PLC training can go to program-controlled automationPLC training, please look for program-controlled automation! Professional, standardized, systematic training to help you become a PLC expert in 60 days! Program-controlled automation is an automation company that undertakes electrical automation program design, electrical and non-standard mechanical design, equipment transformation, and PLC training.
PLC training implements one-to-one on-the-go training, according to each person's progress in a single class, the next class starts from the last progress, so as to ensure the continuity of the course, not because there is no time to fall behind the course, and the learning time also ensures flexibility. People who are receptive can be faster. If the foundation is poor, it can also be longer.
Except for the Spring Festival, it is almost open all year round, which fully satisfies the students to learn at any time. Therefore, in program-controlled training, everyone is under their own control of the completion time. There is no time limit until the real learning is reached....
-
1. Be familiar with the controlled object, formulate the control plan, analyze the process and working characteristics of the controlled object, understand the cooperation between the machine, electricity and hydraulics of the controlled object, and determine the control requirements of the controlled object for the PLC control system.
2. Determine the IO equipment According to the control requirements of the system, determine the input (such as buttons, travel switches, selector switches, etc.) and output devices (such as contactors, solenoid valves, signal indicators, etc.) required by the user, so as to determine the IO points of the PLC.
3 Selection of PLC The selection mainly includes the selection of PLC model, capacity, IO module and power supply.
4 Assign the IO address of the PLC According to the needs of the production equipment site, determine the control button, and select the type, specification and quantity of various input and output equipment such as switches, contactors, solenoid valves, signal indicators, etc.; According to the model of the selected PLC, the comparison table of the input and output devices and the PLC input and output terminals is listed, so that the PLC external IO wiring diagram can be drawn and programmed.
5. Design software and hardware, carry out PLC program design, design and on-site construction of control cabinet (set) and other hardware. Because the program and hardware design can be carried out at the same time, the design cycle of the PLC control system can be greatly shortened, and for the relay system, all the electrical control circuits must be designed before the construction design.
6 Online debugging Online debugging refers to the overall debugging of the program through the simulation debugging. At the beginning, debugging is carried out without the output equipment (contactor coil, signal indicator light, etc.). Using the monitoring function of the programmer, the method of segmented debugging is adopted.
After all parts are debugged normally, they will be put on the actual load for operation. If the requirements are not met, the hardware and programs will be adjusted. Usually, only part of the program needs to be modified, and after all the debugging is completed, it will be delivered for trial operation.
After a period of running, if it works fine and the program does not need to be modified, the program should be solidified into the eprom in case the program is lost.
7. Organize technical documents, including design specifications, electrical installation drawings, electrical component schedules and instruction manuals.
-
Jia Tanchun, Ai Guan, Cui Mo, Xiao Chan.
-
PLC simulation plexus tuning test, you can directly simulate the operation on the program without PLC, preset parameters or close the normally open point to see the program effect. **Debugging, that is, the spring staring PLC must be connected to the PC, and the input of the switch amount is shorted with a wire to see the output effect of the do point after the program is executed.
What do it mean that cycles are divided into pro-cyclical, counter-cyclical, and non-cyclical? An industry has different performance at different stages of the economic cycle, when the economic environment is good, the expression of a certain industry is also better, and the economic cycle rises and falls, this is a pro-cyclical industry, and some industries, when the economic environment is not good, but can buck the trend, such an industry is a counter-cyclical industry, there are also some industries, regardless of the economic environment is ** or **, boom or not, are indifferent to Mount Tai, should rise when it rises, when it falls, they have their own pace, this is no cycle. >>>More
After understanding the basic working principle and instruction system of PLC, you can combine the design of PLC with the actual situation, the design of PLC includes two parts: hardware design and software design, and the basic principles of PLC design are: 1Give full play to the control function of PLC to meet the control requirements of the controlled production machinery or production process to the greatest extent. >>>More
Please refer to the MBA Think Tank Encyclopedia (for more details). >>>More
Learn PLC programming.
First of all, we need to start with the theoretical foundations. >>>More
Why are horrific mass extinctions cyclical? Two hypotheses take you back to the roots!