Engaged in on site construction and budget decision???

Updated on society 2024-05-19
18 answers
  1. Anonymous users2024-02-10

    1. Those who do construction are harder and have higher wages. Doing construction gives people a not very decent feeling.

    In the construction unit, the road ahead is very long and difficult, and there are many hurdles to cross, such as civil construction supervisors, technical leaders, production managers, and project managers. It could take you 10 years.

    You also have to take the exam to get a certificate, a construction worker certificate, an engineer, a first-class construction engineer certificate, etc. I want to find time to read and study in the evening.

    2. The people who do the budget are also very tired, but the ones who get the money are decent. The promotion is to the manager, the distance is close, and then take the exam for a registered cost engineer, just do it. The people I come into contact with are all decent, and life is good.

    3. Choose according to your sexual interests and hobbies.

    4. From a practical point of view, it is beneficial to improve the budget level by doing construction first and then budgeting.

    5. The amount of knowledge of civil construction is large, and you don't want to become a talent without 10 years. And the amount of budget knowledge is much smaller. 2 You can become a talent in 5 years.

  2. Anonymous users2024-02-09

    If you want to work on budgeting in the future, it is best to experience different projects and obtain the basic parameters of the front line in person.

  3. Anonymous users2024-02-08

    When I was young, I worked on the field for a few years, and I could learn things on the spot, not just in terms of budget, but also in everything. And it's really hard for people who don't understand the scene to get the budget right.

  4. Anonymous users2024-02-07

    The budget is more stable, but narrower, the working conditions are better, but the manual work is larger. If you are promoted to a construction organization, you have a greater chance of changing jobs, but you may not be able to cross the gantry. The work pressure is similar, but the characteristics are different, depending on your personality and ambitions and family background.

    If you can build the organization, you can organize the construction.

  5. Anonymous users2024-02-06

    The main task of the budget of the construction unit is cost control and cost management, which can generally be divided into before, during and after the control.

    During the construction process, the project department does the budget belongs to the control, and its main work is 1, cost control, that is, the amount of each sub-item, the total cost of control 2, engineering measurement, the calculation of the actual construction quantity and the amount of visa 3, visa control, calculation of visa, and Party A for visa ** and change of engineering quantity ** negotiation 4, declare the monthly engineering quantity, some projects are allocated according to the actual engineering quantity of the project, then it is necessary to report the completion of the bill of quantities**.

    The quota book of the project cost is the soldier's gun, and the project department generally needs to prepare: quota, calculation software, bidding quantity list, contract and other information in order to complete the cost control work.

  6. Anonymous users2024-02-05

    This is the leader arranging for you to control costs.

  7. Anonymous users2024-02-04

    The work to be done by the construction site budgeter mainly includes the following three aspects:

    1. The construction drawing budget before entering the site construction, that is, to determine the project budget or contracting.

    2. During construction, report the monthly progress report to the construction party and the competent department at a higher level.

    3. After the completion of the project, the settlement shall be carried out according to the as-built drawings and the change visa form.

    In a nutshell, it is to turn the quantity of the project into a cost, that is, how much money is spent to do a certain project, how much money should be obtained, etc.

  8. Anonymous users2024-02-03

    It is necessary to do visas, report the output value, find Party A and the supervisor to deal with the relationship, and the most important thing is to make the project budget, and the project manager has to do what he asks.

  9. Anonymous users2024-02-02

    The most is also the most painstaking, count the engineering quantity, and then summarize the budget, and there are some commonly used budget tables** to submit to Party A.

  10. Anonymous users2024-02-01

    It is not necessary to go to the construction site to make a budget, but you must have construction experience.

    It is not necessary to go to the construction site to make a budget, but you must have construction experience. Understand the specific construction process of your budget project, the construction period, and the expenses that will be incurred.

    If you just look at the drawings, it is not possible to set quotas. At present, some construction drawings are designed and shoddy, and only the construction objectives are expressed on the drawings, and all the costs that must be incurred in the construction cannot be described.

    For example, auxiliary materials, measures and fees. If you don't understand the specific construction process of your budget project, the costs incurred in construction.

    If you have a quota that includes those expenses and doesn't, you'll miss or overcount.

  11. Anonymous users2024-01-31

    Hello, I am a cooperative lawyer, I have received your question, I need a little time to answer, wait a minute.

    Project budget The construction and installation project cost is composed of direct costs, indirect costs, profits and taxes 1. Direct costs = direct project costs + measure costs.

    Hello question, please ask.

    The role of the project budget quota: (1) it is the basis for preparing the budget and settlement; (2) It is the basis for the preparation of the unit valuation table; (3) It is the basis for calculating the project budget cost and preparing the construction project budget estimate quota and budget estimate index; (4) It is the basis for the construction unit to evaluate labor productivity for economic accounting.

    Ask how to budget for civil works.

    First, the civil budget is prepared and determined by the design unit after the completion of the construction drawing design, according to the construction drawing design drawings, the current budget quota, the cost quota and the regional equipment, materials, labor, construction machinery and other budget ** preparation and determination of the cost of construction and installation projects. Civil engineering budget is an important part of controlling the project cost in the design stage, and it is an important measure to control the construction drawing design not to break through the design budget estimate.

  12. Anonymous users2024-01-30

    Hello.

    1. Project Budgeting Methodology 1 Periodic Budget (1) In this budget, a plan for the next fiscal year that has been least modified over time is formulated. (2) Generally speaking, the expected total cost of each year is apportioned over the course of the year on a monthly basis and according to the activity advantage of factor costs. (3) Such a month"Salary"As the expected cost of 1 to 12 is simply amortized over each month, while seasonal fluctuations in sales require a little more attention to marketing and production costs as well as changes in costs in the course of fluctuations.

    2. Continuous (rolling) budget (1) In this budget, an experimental annual plan is prepared, in which the first quarter is prepared in detail by month, the plan preparation for the second and third quarters is relatively brief, and the plan for the fourth quarter has only a general outline, and each month (or perhaps every quarter) the budget is revised by adding the details required for the next month (or quarter) and adding a new month (quarter), so that the plan is extended to one year, This kind of budgeting process is very desirable to adapt to changes in the environment and the impact of some uncertainties.

    2) Because it forces managers to constantly consider specific conditions for the new year, no matter where they are in the current financial year. (3) Regular budgeting is often satisfactory for companies in stable industries because they can make relatively precise plans for the planning period. (4) Conversely, rolling budgets have greater value in the more common case of certain irregular, cyclical activities brought about by uncertain consumer demand.

    2. Introduction to the project budgetThe project budget is a plan for the income and expenditure of the project in a certain period of time in the future. It can evaluate the investment of the project in the form of money and reflect the economic effect of the project. It is the basis for strengthening enterprise management, implementing economic accounting, assessing project costs, and preparing construction plans; It is also the main basis for project bidding and determining the cost of the project.

    3. Project budget prospects1, with the rapid development of China's economy, the investment in national infrastructure continues to increase, the gap of high-end talents in the project budget is also increasing, and its treatment is also rising. 2. In short, the economic income of the engineering budgeter is very rich, the work is stable and long-term, the time is relatively free, and he can be employed for life, which is very respected.

  13. Anonymous users2024-01-29

    With on-site experience, the budget is clear, some drawings are not clear, with construction experience will not be missed, less calculated, you can also make a budget, while going to the site to understand, ask more teachers around.

  14. Anonymous users2024-01-28

    Don't listen to some people talking nonsense about doing construction first and then budgeting, in reality it is very, very difficult to turn, and there are a lot of harms.

  15. Anonymous users2024-01-27

    1. If you want to live a more stable life and don't want to be too tired, don't do construction.

    2. If you don't have anything, you don't have to worry about anything, you can start with construction.

    3. Because the construction has a deeper understanding of the construction plan and process, it will be helpful for the future budget; Doing construction has a sensory understanding of the project, and the budget will be considered in the future. There will be a basic concept and understanding of the cost price of the sub-project in construction, so that you can better use the bidding strategy when bidding.

  16. Anonymous users2024-01-26

    To start from the construction, you should go to the site to understand the situation, look at the specific practices, try to calculate the amount accurately when making a budget, and master the following contents:

    1. Master all the contents of drawing design.

    2. Master the standard atlas of steel bars.

    3. Master the calculation rules of engineering quantity and the principle of fixed valuation. Attribute quotas and understand the content of remarks.

    4. Master the use of graphic takeoff.

    5. The settlement must grasp the provisions of the contract-related settlement.

    6. If it is a bidding, you must be familiar with the provisions of the bidding documents.

  17. Anonymous users2024-01-25

    First of all, the first article, whether the quantity calculation is consistent with the drawings, and secondly, whether the quota is reasonable, this is the budget, and the settlement can refer to the bidding documents;

    The construction unit is tired of a lot in the specific construction, for example, the phenomenon of cutting corners will more or less exist, which requires project control, as a cost personnel, unless it is on site, it is difficult to control, and it can only be used as the basis for the calculation of the quantity of work confirmed by the construction site;

    For example, when I first joined the work, the contract stipulated that the on-site visa settlement would be discounted by 7% according to the review price, I did not see this clearly, and was scolded by Party A's control personnel, so the terms of the contract must be read carefully, and the important terms are listed.

    Finally, people who have just debuted are afraid that their ideas are wrong and are very modest, so it is difficult to stick to many principles, my suggestion is that you must stick to what you think is right, and if you think the construction unit is wrong, ask them to come up with a basis to convince you. Of course, what you think is right must also have a basis to convince others. These are my feelings since I worked, and I share them with you, hoping it will be useful to you.

  18. Anonymous users2024-01-24

    See if there are more than one budget of the construction unit.

Related questions
12 answers2024-05-19

1. Selection of foundation construction technology.

Before foundation construction, it is necessary to develop a reasonable construction technology according to the details of the construction site. Because the construction technology used for different foundation properties is different, the water quality status, climatic conditions, and surrounding environment of the site are investigated and understood in detail, and then a reasonable construction technical plan is formulated according to the existing technical force of the project and the condition of the machinery and equipment. The selection of construction technology must be adapted to the site conditions to ensure the construction quality of the foundation. >>>More

5 answers2024-05-19

1) Material processing and ordering.

According to the resource demand plan, get in touch with the building materials processing and equipment manufacturing departments or units, sign the supply contract, and ensure that the time is met. >>>More

7 answers2024-05-19

construction site. The fire extinguisher configuration shall comply with the following provisions: >>>More

13 answers2024-05-19

It can detect the construction area screen in real time, and actively trigger the alarm prompt when the monitoring area is not wearing a safety helmet, not wearing a safety belt, not wearing a uniform, sleeping on the post, smoke and flames, and the construction site safety management monitoring system is better to notify through text messages, **, alarm voice, etc.

3 answers2024-05-19

Scaffolding collapse can be claimed.

The protection of construction workers is mandatory by law and is subject to work-related injury compensation. Force majeure is also not a reason to exempt from liability. >>>More