Winning bids, contracts, drawings, bills of quantities, budget and final accounts (investment review documents must be available for ** investment), and sub-project acceptance; In addition, the completion sheet, the overall acceptance form, the handover list, the instruction manual, the warranty certificate, etc., at the time of completion acceptance.
-
1.Completion data collation, inspection batch, sub-project, concealed project, branch project, unit project inspection documents, completion report.
2.The final accounts of the project and the final accounts of the construction team.
3.Handover of works.
4.Project summary.
-
1. Record form for project completion acceptance.
2. Project completion acceptance report. The completion acceptance report shall include the date of the project application, the construction permit number, the review opinions of the construction drawing design documents, the quality of the survey, design, construction, engineering supervision and other units signed by the quality documents and the original documents signed by the acceptance personnel, the relevant quality inspection and functional test data of the municipal infrastructure and the relevant information that the filing authority considers necessary to provide.
3. Laws and administrative regulations shall be issued by the planning, environmental protection and other departments of the approval document or permission to use the document.
4. The law shall be issued by the public security and fire department for the acceptance of large-scale crowded places and other special construction projects.
5. The project quality warranty signed by the construction unit.
6. Other documents that must be provided according to laws and regulations.
7. "Residential Quality Assurance Certificate" and "Residential Instruction Manual".
1. The completion acceptance can only be carried out after the self-inspection of the construction unit is qualified, and it meets the requirements of the "Interim Regulations on the Completion and Acceptance of Housing Construction Projects and Municipal Infrastructure Projects".
2. The construction unit shall submit the project completion report to the construction unit after the completion of the project, apply for completion acceptance, and sign the opinion by the chief engineer.
3. For the project that meets the requirements of completion acceptance, the construction unit is responsible for organizing the expert group composed of survey, design, supervision and other units to carry out the acceptance.
4. The construction unit must notify the engineering quality supervision agency responsible for supervising the project in writing of the time, place and list of acceptance groups 7 working days before the completion of acceptance.
5. Within 15 working days from the date of acceptance of the completion of the project, the construction unit shall submit the completion acceptance report in a timely manner and file it with the local people's construction administrative department (and filing authority) at or above the county level where the project is located.
6. The engineering quality supervision agency shall submit the project quality supervision report to the filing authority within 5 working days from the date of completion and acceptance.
7. The urban construction archives management department shall pre-accept the project archives according to the requirements of national laws and regulations, and sign the acceptance opinions.
8. After verifying that the completion acceptance filing documents are complete, the filing authority shall sign the acceptance filing opinion and seal it on the completion acceptance filing form. The project completion acceptance record form shall be in duplicate, one shall be kept by the construction unit, and one shall be kept for the record by the filing authority.
-
The completion acceptance of the construction project needs to be recorded: it must meet the specified quality standards of the construction project, and be approved as qualified or excellent by the quality supervision agency; There must be complete engineering technical and economic information, signed engineering warranty certificate, and necessary approach test report; The project warranty certificate must be signed, with a complete engineering technical file and as-built drawings.
[Legal basis].Article 16 of the Regulations on the Quality Management of Construction Projects.
After receiving the completion report of the construction project, the construction unit shall organize the design, construction, engineering supervision and other relevant units to carry out the completion acceptance. The following conditions shall be met for the completion and acceptance of construction projects:
1) Complete the construction project design and the contents agreed in the contract;
2) Have complete technical files and construction management materials;
3) There are main building materials, building accessories and equipment used in the project in the early spring approach test report early drying;
4) There are survey, design, construction, engineering supervision and other units signed by the quality of the documents;
5) Lusendong has a project warranty signed by the construction unit.
If the construction project experience is qualified, it can be delivered.
-
Application materials for the completion and acceptance of housing construction projects:
1. One application form for the completion and acceptance of housing construction projects and municipal infrastructure projects;
2. A copy of the construction project planning permit;
3. A copy of the construction permit of the construction project;
4. A copy of the construction project planning acceptance certificate;
5. A copy of the fire protection acceptance opinion;
6. The original report of the completion and acceptance of the construction project;
7. The original quality supervision report of the construction project;
8. The original construction project quality warranty signed by the construction unit;
9. The original of the "Residential Quality Assurance Certificate" and the "Residential Instruction Manual" of the residence;
10. The original certificate that there is no arrears in the project payment or the original certificate that the payment has been made according to the construction contract;
11. 4 copies of the record for the completion and acceptance of the construction project;
12. A copy of the acceptance certificate of lightning protection device;
13. A copy of the invoice for the payment of urban construction supporting fees;
14. For projects with ** investment or ** shares, the final accounts of the project reviewed by the Finance Bureau shall be provided, and the "Approval of the Final Accounts of the Project Completion" issued by the Finance Bureau shall be attached;
In the application requirements, for the materials that can be submitted in copy, the construction unit must add the words "the content of this copy is checked with the content of the original" in the copy, affix the seal of the unit, and provide the original for review.
If the project invited the supervision company, the supervision company should organize the five responsible entities and the construction department to hold an acceptance meeting, unanimously agreed to accept, within 7 days by the quality and safety station issued a quality inspection report, need to apply for the construction administrative department within 15 days for the record, otherwise according to the "record management regulations" will be re-organized acceptance or administrative penalties. By the way, according to the above application materials (the construction departments are slightly different) after the preparation is complete, go directly to the local government service center Construction Bureau window, after the window is accepted, the window staff will handle all the procedures within the statutory time limit, then you only need to wait for the record to be taken.
-
1) Before the completion and acceptance of the project, the construction unit shall apply to the filing department for the "Housing Construction Project Completion Acceptance Record Form";
2) After the completion and acceptance of the project, the construction unit shall fill in the "record form" according to the requirements and affix a valid official seal;
3) Within 15 days after the completion and acceptance of the project, the construction unit shall timely bring the "record form" and the required documents and materials to the record department to submit an application for the acceptance of the remaining work of the project;
4) The filing department conducts a preliminary review of the documents;
5) If the preliminary examination meets the requirements, the filing department shall review the content of the documents. For the trembling collapse project that seriously does not meet the requirements, the "Notice of Re-completion Acceptance" shall be issued, and the construction unit must re-organize the completion and acceptance of the project and re-apply for the record;
6) Review the project that meets the requirements, and the filing department shall report to the relevant leaders for review, sign and agree to the filing opinion, affix a valid official seal, and notify the construction unit to receive the "record form".
-
Project completion acceptance record form (in quadruplicate);
Project completion acceptance report;
construction permits;
Review opinions on construction drawing design documents;
Project completion report of the construction unit;
Supervision unit project quality assessment report;
Survey and design quality inspection report;
Approval documents from urban and rural planning departments;
Approval of the use of documents by the fire department;
Approval of the use of documents by the environmental protection department;
Inspect the project completion acceptance opinion signed by the personnel of the inspection team;
Unit project quality acceptance documents:
Foundation inspection record and pile foundation testing and certification report;
Acceptance records of key parts such as foundation and main body;
Completion and acceptance records of unit project quality.
Municipal engineering quality inspection and functional test data;
Construction project file acceptance permit;
Quality warranty signed by the construction unit;
"Residential Quality Assurance Certificate" and "Residential Instruction Manual" for commercial housing;
Other relevant information.
Completion acceptance. It refers to a comprehensive acceptance of all engineering projects after the completion of the project.
After the completion of the construction project, the development and construction unit, together with the design, construction, equipment unit and the engineering quality supervision department, will conduct a comprehensive inspection on whether the project meets the requirements of planning and design, as well as the quality of construction and equipment installation, and obtain qualified information, data and vouchers for completion.
It is an important part of the comprehensive assessment of the construction work, checking whether it meets the design requirements and the quality of the project, and plays an important role in promoting the construction project (project) and the commissioning of the cavity cover, giving full play to the investment effect and summarizing the construction experience. It should be pointed out that the completion acceptance is based on the foundation of the phased acceptance, and the projects that have completed the acceptance before are generally not re-accepted when the house is completed and accepted.
-
First of all, you should understand what is completion acceptance. Completion acceptance refers to a comprehensive acceptance of all engineering projects after the completion of the project. "Comprehensive acceptance" not only refers to the acceptance of project quality, but also includes environmental protection acceptance, fire protection acceptance, lightning protection acceptance and other projects.
In addition, the acceptance record of the completion of the housing construction project is to be carried by the construction unit to the ** department for the record with the relevant acceptance documents in the case of the special acceptance, and obtain the "Project Completion Acceptance Record Form".
Therefore, the information that needs to be submitted is mainly as follows:
1) Project quality acceptance: the project quality acceptance is generally supervised and accepted by the local quality supervision station, and the relevant information is submitted to the quality supervision station, and the quality supervision station issues the "engineering quality supervision report", which is the necessary material to prove that the quality of the project is qualified, and it is also the necessary material for the completion acceptance record;
2) energy-saving acceptance: energy-saving acceptance is generally supervised and accepted by the local wall reform office, and the wall reform office issues the "project energy-saving acceptance report" after passing the acceptance, which is the necessary material to prove that the project energy-saving acceptance is qualified, and it is also the necessary material for the completion acceptance record;
4) Fire acceptance: environmental protection acceptance is generally supervised by the local fire bureau, in addition, fire acceptance not only involves housing construction projects, but also involves the construction of municipal fire protection facilities, so coordination should be done in the acceptance. The construction party submits relevant information, and the fire bureau issues the "Fire Protection Acceptance Opinion" after passing the on-site acceptance;
5) Lightning protection acceptance: lightning protection acceptance is generally supervised by the local meteorological bureau, the construction party prepares relevant information for the construction of the reed, and the meteorological bureau issues the "lightning protection acceptance report" after passing the on-site inspection and acceptance;
6) Planning acceptance: Planning acceptance is generally supervised by the local planning bureau; The planning bureau will find relevant surveying and mapping units to measure the construction area and building height, and will issue the "Project Planning Acceptance Approval Document" after passing the qualification.
-
According to the division of labor of the municipal department, the Municipal Administrative Examination and Approval Service Bureau is responsible for the completion and acceptance of housing construction projects. What materials do you need to prepare for the completion and acceptance of housing construction projects? The Municipal Administrative Examination and Approval Service Bureau answered this.
The following materials are required for the completion and acceptance of housing construction projects: 1. The housing construction project completion acceptance record form is in duplicate; 2. A project completion acceptance report; 3. Planning and acceptance opinions; 4. Opinions on fire protection acceptance of construction projects; 5. The project quality warranty signed by the construction unit. 6. Civil air defense completion acceptance record documents; 7. The residential project should also submit the "Residential Quality Assurance Certificate" and the "Residential Instruction Manual"; 8. A copy of the construction permit; 9. A copy of the construction project planning permit.
-
1. Record form for completion acceptance of the project;
2. Project completion acceptance report. The completion acceptance report shall include the date of the project application, the construction permit number, the review opinions of the construction drawing design documents, the quality of the survey, design, construction, engineering supervision and other units signed by the quality documents and the original documents signed by the acceptance personnel, the relevant quality inspection and functional test data of the municipal infrastructure and the relevant information that the filing authority considers necessary to provide.
3. Laws and administrative regulations shall be issued by the planning, environmental protection and other departments of the approval document or permission to use the document.
4. The law shall be issued by the public security and fire department for the acceptance of large-scale crowded places and other special construction projects.
5. The project quality warranty signed by the construction unit.
6. Other documents that must be provided according to laws and regulations.
7. "Residential Quality Assurance Certificate" and "Residential Instruction Manual".
Yes? To be honest, you're dangerous enough here, at least the ones for structural acceptance are indispensable. In the later stage of decoration, the certificate and inspection list of all materials are kept, the airtightness test is kept, and the others are nothing.
1. Introduction to the project.
2. Project cost. >>>More
Filing and registration form of construction project completion statement. >>>More
The completion acceptance stage is the final overall quality acceptance stage, and I am afraid that you may be involved in the information that happened before, so basically all the information during the construction period should be prepared, including: >>>More
1.The heat pump unit was put into trial operation on a stand-alone basis. >>>More