2.The construction organization plan is submitted for review. 3.
Personnel settings are submitted for review. 4.The project manager appoints and submits the report for review.
Gardens are these, is less than other projects, now in the garden project is not required to provide a safety permit, in Guangdong for example, has been canceled.
-
The annex to the commencement application form includes a copy of the project planning conditions, a copy of the survey and design documents, a copy of the guarantee measures, and a copy of the safety technical measures.
1. A copy of the planning conditions of the project: including the project feasibility study report and environmental impact report of the project, so that the competent department can review it.
2. Copies of survey and design documents: including architectural design documents, civil design documents, etc.
3. Copies of guarantee measures, safety technical measures, etc.: mainly including documents for safety management on the construction site, such as safety certificates for fire and hazardous chemicals.
The specific content of the attachment to the commencement application form needs to be determined according to the specific situation, and it will change with different projects. It is recommended to understand the specific requirements of the competent department for review in advance before filling in the application form, and prepare in strict accordance with the requirements.
-
Construction permits, as well as qualifications.
-
1. Commencement report.
2. Construction organization design.
3. Enterprise qualification.
-
1. Commencement report.
2. Construction organization design.
Approved. 3. Enterprise and personnel qualifications.
4. The main materials and equipment are in place.
5. The formulation of the system of quality and technical management; Quality control.
Technical measures. 6. All procedures before the start of construction have been in place, quality and safety supervision procedures, construction permits, etc.
-
Greening requires cranes, shovels, straw ropes, poles. Hard needs: trolleys, formwork, mixers, rammers, vibrators, rebars.
-
1.The approval procedures for the land for the construction project have been handled.
2.In urban planning areas, planning permits have been obtained.
3.If demolition is required, the demolition progress meets the construction requirements.
4.The construction enterprise has been identified.
5.There are construction drawings and technologies that meet the construction requirements.
6. Specific measures for project quality and safety.
7.Funding for the construction has already been secured.
8.Other conditions (supervision, fire protection, etc.).
The various documents listed above for review, look at the place, provide the original or copy, etc
Which province are you, it's different from place to place.
If you want to learn systematically, you can consider signing up for a live online class, and recommend CGWANG's online class. The teacher speaks carefully, you can watch it back after the class, and there are also the same type of recorded classes that you can learn for free (give away lifelong VIP). >>>More
Hello: Yes.
After two years of college graduation, you can apply for the postgraduate examination, and the postgraduate examination is generally not limited to the major, and you can take the cross-examination. However, general colleges and universities may be stricter, for example, they do not accept junior college students, or they do not accept junior college students. However, there are many schools that do not require it, and you can generally apply for it. >>>More
The first part: engineering supervisor resignation application Dear leader: as the company's engineering supervisor, I regret to resign at this time, I know very well that resignation at this time is not conducive to the construction site, the resident office is at the time of employment, the current project has entered the middle of the second phase, and the construction period is urgent; It is precisely in consideration of the rationality of the work arrangement, in line with the attitude of being responsible for the project and the leadership, and in order to prevent the work of the resident office from being caused by me, I solemnly submit my resignation to the unit. >>>More
In the process of growth and development, various garden trees have different requirements for environmental factors such as light, moisture, temperature, and soil. In the configuration of garden trees, only by meeting these ecological requirements of garden trees can they grow normally, be robust and maintain stability for a long time, and fully demonstrate the design intent. To meet these ecological requirements of garden trees, one is to be suitable for the right tree: >>>More