The final version of the construction plan of bored piles for an intercity rail bridge.
Table of Contents 1 Basis for compilation.
2 Scope of preparation.
3. Project overview and number of major projects.
Project Overview. Number of works.
4 Main technical standards.
5 Construction arrangement.
People & Organization.
Construction sidewalks and mixing plant installations.
Electricity for construction. Construction water.
Engineering tests. Internal data (collection, sorting, archiving, transfer).
Preparation for construction. Rebar processing site.
Construction schedule.
6 Construction technology.
Rotary drilling drill construction plan.
Percussion drill construction plan.
Pile breaking treatment plan.
Prevention of common problems.
Drilling fault handling methods.
7. Personnel and machinery arrangement.
Staffing. Mechanical arrangement.
8 Quality Assurance Measures.
Process assurance measures.
Management measures. Quality objectives and excellence planning.
9 Safety Assurance System.
Safety production objectives.
Block diagram of the security assurance system.
Assurance measures. 10 Civilized construction.
Assurance measures. Measures to ensure that existing roads are clear.
Technical measures for temporary electricity use in on-site construction.
-
Do you have an email address? Is it a digging pile?
-
The construction process of pilot hole pile is mainly introduced from three aspects, namely mechanical selection, construction method and construction process. CBI Zhongda Consulting introduced the following relevant information for the pile pilot hole construction process:
First, the pilot hole construction technology.
1.Mechanical selection.
According to the geological conditions of the project, 2 JZL90 auger drilling rigs are selected, and the pre-drilled hole diameter can be 50 100mm smaller than the pile diameter according to the specification, and the pile diameter of the group is 400mm, so the pilot hole is equipped with a 300mm drill pipe.
2.Construction method.
The soil extraction and pilot hole method is to use the auger drilling rig to drill the hole in advance or resist, and then apply or hydrostatic pressure pipe pile on the pre-drilled hole position, so that the pipe pile can reach the depth required by the design. The pre-drilled pile sinking method can significantly improve the soil squeezing effect, the foundation can be significantly improved, the foundation soil displacement can be reduced by 30% 50%, the excess pore water pressure value can be reduced by 40% 50%, and the extrusion and floating of the sunken pile can be reduced, which is also conducive to reducing the impact on the surrounding environment. The diameter of the pre-drilled hole is generally about 70% of the pile diameter, the depth depends on the pile distance and the compactness of the soil, permeability, the effective pile length of the pile is 12 meters, according to the site has been completed the pile sinking situation, the depth of the pre-drilled hole is 8 meters, should be drilled with the beating, do not wait.
3.Construction process.
Drilling rig assembly and commissioning, construction pay-off positioning, pile position and elevation, relevant personnel review, acceptance, building axis, pile positioning, auger drilling rig in place, drill pipe alignment pile position, adjust drill pipe verticality, start motor drilling, transport the clay taken out to the off-site, measure hole depth, record and record.
1) According to the construction drawings and the control points handed over by the joint venture, the axes and pile positions are accurately cast. Then order a small wooden stake on the pile position to make a mark.
2) After the pile position is complete, please ask the supervisor and relevant departments to check the line and review the pile position.
3) Install the circuit and electrical appliances of the machinery according to the regulations, check the construction performance of the machinery, and do a good job of debugging the machinery until the machinery runs normally.
4) After the acceptance of the pile line and the mechanical commissioning work is completed, the mechanical drilling construction will begin, and the average hole depth will be 20 meters.
5) The pipe pile should be driven immediately after the soil is taken and the hole is drawn, and the interval should not be too long.
When it comes to the underwater pile foundation construction process, at this stage, what is the basic situation of the construction enterprises carrying out the construction of the water pile foundation? What is the basic overview? The following is the relevant content of Zhongda Consulting to sort out the relevant water pile foundation construction, and the basic situation is as follows: >>>More
1) Organizational safeguard measures.
1. Mobilize a team with rich construction experience, and select excellent technicians and high-quality management personnel to participate in the construction. >>>More
Before the bracket is erected, check the bowl buckle rod in advance, and shall not use digging, bending, corrosion, etc., as well as components with damage and obvious defects, and the bowl buckle or pin must use a special pin. Bowl fasteners must be inspected one by one before entering the site to see if they meet the quality requirements and design requirements. >>>More
Such a strip foundation is a brick foundation, and the steel bar only needs to be made as the upper geosphere beam, and the structural column is made from the geosphere beam; If there is an independent foundation construction, it is necessary to do a single foundation first, and generally there is a frame column that will be set up in this way. >>>More
Powder spraying pile and jet grouting pile are both commonly used foundation treatment methods in civil engineering, and they have some differences in construction principles and applications. >>>More