Does the fire smoke exhaust duct material need to be sampled and tested on site?

Updated on healthy 2024-05-09
5 answers
  1. Anonymous users2024-02-10

    No, the details are as follows:

    Serial number Product name Sampling quantity Sampling base inspection period.

    Weekdays) 1 Fire Door 1 30 10

    2 Fireproof windows 1 20 10

    3 Fireproof glass 1100mm 600mm 20 pieces 104 Fireproof roller shutter 1 20 5

    5 Fire hydrant box.

    ( with full set of equipment) 1 20 7

    6 Fire hose reels 1 set 20 sets 7

    7 Fire emergency lights 2 sets 50 sets 10

    8 Fire emergency sign lights 2 sets 50 sets 10

    9 Facing type fire retardant coating 5kg 100kg 1010 Steel structure fire retardant coating 5kg 100kg 15 3011 Fire extinguisher 2 sets 50 sets 10

    12 sprinkler heads: 30pcs, 350pcs, 7

    13. Fire dampers and smoke exhaust valves.

    Smoke and fire damper 1 set 30 sets 7

    14 Fire resistant cable 100m 7

    15 Grooved pipe fittings 3pcs 30pcs 7

    16 Stand-alone combustible gas detectors 3 sets 50 sets 7

  2. Anonymous users2024-02-09

    Serial number Product name Sampling quantity Sampling base inspection period.

    Weekdays) 1 Fire Door 1 30 10

    2 Fireproof windows 1 20 10

    3 Fireproof glass 1100mm 600mm 20 pieces 104 Fireproof roller shutter 1 20 5

    5 Fire hydrant box.

    ( with full set of equipment) 1 20 7

    6 Fire hose reels 1 set 20 sets 7

    7 Fire emergency lights 2 sets 50 sets 10

    8 Fire emergency sign lights 2 sets 50 sets 10

    9 Facing type fire retardant coating 5kg 100kg 1010 Steel structure fire retardant coating 5kg 100kg 15 3011 Fire extinguisher 2 sets 50 sets 10

    12 sprinkler heads: 30pcs, 350pcs, 7

    13. Fire dampers and smoke exhaust valves.

    Smoke and fire damper 1 set 30 sets 7

    14 Fire resistant cable 100m 7

    15 Grooved pipe fittings 3pcs 30pcs 7

    16 Stand-alone combustible gas detectors 3 sets 50 sets 7

  3. Anonymous users2024-02-08

    Why not? Definitely, all materials have to be tested.

  4. Anonymous users2024-02-07

    1.Ventilation and smoke exhaust materials do not involve structural safety, and do not belong to the content of witness sampling and inspection as stipulated in the "Jianjian [2000] document". However, the factory certificate, quality certificate, etc. should be reported for inspection in accordance with the supervision regulations.

    Jianjian [2000] document "Provisions on the implementation of witness sampling and inspection for housing construction projects and municipal infrastructure projects".

    2.The main test items of the fire socks macro smoke exhaust fan are: fan flow, fan wheel static pressure, fan power, speed, atmospheric pressure, atmospheric temperature, atmospheric humidity, fan efficiency, noise, etc.

  5. Anonymous users2024-02-06

    1. According to the "Unified Standard for Acceptance of Construction Quality of Construction Projects", the smoke prevention and exhaust sub-division project belongs to the ventilation and air-conditioning sub-division project. The construction content includes: air duct and accessories production, parts production, air duct system installation, smoke prevention and exhaust tuyere, normally closed positive pressure tuyere and equipment installation, air duct and equipment anti-corrosion, fan installation, system commissioning.

    2. In the actual construction process, the fire linkage system should be completed by the fire protection construction unit, and the ventilation and air conditioning unit can cooperate to provide the interface of the fan. In the process of commissioning, if there is a situation where the fan is not linked, the responsibilities are divided as follows: the equipment problem is solved by the ventilation and air conditioning unit, and the alarm system problem is solved by the fire protection unit.

    Third, according to the national standard implementation will not affect the future fire acceptance, the fire construction unit said, pure nonsense, indicating that the unit has no construction capacity, even the minimum acceptance specifications do not understand. Wish.

Related questions
14 answers2024-05-09

The fire smoke exhaust duct generally does not need to be insulated, and the fire air duct requires non-combustible materials. If non-combustible materials are used, then there is no need for fire protection. >>>More

14 answers2024-05-09

It is better to have a network together, after all, if there is a situation, you can give feedback as soon as possible. >>>More

15 answers2024-05-09

People are like this, what you can't get is always the best, so people always deliberately pursue those things that can never be obtained, and often ignore the people around them who have been silently loving them. If you are in true love, then don't break up easily, and don't wait until you lose it to regret it. >>>More

16 answers2024-05-09

There are many requests for talent selection – not just exams. >>>More

14 answers2024-05-09

Describe the idea: first write your own argument, then argue your own argument, and finally summarize your own argument. Examples are: >>>More