Nanning Baijiaju reminds that it is necessary to check the quality problems, mainly the details, and look carefully at the corners and corners to see whether the quality of the materials meets the requirements.
-
Concealed engineering: 1. Mainly invisible concealed projects such as water supply (hot water, cold water), strong electricity (lighting, socket), drainage, electricity (**, network, closed circuit, etc.), waterproof (top priority).
Surface-mounted visible parts.
Furniture: Is the cabinet flat, whether the cabinet door and handle are installed, and whether the seams are closed? Whether the handle is neat or not.
Paint (furniture, wood modeling): whether the paint surface is smooth and uniform. If it is colored paint, the color should be uniform, and the nail holes and gaps are not repaired.
Latex paint: whether the yang angle and yin angle (the place where the wall turns) are straight lines, and whether the line connecting the wall and the top surface is straight and smooth. There are no marks in a large area.
Tiles: whether the joints of the four bricks are smooth, whether each joint is of uniform size, and whether the grout is filled.
-
2011-12-01 15:11 Netizen (1), date and form of closing.
2) Acceptance tools that need to be prepared.
1) Room inspection hammer: used to check the wall, ground, window sill hollow.
2) Slightly larger bucket: used to check whether the floor drain and drainage pipe are unobstructed.
3) Tape measure: used to check the net height of the house.
4) Electrical plug: used to check whether the socket is disconnected or blocked.
5) Tennis: used to check that there are no obstacles in the sewage pipeline. There is a camera (with flash) that shows the date, and the lawyer recommends that it is best to use an optical camera - for taking photos and collecting evidence when there is a problem with the house.
3) Acceptance process and specific steps.
The first item: check the documents.
1) The "Construction Project Planning Acceptance Certificate" issued by the planning department.
2) The "Construction.
Certificate of Filing. Each item on the table must be reported to the competent department for the record, if any item is missing, this real estate is still a "black building", is not allowed to move in.
3) The "Housing Quality Certificate" issued by the quality inspection station at or above the district level. — Must have.
4) The developer provides the housing of the house
It must be obtained, it must be taken away.
5), the developer provided the ".
The developer assumes the warranty liability accordingly. It must be obtained, it must be taken away.
6) The "Completion Measurement Form" issued by the surveying and mapping team directly under the Real Estate Management Bureau or the District Bureau. Indicate what the actual floor area is, how much it is apportioned, and where is the common area. or an official surveying and mapping report issued by the competent department (cadastral surveying and mapping brigade of the Planning and Land Bureau).
Survey and Mapping Report. — must have, otherwise at least the actual one cannot be calculated.
area, it is not possible to settle the final payment, and no official invoice can be issued.
7) The "Water Certificate" of the domestic water supply system issued by the health and epidemic prevention department.
8) Construction Engineering issued by the Public Security and Fire Department.
Submissions. 9) Civil Defense issued by the Civil Defense Department.
Certificates. 10) Notice of Elevator (Escalator) Acceptance Result issued by the Quality and Technical Supervision Department.
11) The environmental protection department issued the "construction project environmental protection acceptance certificate".
12) "Gas Engineering Acceptance Certificate" issued by the gas competent department.
13) The "Project Acceptance File Approval Letter" issued by the urban construction archives department.
14) Pipeline distribution as-built drawings (water, strong electricity, weak electricity, structure) - can be taken away. The design drawings and water circuit drawings of the house, how to go through the pipeline, which walls can be played, the instructions for the use of the distribution box and the distribution box, etc.
The second item: verify the area, calculate and implement the problem of over-refund and under-payment of the housing payment.
The third item: acceptance of the house.
Fourth: Check whether the facilities and equipment indicated in the sales contract are missing, and whether the brand and quantity are consistent. In general, there should be no big problem in this regard, but it should also be carefully verified.
Fifth: acceptance of the public environment.
-
There is a set of systematic professional content for acceptance, which is difficult for ordinary people to consider thoroughly, and it also involves professional knowledge in all aspects. The easiest way is to invite an expert (or experienced) friend to eat a meal.
-
House decoration to go through design, demolition, carpentry, tiling, painting, ceiling, installation, household appliances and furniture entry, cleaning and so on a series of decoration construction, decoration after the completion of each construction, but also to carry out construction acceptance, so as to ensure the quality of the decoration of the house, to avoid problems in the later use, so how to accept the house after decoration? Let's take a look.
1. Wall acceptance.
After the wall decoration is completed, it is necessary to accept the construction of the wall and wallpaper, mainly to detect whether the wall will have hollowing problems and whether the wallpaper will have bubble problems. Detect the hollow drum on the wall can be directly touched by hand and seen with the eyes, there are hollow drums, peeling problems are unqualified, to repair or rework, the wall should also ensure verticality, flatness, to ensure that there are no gaps, no water seepage, etc., it is best to check on sunny days and rainy days, which is more accurate.
2. Hydropower acceptance.
When accepting the circuit, it can be judged by the normal use of the lamp switch, or you can use the electric tester to test the socket, and each socket is to be tested. The acceptance of the waterway, not only to check the water pressure, but also to check the drainage, the water is normal, can be carried out through the water pressure test, or shake the faucet to observe the smoothness of the water flow, the elbow part of the water droplets, leakage and other conditions are unqualified.
3. Ground acceptance.
Including the acceptance of tiles, floors, bathroom waterproofing, etc., the tile floor should be guaranteed to be flat, the angle is accurate, the edges are neat, etc., and it is also necessary to hit the tile with a small iron rod to see if there is a hollow drum problem. The acceptance of the floor needs to observe the smoothness and cleanliness of the surface, as well as whether the connection between the baseboard and the floor, and whether the floor has sound, loosening, warping and other phenomena. The waterproof acceptance of the toilet can be checked by the closed water test, and after 48 hours, there is a significant drop in water level, indicating that the waterproof is unqualified.
Summary: The above is an introduction to how to accept the house after decoration, I hope the content shared can give you some reference, if you want to know more about related knowledge, you can **** Qeeka Home information.
-
After the house is renovated, the decoration must be accepted, and for the decoration novice, there may be no experience in the acceptance of the house. So let's introduce how to accept the renovated house, let's find out together!
1. Check the wall.
Look at the load-bearing wall, the load-bearing wall should not have cracks, and the color of the wall should be uniform, and there should be no color difference. The plastering wall and tile surface can not be hollowed, otherwise there will be wall ash or tile falling off in the future. The deviation of the vertical flatness of the wall corner and the wall surface can not be too large, the deviation value of the ordinary plastering wall is 4mm, and the deviation of the brick surface is 2mm.
Use a vertical inspection ruler to detect the verticality and horizontality of the wall. The verticality deviation of the plastering façade is 5mm, the deviation of the brick surface is 2mm, the horizontal deviation of the plastering wall is 4mm, and the deviation of the brick surface is 2mm.
2. Ground acceptance.
The surface of the floor tiles is easy to be scratched or damaged due to construction, and we should check the appearance of the ground to see if there are chips, cracks and color differences when we accept it. Also check the flatness of the store, you can use a vertical detection ruler to detect the flatness of the ground, the allowable error of the flatness of the surface of the floor tile paving is 5mm, and the flatness deviation of the floor is 3mm. The slope design of the surface of the floor tiles in the kitchen and bathroom should meet the requirements, and there should be no flooding and water accumulation, otherwise it will affect the normal dewatering.
The floor and floor tiles should not be hollowed, otherwise they will loosen and fall off in the future.
3. Acceptance of drainage conditions.
The acceptance of drainage mainly depends on its quality and water supply. First of all, check the installation position and product quality of valves, whose faucets, water meters, etc.; Then open the valve and faucet for water flow test to see whether the water outlet is smooth, whether there is blockage, and whether the water quality is abnormal. Check the location of the floor drain and drain outlet, observe whether the surface and joints of the drainage pipe are in good condition, and whether the drainage pipe has right angles and dead angles.
4. Electrician acceptance.
The electrician's acceptance mainly looks at the electrical box, switch, socket and electrical appliances, etc., and the electrical box mainly looks at its installation standards, appearance and structure of the electrical box. The electrical box and switch box should be installed upright and firm, and should not be inverted or skewed; If there are multiple electrical boxes, the distance between the electrical boxes should not be less than 30mm. Check whether the appearance of the switch is damaged and the corresponding electrical operation.
See whether the installation of the electrical appliances meets the specifications, whether the electrical appliances are operating normally, whether they are loose, or whether they have fallen.
-
After the new house is renovated, the owner needs to accept the house, but many owners do not know much about the decoration and do not know how to accept the renovated house.
1. According to the experts of Qeeka Home, we need to check the walls, ground, waterways, circuits, doors and windows, waterproofing and other aspects when accepting the renovated house. When we accept the wall, you can use the vertical detection ruler to check the verticality and levelness of the wall, under normal circumstances, the allowable deviation value of the ordinary plastering wall does not exceed 3mm, and the allowable deviation of the brick surface does not exceed 2mm.
2. If the wall is painted with wall paint, check whether the wall paint has obvious color difference, pan alkali and whiskering during acceptance; You can first stand one meter away from the wall to check; Then turn on the light bulb and use the light bulb to shine against the wall to inspect it once. If the wall is paved with tiles, we can check whether the brick surface is regular and consistent, and whether there is any chipping; Gently tap the tile with a small hammer to check for hollowing. When you inspect the wall, you can check whether there is water seepage on the wall the next day after the rain is gone.
3. When the waterway is accepted, you can open the faucet and check whether the water supply of the water pipe is unblocked; In addition, a hydrostatic test can be carried out to check whether there is any leakage in the water pipe. We can also pour a basin of water into the drain outlet such as the toilet, sink, floor drain, etc., to check if the drainage is normal. The kitchen and bathroom and Yanghu stool are equipped with floor drains, and the faucet can be turned on, and after a period of time, check whether there is local water accumulation on the ground.
4. When you accept the water and electricity, you can check whether the installation position of switches and sockets, faucets, electrical appliances, bathroom products, etc. is correct according to the design drawings. Check whether the installation of switches and sockets is flat and stable, whether it is perpendicular to the ground, and whether it is aligned with adjacent boards. The switch should not be installed behind the door, and the bathroom socket should be installed with a splash-proof type.
Everyone checks whether each switch button can operate normally; Check with an electric pen that the socket is powered on. We can also disassemble the cover of the electrical box to check whether the wiring inside is standardized.
Summary: About how to accept the renovated house, I will briefly introduce it to you here. I hope that after reading this article, you will be able to understand this. There are many ways to accept the house after the decoration, and you can consult a professional for specific details.
I thought it would be very troublesome to buy a house, but I didn't expect that the process of decorating a new house is also very troublesome, and there are too many places to pay attention to, otherwise it is easy to go into a misunderstanding. For me, who has just renovated my new house, I have summarized the following small knowledge, I hope it will be useful to you. >>>More
Buy your own materials, see other people's good early workers work, this will save money, I used to open a decoration company, that is, I am tired, there is time to work at the top of this point to see that the work is not good to the workers in advance, to wait for the work is done in the workers to say, he must not be willing to change for you.
If you like to surf the Internet, there are at least 2 network ports and more than 2 sockets on each wall in each room. Wireless routing does solve the problem, but it is said to be unstable at times.
The house decoration is all-inclusive** at 1000 yuan a square meter, according to the 100 square meter house, it costs 10w, the grade is the most basic and ordinary, and then it depends on the city where you are located, ** will also fluctuate. >>>More
If you find someone yourself, it is difficult to get legal protection if there is a problem with the quality of the decoration. As we all know, the competitiveness of the roadside decoration team lies in the cheapness. For the same tile project, it may cost 40 yuan per square meter to find a decoration company in the migrant market, and it may only cost half of the ** to find a bricklayer. >>>More