    Installation method of household radiators.

    Household radiator surface installation process.

    Six steps:1Pipes are laid according to the condition of the house.

    2.Press the radiator.

    3.Install a wall-hung boiler.

    4.Perform a pressure test on the radiator system.

    5.The customer conducts inspection and acceptance.

    6.The radiator system is installed.

    Household radiator concealed installation process:

    Nine steps:1Roughly plan where the pipes pass through the house.

    2.Groove the floor or wall.

    3.Install the water collector and manifold.

    4.Perform a pressure test on the radiator system.

    5.Follow the decoration schedule.

    6.Install radiators.

    7.Install a hanging fireplace.

    8.The customer inspected and accepted the whole system of the radiator.

    9.The radiator system is installed.

  2. Anonymous users2024-02-08

    1. Tandem installation: This installation is very pipe-saving, and a single pipe is OK to go around the house, but it is easy to appear that the temperature of the radiator at the end of the heating cannot go up.

    2. Parallel installation: water supply and return water pipelines go up in the room, and each group of radiators is connected from the water supply and the water, so that the temperature difference between the front and rear is not large, and most of the installation methods are used at present.

    3. Octopus installation (need to install a water separator): such an installation, each group of heating is independent, each group of temperature difference is very small, the disadvantage is that it is necessary to purchase additional water separators, and the water supply pipes and return pipes are insulated, which are buried underground. The amount of construction is large and the cost is high.

  3. Anonymous users2024-02-07

    The same journey is different, simply put, it is called first supply and then return, that is, the return water of the first group of radiators at the front end does not circulate to the main pipeline for the time being, but continues to go down, connecting the return pipe of the next group of radiators, and so on....Pull a return line from the end radiator and return it to the return pipe of the main pipe. The water flow rate of each group of radiators in the system is basically the same, and the system is very balanced, and there is generally no phenomenon of no heat at the end. It can be said that it is a way to balance the hydraulic system well.

    Now the common pipe way is also single-tube series, which is characterized by low material usage, relatively weak labor intensity, and shorter transformation time. The water of the whole system passes through the first set of radiators of the system, then the second group, then the third group ......, so the water temperature is gradually decreasing in the order of series. Under the same conditions, the temperature of the first and last two groups of heating to the room can be more than 2 degrees, in order to adjust the water temperature of a single group of heating, the inlet and outlet of the radiator at the front end of the water must add a bypass valve, some use a three-way regulating valve, and some use three gate valves.

    If a single-pipe tandem system is not bypassed, turning off one set of heaters will cause the entire system to be immediately interrupted, and all other heaters will not be hot. Moreover, the number of radiators that need to be configured in a single tube series is larger, and in order to meet the needs of the system circulation, the main body of this heating system also needs to be relatively coarse.

    To install hot water radiators in a home independent heating system, there are the following recommendations:

    1. Material selection: If the family is 24 hours a day, such as the elderly and children, it is recommended to choose a cast iron radiator with a plastic appearance, which is comfortable for heat dissipation and good thermal inertia (the radiator is slow); If it is a phased heating, it is recommended to choose steel, steel aluminum, copper aluminum or die-cast aluminum radiators, which have various styles and fast heating and heat dissipation speed;

    2. Installation location: It is recommended to install it under the window sill, which can effectively prevent the cold air coming in from the window; The radiators should be evenly arranged indoors;

    3. Pipeline layout: For newly renovated houses, water separators can be used to lay pipes according to the octopus type (all buried in the ground), and each group of radiators can be independently controlled; The old house should be arranged according to the original heating installation position and pipe direction, and try to choose a pipe layout method that can control each radiator individually, such as single-pipe spanning, double-pipe system, etc.;

    4. It is recommended to install valves at the inlet and outlet of each group of radiators to facilitate maintenance and control; Each group of radiators can be equipped with a temperature control valve to automatically control the indoor temperature;

    5. Generally, according to the 100 square meters of house, the independent heating system of each household, the gas wall-hung boiler + pipeline + valve + radiator, the cost is about 15,000 yuan;

  4. Anonymous users2024-02-06

    Answer 1, when opening the radiator package, be sure to carefully check whether the radiator type, color and accessories in the packaging box are complete, regular radiator manufacturers such as Rubens radiator provide free running air, plugging, expansion nails, hooks and other standard accessories. 2. Be sure to install the water inlet valve and the return valve, don't ignore it in order to save money, otherwise it will be difficult to repair the radiator after it fails. 3. Strictly install the installation legend of the radiator for installation, first smash the expansion screw and hook into the wall, install the radiator with running air, plugging and valve (you can wrap some raw material tape in an appropriate amount), and then put the radiator on the hook, and then connect the valve with the pipe, and the radiator installation will be successfully completed.

    Precautions: a. The fixed radiator pendant needs to use a level ruler to correct the orientation of the radiator to ensure the horizontal and vertical of the radiator and ensure that the connection between the pipe fittings and the radiator is accurately connected; b. Do not open the protective film of the inner packaging of the radiator during the installation process to avoid damaging or scratching the paint film. 4. Pressure test:

    Close the main connection valve, open the radiator inlet valve with pressure test equipment to test, the test pressure should be times of the normal use pressure, and not less than the test pressure of the entire community pipe network, 3-5 minutes without leakage is qualified.

    Hope it helps, dear

  5. Anonymous users2024-02-05

    Seven times the final installation method to find a professional master to install He knows this better.

  6. Anonymous users2024-02-04

    The installation of household heating sheets can be considered from the aesthetic and safety aspects, the specific installation method, the first step: field measurement to determine the model of the radiator, the number of pieces, the way of water inlet and outlet and the specific installation location, and sign a contract with the seller;

    Step 2: Sign a construction agreement with the radiator construction unit to ensure the quality of construction, which is generally installed by the radiator seller.

    Precautions for the purchase of household radiators:

    1.When choosing a radiator brand, you should choose a manufacturer with a certain strength, so that the quality and after-sales of the radiator are guaranteed, and you can buy it with confidence.

    2.If you buy radiators, don't pay too much attention to **, the old saying is: you get what you pay for.

  7. Anonymous users2024-02-03

    There are 3 ways to install radiators.

    The first is the tandem type: it is more manage-saving, but it is easy to have the phenomenon that the heat at the end of the heating cannot go up. The second is the parallel type:

    The water supply and return pipes are in the same room, and the temperature difference between the front and back will not be very large. The third is the octopus type: each group of heating is designed to be independent, the temperature difference is relatively small, but the construction amount is relatively large, and the cost price is high.

    For heating in the family, at this stage, many friends like to choose radiators, but it is necessary to pay attention to the problems that need to be paid attention to in the process of installation of radiators and after the installation is completed, and the radiators must be kept about 100mm away from the wall when installed to ensure its heat dissipation.

    How to install radiators

    When opening the package, please carefully check whether the radiator model, color, and accessories in the package are complete, including 1 plug, 1 air release valve, and 3 brackets. Inlet and outlet valves must be installed, do not ignore these processes to save money, and the pipeline should be modified according to the installation drawings in this booklet when installing.

    Pressure test: close the main connection valve, open the radiator inlet valve with pressure test equipment to test, the experimental pressure should be 1.5 times of the normal use pressure, and not less than the experimental pressure of the entire community pipe network, 3-5 minutes without leakage is qualified. The fixed radiator pendant should be positioned with a horizontal ruler effect to ensure that the radiator is horizontal and vertical, and the connection between the pipe fittings and the radiator is accurately connected.

    Please do not open the protective film of the inner packaging during the installation process, so as not to damage or scratch the paint film, the requirements of pipeline installation or pipeline transformation: when selecting connecting pipes, you should choose special plumbing products approved by the relevant national departments, and the working pressure of pipes and fittings should be large in the experimental pressure of the pipe network system, if the pressure of the pipe network cannot be determined, please choose the pressure of 12kg cm2 pipes and pipe fittings.

    The radius of the curvature treatment of the pipe shall not be less than 4d, and the control valve shall be installed for each group of radiator inlet and return pipes, and the distance between the radiator extension and the riser shall not be less than 200mm, and the pipe clamp shall be installed every 300mm, and the casing must be installed if the pipe needs to pass through the wall.

  8. Anonymous users2024-02-02

    Before the installation and planning of the radiator, we first need to carry out on-the-spot measurements at the beginning of the decoration or decoration, not only to measure the specific size of each room, but also to carry out overall planning to ensure that all houses can be heated, and to carry out door-to-door measurements, and to make a meticulous record of each size, so that it can be better installed.

    When we have completed all the measurement results, we can customize it according to our actual situation, determine and customize the style and color of the radiator you like in advance, and it is best to be consistent with the decoration style, so as to greatly increase the effect after decoration. If the old house is renovated, the installed radiator needs to be removed and the new radiator reinstalled.

    If the position of the radiator has shifted at this time, or the radiator in the kitchen such as the bathroom needs to be changed, the open pipe is changed to the dark pipe, and everyone needs to plan well in advance to lay a good foundation for the next planning. Then groove and open the pipe in advance, so that you can do waterproofing and brick-laying work, and these works must be planned in advance, as far as possible before installation, so as to achieve a very good effect.

    Customized cycle of radiators.

    After we have completed the above steps, we also need to understand the custom production cycle of radiators. Many radiators don't exist directly, and they need to be customized according to each person's room type and size, so they need to have a certain period. According to the lack of relevant research, the custom production cycle of radiators is about 15 to 20 days, and it still needs to be planned before everyone proposes and debates.

    After the goods are customized, before and after receiving the lack of radiators, you can paint the wall or paste the bricks, and install them according to the corresponding progress.

  9. Anonymous users2024-02-01

    Household radiators, also known as heating radiators, are installed in two types: surface-mounted and concealed.

    Surface-mounted radiatorsThe installation process is relatively simple, and it is mainly divided into:

    Laying pipes, installing radiators, installing wall-hung boilers, pressure testing, customer acceptance.

    Concealed radiatorsThe operation of the slotting and installation of the water collector and manifold is added, and the installation steps are as follows:

    1.Groove the floor or wall. In order to bury the exposed pipelines, the construction team must make grooves in the walls and ground, and the depth and width of the grooves need to be handled by special installers in combination with the actual situation.

    2.Laying pipes and card slots. According to the position of the early heat sink positioning, the branch pipe is slotted and laid, and the steel channel is laid for the branch pipe according to customer needs to protect the pipeline, and the system is closed for water injection and pressure.

    3.Install the water collector and manifold. The water distribution and collection device is a water flow distribution and collection device composed of a water divider and a water collector. The installation of the water separator should be kept level, and it should be wiped clean after installation.

    4.Perform a pressure test on the radiator system. This is a very important step in the radiator installation process, and the specific operation is as follows:

    Close the main connection valve, open the radiator inlet valve with pressure test equipment to test, the experimental pressure should be times of the normal use pressure, and not less than the experimental pressure of the entire community pipe network, 3-5 minutes without leakage is qualified.

    5.Follow the renovation schedule. The construction of the heat sink is carried out simultaneously with the hydropower construction so as not to affect the construction progress.

    6.Install radiators. Place the radiator steadily, connect the valve connector with the inlet and outlet valves, use a level to measure whether the radiator is straight, whether the pipeline installation meets the requirements, and then use a pipe wrench to reinforce and tighten the connector.

    7.Install a wall-hung boiler. The horizontal distance between the wall-hung boiler and the gas meter and the gas stove should be greater than 300, there shall be no power open line and electrical equipment above the wall-hung boiler, the net distance between the wall-hung boiler and the electrical equipment shall be greater than 300, and explosives and other volatile dangerous goods shall not be placed near the wall-hung boiler.

    Tilt the flue down 2° or 3° during installation to prevent condensation, etc. from entering the inside of the wall-hung boiler.

    8.The user inspects and accepts the whole system of the radiator. Usually during the replacement construction, the worker will reserve the valve on the pipeline, and the stamping test should be carried out after installation to prove that there is no running, rising, dripping, and leaking place before the acceptance can be completed.

Related questions
11 answers2024-05-04

The installation of kitchen radiators, in terms of material, the kitchen is suitable for choosing steel or copper-aluminum composite radiators, the choice of these two types is for heating considerations, they have a large amount of heat dissipation, rapid heating, open 15 minutes before entering, and when they enter, it is already warm like spring, which will not make people wait too long and avoid the pain of freezing; Second, because the kitchen is full of smoke and dust, the items placed in it are easy to accumulate dust, and it will be difficult to clean up if it is too late to clean for a long time, which requires the radiator installed in it to have a smooth surface and easy to clean and take care of. Among the many product types, steel and copper-aluminum composite meet the above requirements and are deeply loved by users.

8 answers2024-05-04

The weather in winter is relatively cold, if you can install a radiator in your home, it is a more economical and affordable way to heat up, thenWhat accessories are needed when installing radiators?What should I pay attention to when installing radiators? >>>More

17 answers2024-05-04

It is possible that the reason for the small water pipe is that the water circulation is slow and the heating is not hot, the first group of heat is the front end of the water inlet and the second group of heat at the end will definitely be lower, you can change the pipe to a thicker point to accelerate the water flow and increase the heat.

8 answers2024-05-04

The convection-based copper-aluminum composite radiator has become one of the hot products in the cold winter because of its outstanding anti-corrosion performance, high calorific price ratio, high value retention rate and beautiful appearance. >>>More

8 answers2024-05-04

Prepare a container that is packed, such as a bucket or tray, to prevent water from flowing into the pipes to the ground. Then find the location of the inlet and outlet valves, close them, open the water opening valve, and place the prepared poke or basin at the outlet to receive water. Finally, when the water is free of foam, the drain valve can be closed. >>>More