When the house is renovated and accepted, how to look at the construction quality? What should I pay

Updated on home 2024-06-20
8 answers
  1. Anonymous users2024-02-12

    For the decoration novice, when accepting the house, you can only look at the general details and are not clear at all, so it is recommended to find a professional house inspection company for acceptance when accepting the house.

  2. Anonymous users2024-02-11

    The first thing that should be looked at is what kind of material is used in the kitchen decoration, and then there is whether the floor fit is very strong, which must be checked, and the toilet in the bathroom.

  3. Anonymous users2024-02-10

    After the decoration of the house acceptance, it is very particular to check the construction quality, and you must pay attention to some details. In this way, you can guarantee that you will not be deceived. It mainly checks whether the hydropower materials are qualified, whether the line is reasonable, and then also checks the quality of wall and ground construction, and whether the formaldehyde used materials is seriously exceeded.

  4. Anonymous users2024-02-09

    To see whether the floor or tiles of the ground are neatly paved, you can use a small glass to roll on the floor to see if it is smooth, as well as the walls and heating, these places are easier to see whether the decoration is meticulous or not.

  5. Anonymous users2024-02-08

    Waterway acceptance. 1. There should be drains in the kitchen and bathroom.

    2. The downpipe should be straight and neat, not overlapping, less bending, and the standard is to use the smallest interface and keep the closest distance;

    3. The slotted pipes and fittings of the waterway must ensure that the joints are firm, and the closed water test is used to check whether there is water seepage, and once it is found, it will be solved immediately and the second test must be done;

    4. All copper pipes should be used indoors, rubber-coated copper pipes should be used for hot water pipes, PVC pipes should be used for sewer pipes, and raw material belts should be used for interfaces.

  6. Anonymous users2024-02-07

    For many buyers, it is a joy to complete the renovation of the new house and move into the new home, but some people have a headache because of the acceptance problem. So how to accept the new house after decoration, and what do you need to pay attention to in terms of inspection? Doors and windows, floors, walls, drainage facilities, and electrical appliances should be checked one by one, and attention should be paid to the details.

    1. How to accept the decoration of the new house - check the doors and windowsTo check the door, you need to open and close the door on the spot to see if the opening direction is correct and whether the opening and closing is smooth. It is also necessary to carefully check the size of the door gap, the gap below should not be less than 5 mm, and not more than 8 mm, and the door gap on the other sides should not exceed 3 mm. When checking the windows, open and close the windows flexibly to see if the glass is broken and the window frame is not deformed.

    The ground is prone to hollow drum problems, and you need to see if it is flat, or you can use a small hammer to gently knock on it and listen to the sound. If the floor is tiled, check whether there are cracks in the slope at the joint, and pay attention to the position of the waistline. For carpets, check whether they are fixed firmly, the blanket surface is not wrinkled, and the fleece is consistent with the light.

    3. How to accept the wall after the decoration of the new house - check the wall to check the wall, pay attention to the flatness of the whole surface, observe whether there is cracking, whether there is leakage of barbed wire, steel bars, whether the paint is uniform and has no color difference, if you find it, you must solve the problem immediately. Nowadays, many families like to paste wallpaper, check whether the interface of the wallpaper is neatly docked, not warped, and whether the splicing between patterns is accurate; There are no bubbles and tears in the whole wallpaper.

    Turn on the faucet to see if it shakes, if it shakes, it means that the waterway installation equipment is not firm. Whether the amount of water in the water pipe is unblocked, you can wipe it with toilet paper to detect whether it leaks. Whether the toilet and washbasin drain smoothly, turn on the faucet to see if there is any backwater and whether there is water accumulation in the local area.

    Check whether the installation of the electrical box and switch box is standardized, can not be tilted or placed upside down, and whether it is loose and not firm. The layout of the line is not neat, whether there is a knot, etc., and whether the indication mark is clear and empty. Use all kinds of household appliances normally, pay attention to whether the installation position is correct and whether there is electricity.

    Acceptance is the last step in the decoration of the new house, to avoid problems with the effect or quality of the decoration, we must do a good job.

    You can get it for free

  7. Anonymous users2024-02-06

    Acceptance of a new house, the decoration process is a very important step. In the acceptance process, we can find the deficiencies and areas to be improved, and we can prescribe the right medicine to solve the potential safety hazards. So, what should we pay attention to when decorating and accepting a house?

    1. What should be paid attention to when decorating and accepting the house.

    1. Wall acceptance.

    Wall acceptance is the most basic acceptance, but it must also be taken seriously. Whether there are cracks in the wall and the appearance of the floor slab are the first items to check. For load-bearing walls and floor slabs, mark them at any time if they are found to be cracked; The inspection of the appearance of the wall also depends on whether the putty powder on the wall is evenly brushed and whether the wall is vertical and flat.

    Teach you a good way to check, use a 200W bulb to illuminate at night, anything on the wall can be seen under this light.

    2. Ground acceptance.

    After the floor has been laid, whether it is a wooden floor or a floor tile, the surface is particularly susceptible to scratches or damage due to other construction. Especially for tile floors, check for cracks, color differences, and chips. The tile floor will be reflective, so it is best to observe from a position 2 meters away when you accept it, so that you can observe it accurately and clearly.

    3. Waterway acceptance.

    The waterway acceptance is mainly aimed at hot water, cold water and reclaimed water. Reclaimed water is not used much in commercial housing units, mainly for hot and cold water. The first thing is to check the position of the water meter, and then the overall direction of the water pipe to see if there is any wrong pipe; whether there is a clear distinction between hot and cold water pipes; The most important point is the quality inspection of the pipe, whether it complies with the relevant national regulations; If the quality of the pipe is slightly inferior, it is easy to leak after long-term use.

    If possible, it is best to use copper pipes, and the laying of water pipes is mainly to go to the top. 4. Circuit acceptance.

    Circuit inspection, first of all, see whether the wiring at the turn is wrong; Whether the wiring and tube meet the standards; whether the location and number of sockets are reasonable; Whether the distribution box has a good leakage protection is a very critical point. The lighting switch system should also be checked for the same as the design drawings. There is also the quality of the wire, which is also a point that should not be forgotten.

    As an owner, I still need to know more about the knowledge of acceptance. In this way, if there is any problem in your life in the future, you can find the problem as soon as possible.

  8. Anonymous users2024-02-05

    Whether it is a rough house or a decoration house, it is necessary to carry out acceptance at the time of delivery, which needs to pay attention to checking the quality of water and electricity lines, kitchen equipment, doors and windows, etc.

    1. Brand model:

    Generally, when buying a house, the purchase contract will indicate the brand of decoration materials used in the decoration of the house, then we must strictly follow the purchase contract to check the brand of materials used in the decoration of the house, if it is found that it does not match, negotiate with the developer in time.

    2. Check the water and electricity lines

    When inspecting the waterway, we should turn on the faucet to see if the water is smooth, whether there is any leakage, and observe whether there is a quality problem with the water flowing out of the faucet.

    3. Kitchen and bathroom equipment:

    Check whether the door of the kitchen cabinet can be opened and closed smoothly, and whether the tiles are hollowed, you can directly tap it with your hand and identify it by sound.

    4. Bathroom:

    It is important to check the waterproofing of the bathroom and whether the water is unobstructed, and the ceiling leakage check is also a top priority.

    5. Doors and windows: Room doors and windows are an important part of interior decoration and should be inspected. Check that the inside of the door is smooth and flat.

    In addition, it should also be checked whether the veneer of the door frame is parallel to the wall, which many owners tend to ignore when inspecting the house, in fact, this point should also be paid attention to.

Related questions
7 answers2024-06-20

Nanning Baijiaju reminds that it is necessary to check the quality problems, mainly the details, and look carefully at the corners and corners to see whether the quality of the materials meets the requirements.

10 answers2024-06-20

The most reliable way to do this is to ventilate.

In the summer, when the temperature is above 20, you can use a high-powered electric fan to blow it. >>>More

11 answers2024-06-20

It depends on what material you choose. If it is an environmentally friendly material, it is generally ventilated for one to two months. The criteria for being able to move in are: >>>More

5 answers2024-06-20

The house decoration is all-inclusive** at 1000 yuan a square meter, according to the 100 square meter house, it costs 10w, the grade is the most basic and ordinary, and then it depends on the city where you are located, ** will also fluctuate. >>>More

9 answers2024-06-20

1. Chlorine dioxide effervescent tablets are placed in a disposable cup filled with water 2. Activated carbon 3. Photocatalyst sprayed on walls and furniture 4. Green plants 5. Open windows for ventilation.