Siemens PLC transistor CPU224 comes with analog output?

Updated on educate 2024-05-21
10 answers
  1. Anonymous users2024-02-11

    Number of Digital Output Points Integrated10Output TypeSolid State-MOSFET (Source)Rated Voltage24VDCPorp.Output Voltage Range to Logic 1 Signal (Minimum)Logic 0 Signal (Max)20VDC,Max Current,10kW LoadRated Current Per Point (Max)Rated Current Per Common Terminal (Max)Leakage Current (Max)Inrush Current (Max),100ms Lamp Load (Max)5W On-Resistance (Contact)Typical Ohms, Max Ohm Isolation (Field & Logic) The optoelectronic isolation group has 500VAC, 1 minute see the wiring diagram, the delay (max) is disconnected to the switched on to the disconnected 2ms (,, 15ms (other) 10ms (,, 130ms (other) pulse frequency (max) 20kHz (and the output 10 turned on at the same time The two outputs are connected in parallel, and the maximum cable length shielded and unshielded 500 meters (standard output) 150 meters (standard output) is when the output is in the same group

  2. Anonymous users2024-02-10

    The CPU224XP can be connected to 2 0-10V analog (A+ and M, B+ and M respectively) in two wires, and your output is 4 20mA, which needs to be converted into 2-10V with a 500 ohm precision resistor in parallel. The specific wiring is: 1, terminal M:

    Connect the negative power cord of the three-wire sensor and one end of the precision resistor; 2. Terminal A+ (or B+): connect the signal line of the three-wire sensor and the other end of the precision resistor; 3. The positive power cord of the three-wire sensor is connected to the 24VDC positive terminal L+.

  3. Anonymous users2024-02-09

    A+ and B+ are two analog inputs corresponding to M, which can input a voltage signal of 0 5 and 0 10V, and you can rent M i V is an output signal, which can only be connected to one of the outputs, I is the current output, and V is the voltage output.

    Therefore, the CPU224XP has 2 analog inputs and 1 analog output contact.

  4. Anonymous users2024-02-08

    di do is a digital quantity, and ai ao is an analog quantity (depending on how you understand the switching quantity and the digital quantity).

    The manual says digital, probably because the input and output must be active, although the power supply is external. Personally, it is understood as a switching quantity. Technical Specifications CPU 224 CPU 224 XP

    Integrated digital inputs and outputs: 14 in, 10 out, 14 in, 10 out.

    Integrated analog inputs: 0 inputs, 0 outputs, 2 inputs, 1 outputs.

    Number of expansion modules that can be connected (max) 7 7 7.

    1. Switch: on-off signal, passive signal, resistance test method for resistance 0 or infinity;

    It can also be an active signal, the professional name is a step signal, that is, 0 or 1, which can be understood as a pulse quantity, and multiple switching quantities can be composed of digital quantities.

    2. Digital: There are signal types composed of 0 and 1, which are usually regular signals after encoding. The relationship with the analog quantity is the quantized analog quantity.

    A digital quantity is defined as a discrete signal that changes intermittently in time and value.

    The switching quantity is passive, that is, it needs the output power supply of the device to detect it (this is also the amount of the device, for example, the non-power input of the comprehensive protection device is an externally provided amount of input); It can also be encoded with 0 and 1 to make various communication codes.

  5. Anonymous users2024-02-07

    The 224 input and output are all switches, and the 224XP host comes with analog input and output.

  6. Anonymous users2024-02-06

    Switching quantities, although analogue quantities can be handled by extending the analogue module.

  7. Anonymous users2024-02-05

    If you don't need your frequency conversion stepless speed change, you don't need an analog module, you can use it directly with the switch, we generally use the switch, as you can see in the figure below

  8. Anonymous users2024-02-04

    There is no difference, they are all analog inputs, which are equivalent to No. 1 and No. 2.

  9. Anonymous users2024-02-03

    All 0-10VDC share a m 0-32000 range, corresponding to AIW0 and AIW2

    For more information, please feel free to ask any questions.

  10. Anonymous users2024-02-02

    One is the input and the other is the output! ai ao

Related questions
8 answers2024-05-21

It is not suitable, it is easy to cause the PLC output to burn out, it is recommended that the PLC output be connected to the intermediate relay first. >>>More

11 answers2024-05-21

The problem you encounter now is something I have experienced when I used to study on my own, I used to buy a ** of technical success, I can only read it for a year, and I bought a lot of books, and I look at it Sometimes I doze off, sometimes I encounter a problem, although I have a friend who is an engineer and can occasionally answer it, but it is not good to trouble people often, and then I don't want to learn when I learn to learn, and there was no equipment practice at that time, and I didn't learn again for several months, and then it was a colleague of mine, who used to be an electrician together, He learned from Bojun PLC, at that time his monthly salary was more than nine k, and then I also went to study, and now I am also an engineer, and I also take on some projects in my spare time, which is not bad.

10 answers2024-05-21

These two are mainstream PLCs, one made in Japan, one made in Germany, I have used both, both are very representative, it is recommended to learn both, you can learn Mitsubishi's first, because most of the programming methods of other brands of PLC are imitation of Mitsubishi, especially domestic brands, just like the Delta I use now, and Xinjie, which is almost exactly the same as Mitsubishi. Mitsubishi is what a traditional ladder looks like. And Siemens is also unique, although he also said that it is a ladder diagram, but his is a modular ladder diagram, which looks more intuitive than Mitsubishi's, and the step7 software is also very easy to use. >>>More

6 answers2024-05-21

PLC did not delve into it, did not understand.

4 answers2024-05-21

Siemens PLC

The reason for the internal error in OLE is that the password in the IIS Metabase is synchronized, because this change is too sensitive and important, and Microsoft. >>>More