What are the specific steps of municipal highway construction including pipeline wells .

Updated on delicacies 2024-05-17
3 answers
  1. Anonymous users2024-02-10

    The specific steps of municipal highway construction (including pipelines and wells) are as follows:

    1, trench excavation, 2, flat foundation, foundation cushion construction, 3, safety pipe, 4, caisson construction.

    5. Backfill. That's all there is to drainage.

    1. Subgrade earthwork (including filling and excavating subgrade).

    2. Grassroots construction.

    3. Concrete pavement construction.

    4. Asphalt bottom oil construction.

    5. Asphalt fiberglass earthwork construction.

    6. Asphalt bottom coarse material construction.

    7. Asphalt middle layer construction.

    8. Manhole cover installation.

    9. Asphalt surface course construction.

  2. Anonymous users2024-02-09

    1, trench excavation, 2, flat foundation, foundation cushion construction, 3, safety pipe, 4, caisson construction.

    5. Backfill. That's all there is to drainage.

    1. Subgrade earthwork (including filling and excavating subgrade).

    2. Grassroots construction.

    3. Concrete pavement construction.

    4. Asphalt bottom oil construction.

    5. Asphalt fiberglass earthwork construction.

    6. Asphalt bottom coarse material construction.

    7. Asphalt middle layer construction.

    8. Manhole cover installation.

    9. Asphalt surface course construction. Information.

  3. Anonymous users2024-02-08

    Summary. There should be detailed guidance on what or what to adopt the pipe well method, and it must be determined (): safety measures should be taken, such as wearing safety helmets, wearing protective clothing, etc.

    Secondly, it is necessary to understand the structure of the pipeline well, including the wellhead, wellbore, wellbore, and so on. Before work, it is necessary to install a closure on the wellhead to avoid accidents. When entering the shaft, it is necessary to inspect the shaft and do a good job of air quality testing to avoid poisoning and other problems.

    There should be detailed guidance on what or what to use the pipewell method, and it must be determined () What or what guidance should be given to the use of the pipewell method, and it must be determined (): safety measures must be taken, such as wearing a helmet or wearing protective clothing, etc. Secondly, it is necessary to understand the structure of the pipeline well, including the wellhead, wellbore, wellbore, and so on.

    Before work, it is necessary to install a closure on the wellhead to avoid accidents. When entering the well, it is necessary to inspect the well, and at the same time, it is necessary to do a good job of testing the air quality to avoid poisoning and other problems.

    In the specific operation, the following points need to be noted:1Teamwork:

    In the operation of walking the tube well, it is necessary to work as a team with other members. Each member is expected to understand their own tasks and responsibilities and maintain communication to ensure that the whole process runs smoothly. 2.

    Use tools: Work efficiency can be increased by using the right tools and equipment, such as lighting fixtures, screwdrivers, and so on. At the same time, it is also necessary to pay attention to the use of tools and equipment and safety specifications in the work to avoid potential safety hazards such as tripping and cutting.

    Therefore, taking the tube well requires detailed guidance and standardized operation procedures to ensure safety and efficiency. In the specific operation process, it is necessary to work as a team with other members and follow the relevant norms and safety measures. <>

Related questions
3 answers2024-05-17

Emergency plan, special construction plan 370

Decoration Engineering Special Construction Organization Design 314 >>>More

7 answers2024-05-17

The use of soil curing agents in road construction not only saves materials, but also has a particularly good effect on protecting the environment. For example, the use of "soil solidification" soil curing agent has more benefits. Here are 10 advantages: >>>More

16 answers2024-05-17

1.Check the design drawings.

2.Find out the defects in the design and submit it to the design department. >>>More

4 answers2024-05-17

Construction of municipal drainage pipeline engineering.

1. According to the actual situation of municipal pipeline engineering construction, the whole process of construction can be divided into three stages: preparation before pipeline laying, pipeline laying and construction site restoration. The key works of each stage are: 1. Preparation before the laying of the pipelineThe removal of the road and the restoration of the urban pipeline will have a certain amount of existing road surface broken during the construction of the pipeline. >>>More