What is included in the decoration half package? Which one should I look for?

Updated on home 2024-05-21
7 answers
  1. Anonymous users2024-02-11

    1. Half package is a way between clear package and half package, the construction party is responsible for the construction and the procurement of auxiliary materials, and the main materials are purchased by the owner. Advantages of semi-packaged repair: choose the main part to grasp the initiative, the main building materials to buy by themselves, both in safety and economy are more assured.

    The auxiliary building materials are allocated by the construction team, and a lot of effort is saved in small things. Disadvantages of semi-package repair: Half package still has to spend a lot of time to run the building materials market, can not be easily decorated, when signing the contract, we must clearly indicate which by the decoration company to provide, which by the owner himself, otherwise it is easy to be in the later stage of the decoration company to take advantage of the loophole, so that they have to buy everything, very tired and passive.

    The semi-packaged repair method is suitable for busy but quality-seeking people, but the premise is also to have a certain professional knowledge of decoration and building materials. 2. The whole package is also called contract labor and materials, and all material procurement and construction are responsible for the construction party. Advantages of full package repair:

    It is relatively time-saving, labor-saving and worry-free, and the responsibilities and rights are relatively clear. Once there is a quality problem in the decoration, the responsibility of the decoration company cannot be shirked, because they are responsible for the materials, and they can directly find them if there is any problem. Disadvantages of full package repair:

    The cost is higher. Due to the variety of materials and types, the decoration household knows very little, and it is difficult to identify once the decoration company is false, or joins hands with the material supplier to deceive the owner. All-inclusive is suitable for people who are very busy or financially affluent, because all-inclusive is to save trouble and spend more money.

    3. It is best to clear the difference between decoration and half package, after all, no matter which way you take, you must understand the free services that businesses can provide, maybe these services can help you save a lot of money, including material costs, labor and machinery costs, profits, etc., in addition to the company's operating expenses, advertising costs, designer commissions, etc., only sixty percent of the money paid by customers can be spent on the house.

  2. Anonymous users2024-02-10

    1. Half package includes indoor structure renovation (such as wall demolition or new wall) 2. Half package includes hydropower renovation construction (water supply and drainage design and installation, circuit design and installation, sanitary ware installation, etc.) 3. Half package includes mud construction (backfill, ground leveling, waterproof treatment, wall tiles and floor tiles, etc.) 4. Half package includes wood construction (ceiling, modeling production and some on-site production of furniture, etc.) 5. Half package includes paint construction (wall, wallpaper or latex paint, furniture paint, etc.) Many decoration companies plan to also include the purchase of some auxiliary materials, mainly: cement, river sand, gypsum board, modeling plates and small miscellaneous parts (such as nails, bolts, universal glue, etc.), but these auxiliary materials are varied, but also pay attention to the contract agreement.

  3. Anonymous users2024-02-09

    Semi-packaged repair refers to the decoration company on the basis of the original theory to assist the owner to complete part of the decoration work, mainly compared with the full package repair. The ** of semi-packaged repair is relatively lower than that of full-package repair, but the owner needs to undertake some engineering quantity or creative solutions. The following are the services that should be included in the decoration company in the semi-package repair:

    The specific decoration of the house can be calculated here, just enter the area + city, calculate the decoration in 3 seconds, know the real ** in advance, and easily grasp the decoration company: [Click here, free decoration**].

    1.Procurement of main materials.

    In semi-packaged repairs, the decoration company is responsible for the procurement of main materials and equipment, including wall and floor tiles, doors and windows, wood veneer, lamps, toilets, faucets, bathroom cabinets, etc., and the selection contractor usually provides the owner with a list of materials and brand recommendations, which the owner can choose according to his needs.

    2.Decoration design.

    Including preliminary measurement, two on-site communication, rendering design, etc., it is the process of collecting needs, optimizing space, and providing creative solutions for customers. Decoration design is an important part of semi-package repair. The owner needs to provide their own creativity and ideas, as well as the structural drawings of the building, and then communicate with the designer to finalize the design plan.

    3.Engineering construction.

    In semi-packaged repair, the decoration company is responsible for the construction of personnel and tools, including civil engineering, hydropower, carpentry, bricklayer and other construction work.

    4.Wood veneer fabrication and installation.

    In the semi-package repair, the decoration company needs to install wood veneer, provide wood veneer processing and production services, and be responsible for installation.

    5.Hydropower retrofit.

    In the semi-package repair, the decoration company is responsible for coordinating and handling the water, electricity, gas pipelines, etc. in the design plan, as well as installing and setting up circuits, lamps, switches, etc., and providing supplies and personnel.

    In short, the semi-packaged repair service includes the procurement of main materials, decoration design, engineering construction, wood veneer production and installation, and water and electricity renovation. Therefore, in the semi-package repair, the decoration company can help the home decoration to better arrange the time and reasonable decoration design and material procurement, and can also directly supervise and manage the process to ensure the quality and progress of the decoration.

    Kunming - [Kunming Decoration Strategy Guide].

    Suzhou - [Suzhou Decoration Strategy Guide].

    Hefei - [Hefei Decoration Strategy Guide].

    Fuzhou - [Fuzhou Decoration Strategy Guide].

    Beijing - [Beijing Decoration Strategy Guide].

    Dalian - [Dalian Decoration Strategy Book].

    Hangzhou - [Hangzhou Decoration Strategy Guide].

    Shanghai - [Shanghai Decoration Strategy Guide].

    Tianjin——[Tianjin Decoration Strategy Guide].

  4. Anonymous users2024-02-08

    Many friends who want to decorate are still unclear, what is included in the half package? What materials do I want to buy?

    The semi-package system we refer to is: the decoration company is responsible for all the hard decoration of water and electricity, bricklayers, carpentry, and painting.

    Labor, design, auxiliary materials in the construction process, etc. That is to say, the owner of the main material buys, and the auxiliary material decoration company is responsible. All the invisible are auxiliary materials, surface energy.

    Whatever is seen is counted in the main material.

    To be more clear, you have found a decoration company, except for the contract bid, the rest is for you to buy.

    But there must be some friends who don't understand, what are the auxiliary materials? What are the main materials? So today, let's talk in detail about what you need to buy independently for those who have chosen a half-pack.

    Generally speaking, the auxiliary materials of the decoration company package include:

    1. Hydropower: all wires, pipelines, auxiliary materials and labor;

    2. Bricklayers: all cement, sand, bricks, accessories and labor;

    3. Carpentry: all boards.

    Accessories and labor (if you want to build wooden furniture cabinets on site, they are also counted in half a package, otherwise it will be more troublesome in the later stage) except for hardware.

    4. Paint: all paint, artificial.

    Next is what the owner needs to buy:

    Home improvement and building materials Air switch.

    Switches and sockets, water valves, integrated ceilings.

    floor tiles and wall tiles. Wooden floors, baseboards.

    Curtain track, wallpaper + base film, pipe hinge.

    Threshold stone. Window sill stone, shoe cabinet stone, finished door, door cover, door lock.

    Handles, slides, baseboards, floor drains, soundproof cotton, caulk, beauty sewing agent.

    Hardware pendants, drying racks.

    Kitchen & Bathroom Cabinets, sinks, range hoods, stoves, water heaters, toilets.

    Bathroom cabinets, mirror cabinets, bath bombs, shower partitions, water retaining strips, washbasins.

    Faucets and installation accessories, showers, floor drains, sill stones, bathroom hardware pendants.

    Lamps and lanterns Main lamp (or no main lamp), wall lamp, floor lamp, bedside lamp, table lamp,

    Cabinet lights, shoe cabinet lights, downlights, spotlights, light strips.

    Furniture Beds, mattresses, wardrobes, wardrobe handles, full-length mirrors, dressing cabinets, chairs, bedside tables, bookcases.

    Desks, wall cabinets, sofas, sideboards, coffee tables, carpets, curtains.

    TV cabinets, shoe cabinets, dining tables and chairs, sideboards, wall shelves.

    Home appliances TV, refrigerator, washing machine, air conditioner, dishwasher, kitchen.

    Microwave oven. Oven, water purifier.

    Robot vacuum cleaner.

    The above list is different according to the decoration of each company, the main material will be different, and different decoration companies will also be different.

    In general, if you choose a half pack, you will have to buy floor tiles, wall tiles, tiles, doors, cabinets, sanitary ware, locks, lamps, faucets, electrical appliances, wardrobes, bookcases, furniture, curtains, hardware, etc.

  5. Anonymous users2024-02-07

    "Semi-packaged repair" usually refers to the owner's purchase of a part of the decoration materials, and the decoration project is constructed and managed by the decoration company or construction team. The range of fittings and trim in semi-packaged repairs varies from region to region and company to company. But it generally includes the following:

    1.Foundation construction: including wall treatment, ceiling treatment, ground treatment, etc.

    2.Carpentry: including cabinets, wardrobes, doors and windows, decorative woodwork, etc.

    3.Coatings: including primers, topcoats, paints, etc.

    4.Tiles: including floor tiles, wall tiles, mosaics, etc.

    5.Bathroom: including sanitary ware, shower room, etc.

    6.Circuits: including sockets, lamps, switches, distribution boxes, etc.

    7.Detail decoration: such as repairing the TV background wall of the hole, making ceiling lights, playing lace lines, etc.

    It should be noted that the scope of decoration projects of different semi-packaged repair companies is different, and the owner needs to communicate in detail with the decoration company or construction team before signing the construction contract according to the actual situation, so as to understand the scope of the decoration and the content of the decoration service.

  6. Anonymous users2024-02-06

    The decoration half package is generally included as follows:

    1. Structural transformation.

    The renovation of the interior structure, such as the demolition of walls or the construction of new walls, will be carried out by the renovation company.

    2. Hydropower transformation.

    Responsible for hydropower transformation, hydropower renovation is the key matter in the whole house decoration, such a renovation project needs to be completed by a professional team of nuclear training, so the hydropower transformation needs to include drainage design and installation, circuit design and installation and indoor sanitary ware installation.

    3. Masonry construction.

    Responsible for mud construction, mud construction work is also a key part of the decoration process, including ground leveling, backfilling, waterproofing treatment, tiling walls and floor tiles, etc., are responsible for the decoration company.

    4. Carpentry paint.

    Responsible for carpentry and painting, carpentry work requires experienced masters to make, so the decoration company will be responsible for the production of ceiling modeling in the house and some on-site production of furniture; Paint work is also included in the decoration company, responsible for the installation of paint or wallpaper on the walls, furniture, etc. in the home.

    5. Procurement of auxiliary materials.

    Responsible for the procurement of auxiliary materials, including cement, sand, plaster, interface agent and other basic materials, as well as some small miscellaneous parts (nails, bolts, all-purpose glue, etc.) needed for the production of molding.

    Owner Responsibility:

    In the process of decoration half package, the owner is responsible for the purchase of the main decoration building materials, and in the process of decoration, it is necessary to ensure that the construction team can get the desired decoration materials in time.

  7. Anonymous users2024-02-05

    It is necessary to choose a decoration company when decorating a house, and now there are many decoration companies that will have a half-package or full-package project. When choosing half a pack, many people don't know about this knowledge, and they don't knowWhat is included in the decoration half package? 1. Structural renovation is responsible for the renovation of the indoor structure, such as the demolition of the wall or the construction of the new wall, which will be completed by the decoration company.

    2. Hydropower transformation. Responsible for hydropower transformation, hydropower transformation is the key matter in the whole house decoration, such a project needs to have a professional team to complete the slide, so the hydropower transformation needs to include drainage design and installation, circuit design and installation and indoor sanitary ware installation.

    3. Masonry construction. Responsible for mud construction, mud and water rot construction work is also a key part of the decoration process, including ground leveling, backfilling, waterproofing treatment, and tiling walls and floor tiles, etc., are responsible for the decoration company.

    4. Carpentry paint. Responsible for carpentry and painting, carpentry work requires experienced masters to produce, so the decoration company will be responsible for the production of ceiling modeling in the house and some on-site furniture; Paint work is also included in the decoration company, responsible for the installation of paint or wallpaper on the walls, furniture, etc. in the home.

    5. Procurement of auxiliary materials. Responsible for the procurement of auxiliary materials, including cement, sand, plaster, interface agent and other basic materials. There are also some small miscellaneous items (nails, bolts, all-purpose glue, etc.) that are needed to make the molding

    What are the precautions for decoration and semi-package repair?

    1. First of all, it is clear that the half-package, the half-package generally refers to the "four links and one leveling" project of the house, which mainly includes water, electricity, ventilation, network and ground and wall leveling projects.

    2. The water in the half package mainly refers to the water pipe laid to the position that needs to be used according to the requirements of the owner, including two parts: water outlet and water inlet, generally including the water in the kitchen, the toilet in the bathroom, the shower room, the mop pool, the washstand, and the washing machine.

    3. The ventilation in the half-package has been connected by the general developer, which is mainly related to the kitchen stove and natural gas water heater.

    4. The energization in the half-package is relatively easy to understand, and all the electricity to be used must be energized, which means that the wires are laid, the plug is set, the switch is set, etc.

    5. The leveling projects in the half-package mainly include: living room, main and secondary bedrooms, and balcony wall leveling, mainly referring to latex paint engineering (some people will ask to paint Nippon paint), background wall engineering, ceiling engineering in the design scheme, and wallpaper engineering of some owners.

    6. Other parts of the half-package project that must be completed by the decoration company include the door set foundation, which is to make the place that needs to be installed into the finished door to the extent that the finished door can be installed directly.

    The half-package project is a choice for every family, and everyone needs to know what to pay attention to when choosing. The above is for you to introduce what the decoration half package includes and what are the precautions for the decoration half package repair, and this is the end of it.

Related questions
8 answers2024-05-21

The price per square meter of semi-packaged repairs will be affected by a number of factors, including location, housing condition, decoration standards, material selection and the pricing strategy of the renovation company. Therefore, it is difficult to give accurate uniform standards. >>>More

7 answers2024-05-21

We all know that decoration is a very deep knowledge, the development of the decoration industry has risen a lot of decoration methods, now the decoration has the concept of half-package repair or full-package repair, half-package repair is a way between the clear package and the half-package, the construction party is responsible for the construction and the procurement of accessories, the main materials are purchased by the owner. So what are the items included in the home renovation half package budget? Responsible for indoor structure renovation (such as wall demolition or new wall), then Responsible for hydropower renovation construction (water supply and drainage design and installation, circuit design and installation, sanitary ware installation, etc.), Responsible for mud construction (backfilling, ground leveling, waterproof treatment, wall tiles and floor tiles, etc.) Responsible for wood construction (ceiling, modeling production and some on-site production of furniture, etc.) Responsible for paint construction (wall, wallpaper or latex paint, furniture paint, etc.) Some of the above parts may be installed by the seller, such as sanitary ware. >>>More

6 answers2024-05-21

If you want to know the specific decoration**, you can use the "decoration artifact" ** device to calculate, just enter the area + city, immediately calculate the local decoration**, list the detailed list of 102 decorations, so that you don't have to worry about overspending on the decoration, click here to start calculating: [3 seconds to get the local decoration**]. >>>More

6 answers2024-05-21

For many people who are about to decorate, they generally want to understand what the decoration half package is and how to calculate the decoration half package, so as to have an understanding of the concept of half package repair and the decoration cost. Since you want to know these information about the decoration half package, let me introduce to you what the decoration half package is and how to calculate the decoration half package. >>>More

4 answers2024-05-21

Half package decoration method, is currently more people use a decoration method, also known as light industry accessories refers to a way between the package and the whole package, the construction party is responsible for the construction and the procurement of accessories, the main materials are purchased by the owner, such as cabinets, locks, hardware, flooring, sanitary ware, tiles, floor tiles, coatings, etc., some other accessories have the construction team to arrange, such as nails, cement, sand, etc. First, the foundation project keeps an eye on the wall and roof The wall and roof construction of the foundation engineering part are often designed to be trapped. "According to the normal procedure, the renovation personnel should inspect the house before entering the site, and the focus of the foundation engineering part is whether the walls and roofs are inclined and uneven. >>>More