First: First of all, take a look at the "Construction Contract" and see the corresponding terms about the engineering visa.
Second: before changing the door opening, Party A is required to send a written change order or work contact form. If Party A only gives a verbal notice and is unwilling to send a written notice, and has been urging the construction party to revise, then you should work hard, write a work contact sheet, and send it to Party A through the document record, asking for confirmation.
Third: when demolishing the wall, it is best to go to Party A to see, according to the calculation of daily work, re-build the door and the wall according to the amount of work!
Fourth: You must make a visa report to Party A in time, generally not more than 7 days!
A project site visa is required in the following cases:
1) When the design is different from the actual work, the design change occurs.
2) The site of the construction unit does not meet the conditions stipulated in the contract, which causes an increase in costs to the construction unit.
3) The construction unit requires the construction unit to complete the construction content other than the provisions of the contract) Unforeseen factors in the construction process cause the project cost to increase. For example, the market for raw materials designed during the project is seriously out of stock, and the price of a certain raw material is abnormally rising.
-
In this case, if the fixed amount is directly set to change the unit price, it will definitely be a loss, the fixed unit price is not too high, and the total price is too low, which is not enough to pay the actual personnel and machine costs on site. Therefore, we can only go directly to the on-site visa talent machine, do a good job of on-site visa form, and let the supervising owner sign on behalf of the owner's leader. Thank you.
-
When the contractor and the contractor discuss the contract price on behalf of the construction process, a project site visa form is required.
Engineering visa during construction.
It mainly refers to the construction company's construction drawings and design changes.
other than the content of the project as determined; Construction drawing budget.
or the visa for the construction content that is not included in the budget quota and the actual cost is incurred during the construction, such as the change in the amount of work caused by the change of the construction conditions or the situation that cannot be met.
Due to the construction unit.
Reason, failure to provide materials, sites, equipment and materials according to the time and requirements specified in the contract, resulting in the suspension of work and the loss of workers of the construction enterprise.
Due to the reasons of the construction unit, the construction is suspended or delayed in the middle of the project, or due to design changes and design errors, etc., resulting in the stoppage, nesting, and rework of the construction enterprise, and the loss of personnel and machinery and equipment.
-
Timely, accurate, evidence-based, and best signed with professional practice! To tell a joke, it is to level 100 square meters of space, and don't make 10 shifts, etc.
-
1. Constitutive elements of an engineering visa.
The subject of the visa - it must be both the construction unit and the construction unit, and only one party signs is not a visa;
The visa personnel are authorized - the construction unit or the construction unit must authorize the personnel exercising the visa rights, and the visa form signed by the unauthorized personnel cannot be valid;
The content of the visa - involving the extension of the construction period and/or the change of the cost, the change of the project quantity, etc., that is, it contains a clear visa content;
There is an expression of consensus - usually expressed as the unanimous agreement of both parties, the consent of the employer, the approval of the employer, etc. If the signed opinion is true, it can only be used as evidence, not a visa, and the cost or extension of the construction period needs to be comprehensively determined in combination with the contract and other evidentiary materials.
2. How to carry out the project visa for the construction unit.
1. Pay attention to the attendance visa.
It is a good practice: set up a department - the Ministry of Public Affairs, allocate estimators, contract managers and other positions, unify the control of communications and documents, and achieve diligent visas and claims.
2. The contract should be taken into account when applying for a visa.
If there is a special agreement in the contract for the project visa, it needs to be carried out in accordance with the subject requirements, visa methods, and timeliness requirements specifically agreed in the contract, otherwise the visa will be invalid or cannot be processed, resulting in losses.
3. The visa must meet the four constituent requirements of the engineering visa.
Must be a visa made by both parties;
The visa officer must be authorized;
The content of the visa must be directly related to the extension of the construction period and the increase in costs;
It must be the result of mutual agreement between the parties.
3. Answers to common legal questions in engineering visas.
1. Is it valid for the construction supervisor to sign the visa form alone?
1) Whether the signature of the construction supervisor, as the representative of the employer to perform the construction contract, is valid, and whether the employer has granted the right to the visa;
2) If there is authorization, the signature of the construction supervisor is valid, if not, it is not valid.
2. What should I do if the employer does not agree to the visa?
When the employer refuses the visa, the contractor shall enter into the claim procedure and make a claim within the time limit agreed in the contract.
3. How to apply for a visa for the extension of the construction period?
1) In the event of a delay in the construction period;
2) Report to the engineer in writing within 14 days of the occurrence of the situation;
3) The engineer shall confirm the report within 14 days after receiving it, and if it is not confirmed or proposed within the time limit, it shall be deemed to agree to the extension of the construction period.
4. What is the difference between a visa and a claim?
1) The visa is the result of the agreement between the two parties, and the claim is a unilateral claim of rights;
2) the interest involved in the visa has been determined, while the interest of the claim has yet to be determined;
3) The claim is the process, and the visa is the result.
-
The visa refers to the signing and confirmation of the additional work quantity and cost not covered by the contract.
-
It's countersigned, right? That is, each professional designer, after checking the other professional drawings, sign on the drawings for confirmation.
-
In the "Guiding Regulations for the Operation of Engineering Cost Consulting Business" issued by the China Construction Cost Management Association in 2002, it is explained and defined as: "According to the contract, the representatives of the contracting parties are generally signed and certified by the representatives of the contracting parties on the liability events other than the contract price in the construction process. ”
-
The adjustment of the project and the adjustment of the drawings need to be approved by Party A.
-
To put it simply, what is not on the drawings and what is done during construction and those things such as hidden Taiwan-run machinery and the like need to be visaged. Attach a photo as well. Hope it helps!
-
All works that have been done outside the design drawings must be signed.
1) Raw materials for construction in progress (such as the purchase and construction of machinery and equipment production and operation of fixed assets) shall be included in the construction in progress according to the cost in accounting, and the input tax does not need to be transferred out and included in the construction in progress. >>>More
Article 10 The input VAT of the following items shall not be deducted from the output VAT: >>>More
According to 86 experts, there are currently more than 70,000 Chinese students studying in Canada. Recently, the Canadian Confederation announced that it wants to double the number of international students that Canada hosts from the current 230,000 to 450,000 by 2025. Moreover, Canada has always been a popular country for high school students to study abroad, and the quality of education in Canadian universities is generally recognized by everyone. >>>More
If you select Yes, a file will be added to the project.
If you choose no,No,Some projects will need to be manually added,In the keil c51 lib,Find him and copy it to your project,Right-click source group1 in the project window,Select add。。 Plus. >>>More