Decoration engineering design and construction integration qualification, main professional and tech

Updated on educate 2024-05-08
5 answers
  1. Anonymous users2024-02-09

    1) The technical person in charge of the enterprise has no less than 6 years of experience in building decoration and decoration engineering, and has the professional qualification of registered construction engineer (registered structural engineer, architect, project manager) or intermediate or above professional and technical titles.

    2) There shall be no less than 5 professional and technical personnel with the professional qualifications of registered constructors (structural engineers and project managers) of the second level or above.

    Technical Leader: 6 years of engineering experience, second-level registered constructor.

    Registered Structural Engineer, Architect, Project Manager) professional qualification or intermediate or above professional and technical titles.

    A total of 5 personnel are required (Constructor II.

    Second-level structural engineer) from these 5 selected as the technical leader, and has performance, intermediate title or above.

  2. Anonymous users2024-02-08

    In 2015, the second-level qualification standards and staffing for professional contracting of building decoration and decoration projects.

    1 Business assets.

    Net assets of more than 2 million yuan.

    2. Key personnel of the enterprise.

    1) There shall be no less than 3 registered constructors majoring in construction engineering.

    2) The technical person in charge has more than 8 years of experience in engineering construction technology management, and has the intermediate title or above in the engineering sequence or the professional qualification of registered constructor (or registered architect or registered structural engineer) in construction engineering; There are no less than 5 people with intermediate or above professional titles in architectural art planning, structure, HVAC, water supply and drainage, electrical and other majors.

    3) There are no less than 10 construction site management personnel holding positions, and the construction personnel, quality personnel, safety officers, material personnel, cost personnel, labor personnel, data personnel and other personnel are complete.

    4) There are no less than 15 professional and technical workers such as carpenters, masonry workers, inlay workers, painters, masonry workers, plumbers and electricians who have passed the assessment or training

    Person. 4) The technical person in charge (or registered constructor) has presided over the completion of no less than 2 projects in this category.

    It can undertake the construction of building decoration and decoration projects with a single contract amount of less than 20 million yuan, as well as other projects directly supporting the decoration project.

  3. Anonymous users2024-02-07

    Over the years, the company has focused on providing all kinds of engineers with full-time, engineering qualification handling, transfer and consulting services for domestic construction banks, electric power banks, engineering survey companies, municipal enterprises and other (business) enterprise engineering design units! The eight members of the construction department handle the Ministry of Construction, the Ministry of Water Resources, and the Ministry of Communications! **Low!

    Get off the certificate quickly! Grade II Professional Contracting Qualification for Building Decoration and Decoration Engineering.

    Qualification standards: enterprise assets: net assets of more than 2 million yuan.

    Key personnel of the enterprise:

    1) There shall be no less than 3 registered constructors.

    2) The technical person in charge has more than 8 years of experience in engineering construction technology management, and has the intermediate title or above in the engineering sequence or the professional qualification of registered constructor (or registered architect or registered structural engineer) in construction engineering; There are no less than 5 professional titles.

    3) There are no less than 10 construction site management personnel with post certificates.

    4) There are no less than 15 professional and technical workers such as carpenters, masonry workers, inlay workers, painters, masonry workers, plumbers and electricians who have passed the assessment or training.

    5) The technical person in charge (or registered constructor) presides over the completion of no less than 2 achievements.

  4. Anonymous users2024-02-06

    Application Materials*1) Application Form for Engineering Design and Construction Qualification and electronic documents;

    2) The original and copy of the business license of the enterprise legal person;

    3) The original and copy of the design qualification and construction qualification certificate of the enterprise (the newly established enterprise may not provide it);

    4) The enterprise's capital verification certificate or audited balance sheet;

    5) Articles of Association;

    6) Identity certificate, resume and appointment documents of the legal representative of the enterprise;

    7) the resume and employment documents, graduation certificates, qualification certificates or registration certificates, professional title certificates, and proof of project performance completed by the technical person in charge of the enterprise;

    8) The identity certificate, qualification certificate or registration certificate, and personal performance certificate of the registered practitioner of the enterprise (required in the qualification standards);

    9) The identity certificate, graduation certificate, professional title certificate, project manager qualification certificate, and personal performance certificate of non-registered professional and technical personnel of the enterprise (required in the qualification standards);

    10) The dismissal certificate of the professional and technical personnel of the enterprise (including registered and non-registered personnel) and the original employing unit or the personnel relationship certificate issued by the relevant personnel management department, and the labor contract and social insurance certificate signed with the current employing unit;

    11) Proof of the enterprise's workplace and necessary technical equipment;

    12) enterprise quality management system and technology, safety, archives and other aspects of management system documents.

    In addition to the above materials, enterprises applying for qualification upgrades and additions also need to provide the following materials:

    1) The original and copy of the qualification certificate;

    2) The audited financial statements of the enterprise for the past three years; 1. Enterprise credit.

    1) Have the qualification of an independent corporate legal person;

    2) The registered capital of industry and commerce shall not be less than 500,000 yuan, and the net assets shall not be less than 600,000 yuan.

    2. Technical conditions.

    The technical person in charge of the enterprise shall have no less than three years of experience in building decoration and decoration engineering, and shall have the professional qualification of registered constructor (architect, project manager) of the second level or above or the professional and technical title of intermediate or above.

    3. Technical equipment and management level.

    1) Have the necessary technical equipment and a fixed workplace;

    2) Have a sound technical, security, contract, financial, archives and other management systems.

    3) Proof of the performance of the project completed by the enterprise.

    It's very difficult to do it yourself, you can find someone to do it on your behalf, and things are very complicated in various departments.

  5. Anonymous users2024-02-05

    You're the first level, the first level is still the second level. Guangdong's can be exchanged.

Related questions
4 answers2024-05-08

Enterprises applying for the qualification of design and construction integration for the first time need to submit the following materials: >>>More

9 answers2024-05-08

Before the installation of the integrated prefabricated pumping station, the foundation pit excavation construction and support plan need to be prepared in advance, and the geological conditions need to meet the installation requirements of the integrated prefabricated pumping station. >>>More

4 answers2024-05-08

A lot of it just doesn't have any income.

20 answers2024-05-08

First of all, I want to tell you that home improvement has been more difficult to do recently, and it is highly competitive, and it is ...... transparentTo start a company, you must first do a detailed survey of the local market. Income level, consumption concept, positioning of the family, and local occupancy rate ......It's a lot, buddy, I can't explain it. If you really want to open, the process: >>>More

5 answers2024-05-08

Five parts.

The mechatronics system is mainly composed of five parts: the mechanical body, the detection and sensing part, the electronic control unit, the actuator and the dynamic leakage land power source. The mechanical body includes the frame, He Hong mechanical connection, mechanical transmission, etc., which is the basis of mechatronics, and plays the role of supporting other functions in the system, transmitting movement and power. >>>More