I am looking for a sample of the completion acceptance appraisal of water conservancy and hydropower

Updated on educate 2024-06-16
14 answers
  1. Anonymous users2024-02-12

    Engineering.

    Unit project (contract project completion).

    Acceptance Certificate.

    * Engineering Acceptance Working Group.

    *Year***Month***Day.

    Acceptance presiding unit:**

    Legal person acceptance supervision and management authority: **

    Project legal person: **

    The agency (if any) :*

    Design unit:**

    Supervision unit:**

    Contractor: **

    Main equipment manufacturers (**) business units: **

    Quality and Safety Supervisory Body: **

    Operation Management Unit: **

    Preface. Acceptance basis:

    Organization: The organization of the project acceptance team of this division is as follows:

    Acceptance Team Leader: **

    Deputy Leader of the Acceptance Team: *

    Acceptance Team Members: **

    Personnel of the accepted unit: **

    Acceptance process: an overview of the unit's project.

    1) The name and location of the unit's project.

    2) The main construction content of the unit project.

    3) The construction process of the unit project (including the start and completion time of the project, the main measures taken in the construction, etc.).

    Measures taken during construction:

    1. Engineering quality control measures:

    2. Project progress control measures.

    3. Project safety production management measures.

    4. Project investment control measures.

    5. Other measures.

    1. Scope of acceptance.

    Second, the completion of the unit project and the main amount of work completed.

    3. Unit project quality assessment.

    1) Quality assessment of branch projects.

    2) Project appearance quality assessment.

    3) Project quality inspection.

    4) Opinions on the evaluation of the quality grade of the unit's project.

    Fourth, the handling of the remaining problems of the division acceptance.

    5. Operational readiness (this part is required for putting into use acceptance) 6. Main problems and handling opinions.

    7. Comments and Suggestions.

    VIII. Conclusions.

    9. Reservations (signed by the person).

    10. Signature form of members of the unit project acceptance working group.

    11. Annexes.

    1) Provide the acceptance working group with a catalogue of materials.

    2) Catalogue of acceptance appraisal of branch projects.

    Q3 Engineering construction management work report.

    Project Overview. Bidding for works.

    Construction progress management.

    The main construction method.

    Construction quality management.

    Civilized construction and safe production.

    Contract management. Experience & Advice.

    Annex. 1. The setting of the construction management organization and the main staff table.

    2. The planned resources invested at the time of bidding and the actual resources invested in the construction are tabled.

    3. Memorabilia of project construction management.

    4 Catalogue of technical standards.

    Q4 Engineering design work report.

    Project Overview. Key points of engineering planning and design.

    Implementation of engineering design review opinions.

    Engineering standards. Design changes.

    Design file quality management.

    Design services. Engineering evaluation.

    Experience & Advice.

    Annex. 1. The setting of the design organization and the main staff table.

    2 Engineering design memorabilia.

    3 Catalogue of technical standards.

    Q 5 Project Construction Supervision Work Report.

    Project Overview. Supervision and planning.

    Supervision process. Supervision effect.

    Engineering evaluation. Experience & Advice.

    Annex. 1. The setting of the supervision organization and the main personnel table.

    2. Memorabilia of engineering construction supervision.

  2. Anonymous users2024-02-11

    Water Conservancy and Hydropower Acceptance Specification 2008

  3. Anonymous users2024-02-10

    Common data format for acceptance of water conservancy and hydropower projects.

  4. Anonymous users2024-02-09

    In the general construction company, it is necessary to leave a 5% deposit after Party A's acceptance.

  5. Anonymous users2024-02-08

    Completion and acceptance of contract works:

    Within 30 working days from the date of passing the acceptance appraisal, the project legal person shall send it to the relevant units and submit it to the legal person acceptance supervision and management authority for the record.

    Completion acceptance: It should be carried out within 1 year after the construction project is completed and meets certain operating conditions. If the completion acceptance cannot be carried out on time, the time limit may be appropriately extended with the consent of the presiding unit of the completion acceptance, but the maximum shall not exceed 6 months.

    The application report for completion acceptance shall be reviewed by the legal person acceptance supervision and management authority and then forwarded to the presiding unit for completion acceptance.

    The project legal person shall, within 30 working days from the date of approval of the self-inspection report for completion acceptance, submit the self-inspection report to the legal person acceptance supervision and management authority.

  6. Anonymous users2024-02-07

    First of all, the construction unit is not able to make the final appraisal of the qualification of the construction content, the correct procedure is that the construction unit is divided into divisions, units and the application report for completion acceptance, Party A presides over the acceptance work, and finally the supervision unit according to Party A, design, supervision, construction unit and operation management unit on the above-mentioned project acceptance results issued by the division, unit engineering appraisal, and signed by the five parties, the completion appraisal is also issued by the supervision unit, signed by the five parties.

  7. Anonymous users2024-02-06

    Personally, I understand that the supervisor should be responsible for the preparation. The superintendent is on behalf of the owner.

    The completion and acceptance of the contract project shall be presided over by the project legal person. The acceptance working group shall be composed of representatives of the project legal person and the survey, design, supervision, construction, and major equipment manufacturing (**) units related to the contract project.

  8. Anonymous users2024-02-05

    The project legal person is a limited liability company and a stock company established in accordance with the Company Law of the People's Republic of China to engage in project development. The project legal person is not the investor, but the project legal person is the main body responsible for the project construction, and is responsible for the planning, fund raising, construction implementation, production and operation, debt repayment and capital preservation and appreciation of the project developed in accordance with the law, and enjoys the corresponding rights.

  9. Anonymous users2024-02-04

    Construction unit: Because the relevant information is the most complete, the construction unit is the most complete.

  10. Anonymous users2024-02-03

    Look at you and you're just doing engineering

  11. Anonymous users2024-02-02

    1. The construction unit shall submit the following materials:

    1) Application report for project completion and acceptance (including project completion, inspection results of acceptance conditions, preparation of acceptance organization, recommended acceptance time, place and participating units);

    2) Report on project construction management;

    3) Memorabilia of project construction;

    4) List of projects to be inspected, list of unfinished projects, construction arrangements and completion period of unfinished projects, existing problems and solutions;

    5) Preliminary acceptance work report;

    6) Completion acceptance appraisal (draft);

    7) Project application and flood relief scheme;

    8) Report on project construction supervision;

    9) Engineering design work report;

    10) Quality assessment report of water conservancy and hydropower projects;

    11) Project construction management work report;

    12) Special reports on major technical issues;

    13) Preparation report for project operation management;

    14) Report on land acquisition compensation and resettlement for project construction;

    15) Self-inspection report of project file data;

    16) Audit report or audit opinion of the final accounts of the project.

    2. Examination and approval procedures: reviewed and approved by the Water Conservancy (Water Affairs) Bureau, and acceptance shall be organized.

  12. Anonymous users2024-02-01

    The main differences between the two are:

    The project completion acceptance form is a record of the project acceptance activities, which mainly covers the content of the acceptance project, the acceptance inspection, and the acceptance opinions of the construction party, the supervision party and the construction party.

    The appraisal of the completion of the project, mainly highlighting the appraisal, is a comprehensive evaluation of the acceptance of the completion of a project, and the acceptance appraisal is one of the bases for accountability.

  13. Anonymous users2024-01-31

    Water conservancy engineering and municipal administration are different, water conservancy engineering data should first be bound according to the unit engineering data, then the branch project, and finally the unit project. It is also necessary to have the testing data issued by the unit with testing qualifications, as well as the acceptance conclusions of all parties.

  14. Anonymous users2024-01-30

    1. The completion and acceptance data of water conservancy and hydropower projects are bound according to the unit engineering data, the branch engineering data, and finally the unit project.

    Second, the content of the completion data:

    1. The completion report of the construction unit.

    2. The quality evaluation report of the completion of the project of the supervision unit.

    3. Survey documents and implementation inspection reports of the survey unit.

    4. The design documents and implementation inspection report of the design unit.

    5. Opinion on the completion and acceptance of construction project quality or unit (sub-unit) project quality completion acceptance record 6. Rectification notice of problems in completion acceptance.

    7. There are problems in the completion acceptance and rectification acceptance opinion.

    8. The notice of the project with the completion acceptance conditions and the reorganization of the completion acceptance notice 9, the unit (sub-unit) project quality control data verification record (quality assurance data review record) 10, the unit (sub-unit) project safety and function inspection data verification and main function spot check record 11, the unit (sub-unit) project perception quality inspection record (perception quality assessment form) 12, the user sign opinion form for the directional sale of commercial housing or employee fund-raising housing 13, the project quality warranty contract (book)

    14. Construction project completion acceptance report (filled in by the construction unit) 15. Completion drawings (including intelligent building division).

Related questions
26 answers2024-06-16

Water conservancy and hydropower cost software must fully meet the stages of feasibility study estimation, preliminary design budget estimate, construction drawing budget, list bidding, completion settlement, audit and review. It is also necessary to choose the products of large software companies, and the quota update is guaranteed in the later stage.

13 answers2024-06-16

Of course, yes.

Civil engineering refers to the planning, construction and maintenance of all infrastructure related to water, soil and culture. In general, civil engineering includes architecture, urban planning, and civil engineering. >>>More

21 answers2024-06-16

Hello, I graduated in 2012 into the 14th Bureau of Hydropower, currently in its secondary unit under the project department as a comprehensive officer, our project department salary by me, at the same time I can also see the salary of all our secondary units, so you want to know the treatment of the words I am most qualified to say: the 14th Bureau has a salary standard, the bureau directly under the unit salary standard is high, the secondary unit will be a grade lower, at the same time the undergraduate will be higher than the junior college a starting point, but in general is not high, and the 14th bureau deducted the housing provident fund is relatively high, Therefore, as a freshman, it is generally about 2000 (2013 standard), if you graduate from a junior college, you can get less than 2000, and if you are an undergraduate, it will be about 2300. What is 2,000 yuan enough to do in this era? >>>More

9 answers2024-06-16

There are about a few places to go after graduating from water conservancy and hydropower engineering. >>>More

9 answers2024-06-16

Yes, it is necessary to accumulate experience, not experience.