and flat, so as not to affect the installation.

    Please click Enter a description.

    Install a moisture barrier.

    It is necessary to install a moisture-proof layer, because the solid wood sports floor itself is afraid of water, but after the installation of the moisture-proof layer, it will not be deformed due to water, and then the installation of wooden keel anti-corrosion treatment and shock-absorbing pad installation are all for athletes to better play ball and extend the service life of the sports floor.

    Please click Enter a description.

    The wooden keel should be embalmed.

    After the preparation is done, the installation of the plywood layer and the solid wood sports floor will begin, and the anti-corrosion treatment of the wooden keel should be paid attention to when installing, and the coating should be carried out evenly. It is necessary to carry out an overall grinding and ash repair procedure for the installed solid wood sports floor, and then paint the construction and close the edges.

    Please click Enter a description.

    After the installation is complete.

    After the paving of the stadium and theater stage is completed, the scene should be cleaned up, kept clean, and do not use it immediately, after a few days, wait for the solid wood floor paint to dry, and the functions are stable before putting it into use.

    Please click Enter a description.

    end precautions.

    Do a good job of waterproof and moisture-proof treatment before construction.

    Choose a professional flooring manufacturer (quality guaranteed).

    After the construction is completed, a professional testing agency is selected for quality inspection.

  2. Anonymous users2024-02-08

    Sports wood floor is a kind of functional wood floor different from ordinary wood flooring, due to the particularity of sports flooring, sports flooring must have sports, protection and technical performance, but the installation must be installed in accordance with a reasonable method, which is a safety guarantee for basketball stadium players. Let's talk about the installation process of sports wood flooring.

    1. Construction site handover: In order to ensure the installation quality of sports wood flooring, Party A shall provide a standard baseline (0) before entering the construction site, and the installer shall detect the horizontal error of the site according to the benchmark, and the positive and negative error of the cement base surface of the venue shall not be greater than 5mm.

    2. Site cleaning: Before the installation of the sports wood floor, first check whether the ground is waterproof, especially a layer of ground, and then clean the site and remove the cement mortar floating.

    3. Instrument leveling: according to Party A's requirements for sports wood flooring, the cement foundation surface of the venue is leveled with a level, and the height difference is checked.

    Fourth, put the baseline: according to the construction design drawings every 400mm 400mm center line distance to release the wooden keel installation line.

    Fifth, find the reference point: use a level of about 3m to determine the level of 0 at the rubber elastic leveling pad.

    6. Put down the keel: the lower keel is placed on the rubber leveling pad according to the 400mm center spacing, the ends of the two keel joints should be placed on the rubber pad, and the lower end of the joint of the two keels that are not on the rubber pad should be reinforced with wooden cushion blocks.

    7. Elastic rubber pad installation: On the lower keel, the position of the rubber leveling pad is taken as the benchmark, and the elastic rubber pad is installed every 400mm interval, and the lower keel is fixed with 50 air nails.

    8. Place the upper keel: the upper keel spacing is 400mm, the upper and lower keels are installed in a cross type, the keel is reinforced with 100 self-drilling wires, and the junction of the two keels ends is connected with 50 gas nails, and the keel end saw mouth should be treated with anti-corrosion.

    9. Keel leveling of sports wood floor: After the keel is pre-installed, the third leveling must be carried out, and the height error must be reduced to within 2mm of the 3m level, and the next process can only be carried out after all levels reach the standard.

    10. Installation of raw floor: In order to make the negative force of the wooden floor uniform, the raw floor should be installed vertically, and 20-40mm expansion joints should be reserved at the closing point of the wool board and the wall, and the installation of the raw floor should be fixed with U-shaped iron nails. Remember, the installation of sports wood floor-wool boards must have expansion joints on the wall.

    Ten. 1. Laying moisture-proof film: Spread the special moisture-proof film for sports wood flooring according to the direction of panel laying, the joints should avoid overlapping, and the joints should be adhered with pressure-sensitive tape.

    Ten. Second, sports wood floor panel installation: after the completion of the above workload, the panel can be installed, the basic requirements of the panel installation is the longitudinal surface of the venue, and the lateral direction should be the wide surface of the venue, so as to reduce the expansion and expansion rate of the floor.

  3. Anonymous users2024-02-07

    First, the construction conditions of basketball wood flooring.

    1. The civil works of the wooden floor are completed before construction, the construction site is neat and clean, and the ground construction quality meets the requirements of architectural design; It should be waterproof, moisture-proofed, and air-proofed;

    2. After the installation of indoor water, electricity, steam, ventilation and other installation projects, the water network pipeline is confirmed to have met the design requirements and is used normally after the pressure test;

    3. Avoid cross construction. If it is really necessary for cross construction, it must be negotiated by the owner, the general contractor, the project supervisor, the installation team, etc., to clarify the responsibilities and reach a consensus. and form a written summary;

    4. Determine the moisture content of the floor material, the ground humidity and the atmospheric humidity.

    Second, the construction equipment of basketball wooden flooring.

    1. Equipment, tools and instruments: level, polisher, portable planer, portable cutting machine, spray gun, nail gun, electric hammer, level and common tools for construction and woodworking;

    2. Materials and materials: all kinds of materials required before construction are transported to the designated place, properly stored and kept according to the product performance, and the storage quantity meets the construction schedule;

    3. Inspection of construction conditions: check whether there are construction conditions, and submit matters that do not meet the construction requirements to the relevant departments for negotiation and resolution in writing;

    4. Preparation of relevant systems such as construction progress, on-site management, etc

    Establish a construction supervision team: determine the responsibilities of the members of the construction supervision team;

    Preparation of construction schedule: Preparation of construction schedule according to the plan.

    5. Carry out technical, safety, fire prevention, anti-theft, and civilized construction education for construction personnel, abide by construction specifications, obey on-site management, and implement rules and regulations.

    3. Ground leveling and division of basketball wooden floor;

    1. Leveling and cleaning the site of cement floor and wall (where the baseboard is installed).

    2. Using the 9-point method, use a level to determine the horizontal plane and mark the side wall;

    3. Determine the position of the outer dividing line and mark it on the side wall;

    4. Confirm that the cross is in the same horizontal plane, the convex part is smashed flat, and the recess part is leveled by drawing design materials;

    5. The sports wood floor is coated with anticorrosive materials on the surface of the skid.

  4. Anonymous users2024-02-06

    The installation process of sports wood flooring basically includes ground finishing, opening baseboard holes, thoroughly cleaning the ground, laying moisture-proof film, laying floor mats, pre-selecting color separation, trial paving, paving, hammer tapping the floor splicing, installing springs at the ends, installing baseboards and cleaning the finish.

    The whole process of construction of sports wood flooring needs to comply with ISO9001, ISO14001 and ISO45001 quality management system certification, improve installation quality and reduce safety risks.

    In the wood floor paving stage, from the ground treatment to the treatment of the structural system to the installation of the panel, all links must meet the relevant technical requirements and acceptance standards, and there can be no defects that affect the use of the wood floor, and can not be greater than 70% of the allowable deviation value.

    The structure of sports wood flooring is mainly composed of surface floor, raw floor layer (load division layer), keel layer, moisture-proof layer and elastic cushion block. The use, performance index requirements, cost and materials used in the structural layer of sports wood flooring are different

    1. Panel flooring: refers to the outermost floor used for sports wood flooring, which is the contact panel between athletes and the floor in sports wood flooring applications.

    2. Raw floor layer: refers to the plate layer that is close to the lower part of the surface layer floor and plays the role of leveling, increasing strength and dispersing load.

    3. Keel layer: refers to the supporting skeleton installed under the surface floor or under the wool floor layer.

    4. Moisture-proof layer: refers to the isolation or moisture-proof material placed between the surface floor and the raw floor layer or keel layer and the base layer of the building structure (cement floor).

  5. Anonymous users2024-02-05

    The installation of sports wood flooring must use professional installers, otherwise the installation is not good, there will be instability, and the ball rebound is not up to standard.

  6. Anonymous users2024-02-04

    Indoor basketball stadiums are professional basketball platforms. A basketball stadium must have a good ground space, in addition to purchasing professional quality basketball court wood floor products, it must also have a professional basketball court wood floor installation effect. Basketball court wooden flooring three-point flooring, seven-point installation.

    What are the specific requirements for the wooden floor paving of the basketball court:

    1. The foundation cement floor must be self-leveling, and the ground is required to be smooth, flat and free of sand and dust.

    2. The overall horizontal difference of the floor shall not exceed 2cm, and the height difference within the 2m ruler shall not exceed 3mm.

    3. The sports wood floor and the surrounding floor need to be closed, and the overall flatness of the surrounding floor must be controlled within 5mm.

    4. The floor waterproof layer must meet the requirements of the building index.

    5. The cement floor must be dry and have a moisture content of 10%.

    6. Before the floor is installed, there shall be no miscellaneous goods stacked.

    7. Install all kinds of sports equipment embedded parts according to the design requirements.

    8. If the ground is designed with wiring grooves, pipelines, etc., drawings and corresponding written instructions should be provided in advance, and the installation of the wooden floor of the basketball court should be completed, and the open wire should not be installed.

  7. Anonymous users2024-02-03

    Before the installation and laying of sports wood flooring, the ground should be smoothed, if the ground is potholes and it is very difficult to lay the floor, and the wooden floor is made of solid wood for fear of moisture, so the humidity of the concrete ground is greater than 3-4% should be ventilated and dried; Wear soft-soled shoes when working on sports wooden floors to prevent scratching the surface layer;

    The bottom cushion block and keel of the sports wood floor are treated with anti-corrosion, and the raw floor is treated with colorless anti-corrosion treatment on the keel in the production process, and there is no need to paint the fireproof and anti-corrosion coating;

    After that, it is the layout, positioning, and pay-off work, and then the center line of the wooden keel position pops up on the ground;

    When installing the keel, it should be noted that the elastic rubber pad must be installed, and the spacing between the elastic pad positions is 400;

    When the keel is paved, it is necessary to pay attention to leaving a gap of 20-30mm between the wall for ventilation and moisture, and there should be a gap of at least 20mm between the surface layer of the wooden board and the wall, and finally cover it with a baseboard; When paving the floor surface, the gaps should be tight and the joints should be staggered;

  8. Anonymous users2024-02-02

    The construction of sports wood flooring system is actually very complex, and many details need to be handled by professional construction personnel in the construction

    1. Draw the position line of keel and cushion block on the construction base surface;

    2. Test the height difference of the base surface with a special level, and the height difference within the range of 3m ruler shall not exceed 2mm;

    3. Install the leveling cushion block on the reference point, and the elevation error of the cushion block shall not exceed 1mm;

    4. Install an elastic pad on the leveling cushion block;

    5. Install the keel of the specifications required by the contract;

    6. Cooperate with civil engineering units to install embedded parts of wooden floors;

    7. Stagger the solid wood floor, spread it on the keel, and fix it with floor nails;

    8. Pave moisture-proof film on the wool floor;

    9. The surface layer of the sports wood floor system is installed on the wool floor, which is required to be in a straight line longitudinally;

    10. Polishing the surface layer of the wooden floor and applying paint.

    In the process of installing a sports wood flooring system, it is also necessary to pay attention to the following two points:

    1) Closing strip: leave about 15mm blank between the sports wood floor and the surrounding wall and column edge. The closing strip is made of bilateral maple color PVC edge strip, which is pasted on the expansion joint after being coated with glass glue, which is firmly pasted and the interface is smooth. It is forbidden to step on the closure for 24 hours after the closure is applied.

    2) Footboard: Nail it with fine steel nails, and seal it with transparent glass glue at the uneven place between the footline and the wall.

    Hope it helps.

  9. Anonymous users2024-02-01

    Professional sports wood floor construction Shenzhen Guanaotong has a good reputation.

    In order to meet the requirements of the gymnasium and ensure the construction quality of professional sports wood flooring, Party A shall provide and create a sports wood floor working surface and construction conditions that meet the reasonable requirements of Party B before the construction is entered

    1.The foundation of the sports wood floor construction hall is completed and the maintenance period is not less than 28 days;

    2.The decoration and decoration projects in the sports wood floor construction hall must be completed and the relevant personnel must be withdrawn;

    3.The construction of sports wood flooring completed the installation and commissioning of lighting projects, speakers, air conditioning and ventilation, various display screens and scoring equipment in the hall;

    4.The waterproof and leak-proof roof in the sports wood floor construction hall must be accepted;

    5.The construction of sports wood floor completed the pre-embedding project of instruments in the museum;

    6.The construction of sports wood flooring should ensure the three links (water, electricity, and roads) of the construction site. It is required that the ground flatness is good, polyurethane waterproof is done after curing, and then 10mm thick mortar is used as a protective layer, and a 30-50mm mortar screed layer is made on top.

    Leveling height plus floor structure layer height and ground level) If there is no waterproofing, surface waterproofing can be used to directly lay the floor.

    7.The ground flatness of the leveling layer reaches 3m and is measured by a ruler, and the positive and negative errors within the radius of 3m are not greater.

    3mm, if the error is large, the site needs to be leveled and the surface should be calendered;

    8.The moisture content of the foundation should reach 10%-30% before the construction of the wooden floor can be carried out;

    9.Party A of the floor concealment project should be clearly marked to avoid interrupting the buried line during drilling, resulting in the interruption of the buried line;

    11.For the column in the middle of the site and the surrounding drainage pipes and fire pipes, the ground construction technology should reach a consensus with Party A before construction that the wood should be stored in a rain-sheltered place and not occupy the construction ground.

Related questions
13 answers2024-05-06

Cork flooring is known as the "pyramid tip of the floor", compared with solid wood flooring and parquet flooring, it is more environmentally friendly, sound insulation, moisture-proof effect will be better, and it will bring people an excellent foot feeling. Cork flooring is 200 times more wear-resistant than hardwood flooring, more soft, quiet, comfortable and other characteristics, for the elderly and children to accidentally fall, can provide great cushioning effect, its unique sound insulation effect and thermal insulation performance is also very suitable for use in bedrooms, living rooms, study rooms, conference rooms, libraries and other places. >>>More

8 answers2024-05-06

1. Check the quality of the panel before installation;

2. Lay the central floor along the direction of the central keel one by one, the surface is consistent with the design elevation, located in the center, the edge is in a straight line, and is reinforced from both sides after qualifying, the central row floor is a tenon type on both sides, and the steel nails are nailed at every 400mm at the two ends and in the middle when reinforced, and smashed into the inside of the floor, but the floor shall not be damaged, and the nail hole is smooth and smooth; >>>More

6 answers2024-05-06

1. When your original ground is uneven or not wiped in the case of the leveling layer, choose the wooden keel method, and then save the cost of the project, the wooden keel generally chooses 40 * 40 or the cross-sectional size of the personnel activity is large with 40 * 60, the spacing is first done according to the modulus of the wooden floor, but not greater than the middle distance of 350, the wooden keel piece should be used and glued, and the ground is fixed with anticorrosive wooden bricks on the left and right of the wooden keel, and the wooden keel piece is fixed in the shape of a mountain! Before installation, the bottom side of the wooden keel is brushed with anticorrosive paint 2-3 times! The upper level of the wooden keel should be planed, and it should be planed after installation! >>>More

8 answers2024-05-06

The floor is the last step in home decoration, and the walls of the home are generally treated, and the floor is paved after the home is cleaned up. Therefore, before laying the floor, you must finish all the dirty decoration work, and then clean the floor. If you want to install laminate flooring and don't need to make a keel, you also need to do a good job of leveling the cement floor or the bottom layer. >>>More

9 answers2024-05-06

There are hollow drum sounds, uneven surfaces, loose joints, local warping drums, etc. >>>More