-
To draw a line with a height of 200 100 cm for a bridge climb of 10 cm, you can do it by following these steps:
1.Determine the start and end points of the tray on the ground and mark their location.
2.Use a tape measure or measuring instrument to measure the distance between the start and end points and record them.
3.Using a rectangular ruler or triangle, draw a straight line at an angle of 10 degrees to the ground, using the starting point as the base point.
4.Use a tape measure or measuring instrument to measure the height of 10 cm in a straight line and mark it down.
5.Use an angle iron or other straight line tool to connect this marker point to the end point, so that you get the climb line of the tray.
6.Use paint or a pen to draw the outline of the bridge along the climb line to complete the drawing of the bridge.
Please note that in practice, adjustments and corrections may need to be made on a case-by-case basis to ensure that the drawn bridge meets your requirements.
-
Draw a dot at the bottom of the tray from the side of the bridge to divide the distance, and then connect the three points to form a 45° isosceles triangle.
The other side uses the same method), then cut off the triangle to form a 45° bend, and then draw a triangle with the height to be made for the innermost vertex, in the opposite direction to the previous one, making a 4.
-
Summary. How many degrees does the bridge climb 10 cm to operate, take it from the side of the bridge, draw a point at the bottom of the bridge to divide this distance equally, and then connect the three points to form a 45° isosceles triangle.
How many degrees do you climb 10 centimeters of the bridge to operate, take the ruler from the side of the first bridge trap, draw a point at the bottom of the bridge to divide this distance, and then connect the three points to form a 45 ° isosceles triangle.
Climbing 10 centimeters is a 45-degree elbow, which is 45 degrees. And so on, which is equivalent to a calculation formula.
The three-line distance of the bridge head stuffy locust frame = side height multiplied by the formula, the friend cover is 30 ° times, 45 ° times, 60 ° times 190 °, cut two 45 °, and finally push back the length.
-
Kiss, <>
We're glad to answer your questions! The method of 200 times 100 bridge climbing up and down 30 centimeters is as follows: a 30-degree protractor can be used, and then the bottom edge length (bottom hypotenuse) after bending the bridge bent by angle can be the same length as the width of the bridge, but the range is controlled at 100 400mm, two points of this length are selected, two vertical lines relative to the bottom edge are drawn on the side of the bridge, and the bending direction of the bridge is selected as the opening side of the cutting potato; Select the open side as the bottom edge, and draw two vertical lines as the middle line of the two isosceles triangles, and the formula for determining the length of the bottom edge of the isosceles triangle is l 2 (bridge height.
The bridge is bent 90 degrees horizontally, assuming that the general bridge is two meters long and 10 centimeters high! Let's take the 200 bridge!
90 degrees is generally needed to let things, assuming that you need to bend 80, from where to open the first crossing, depending on you, if you want to do 20 cm, open the first crossing from 60, the second crossing take your 20 centimeters multiplied, that is, the second crossing, the size of the opening is the height of the bridge. Extended dataCable tray is divided into trough type, tray type, ladder type, grid type and other structures, which are composed of brackets, brackets and installation accessories. The bridge frame in the building can be erected independently, and can also be attached to various buildings (structures) and pipe gallery supports, which should reflect the characteristics of simple structure, beautiful shape, old and flexible configuration and convenient maintenance, and all parts need to be galvanized, and installed in the open air outside the building.
Hope mine can help you! <>
-
In order to make the slope a little smoother, I did not cut according to the angle formula, I only used 6 cm, the bridge was made, the smaller the number of months, the smoother the slope, the larger the value of the pure tan, the more urgent the slope, when the climb was longer, the number of Ming Tong Huai was built according to the formula to do. Calculation formula for climbing 45 degree bend: 45 ° horizontal elbow practice:
a= mm, bottom edge, 2a= (mm), tan15°, and can be calculated on the computer.
<> bridge support frame is the standard name in the budget quota. Depending on the installation, the name is different. Such as: >>>More
In the bridge structure of the overhead crane, it is composed of two main beams and two end beams on the left and right, and the two main beams are space four truss structures, which are composed of the main truss, the auxiliary truss, the upper horizontal truss and the lower horizontal truss and the diagonal brace, and each truss is composed of an upper chord, a lower chord and a web member (oblique rod or vertical rod). This type of crane tray structure is known as a four-truss bridge. >>>More
The fire bridge generally refers to the fire bridge laid in the fire prevention area, non-smoking area or fire line, commonly known as the fire bridge, and the non-fire bridge refers to the galvanized bridge laid in the ordinary area, that is, there is no clear fire retardant requirements. >>>More
The difference between sprayed cable tray and painted cable tray: >>>More
It's different, and it's not the same for all kinds of things.