What are the prerequisites for bidding for power projects?

Updated on Financial 2024-06-05
6 answers
  1. Anonymous users2024-02-11

    1. The following conditions must be met:

    Have the legal personality (or legal personality) of the project;

    Have professional and technical strength in engineering technology, budget estimate, finance and project management that is suitable for the scale and complexity of the bidding project;

    Experience in bidding for similar engineering construction projects;

    There is a special bidding agency or more than 3 full-time bidding business personnel;

    Familiar with and master the bidding law and relevant laws and regulations.

    2. In accordance with the "Bidding Law of the People's Republic of China" and relevant laws and administrative regulations, combined with the actual situation of the province, these regulations are formulated.

    3, 11th for the project that must be tendered in accordance with the law, the tenderer handles the bidding matters on its own, shall have the ability to prepare bidding documents and organize bid evaluation, meet the following conditions, and file with the relevant administrative supervision departments:

    1. Have the qualifications of a legal person or other organization;

    2. There are technical, economic and other professionals who are suitable for the scale and complexity of the bidding project;

    3. There is a special bidding agency or more than three personnel with bidding business ability;

    4. Familiar with the laws, regulations and rules related to bidding and bidding.

    4. Article 12 If the tenderer has the ability to bid on its own, it can independently choose to bid on its own or entrust a qualified bidding agency to bid for the matter.

    If the tenderer does not have the ability to prepare bidding documents and organize bid evaluation, it shall entrust a qualified bidding agency to handle the bidding matters. No unit or individual may designate a ** institution for it in any way.

  2. Anonymous users2024-02-10

    Legal analysis: (1) The tenderer has been established in accordance with the law;

    2) The preliminary design and budget estimate shall be subject to examination and approval procedures, and have been approved;

    C) the scope of the bidding, the bidding method and the organizational form of the bidding shall be carried out the approval procedures, has been approved;

    4) There are corresponding funds or funds** have been implemented;

    5) There are design drawings and technical information required for bidding.

    Legal basis: "Measures of the People's Republic of China for Construction Bidding and Bidding for Engineering Construction Projects" Article 8 Engineering construction projects that must be tendered in accordance with the law shall meet the following conditions before construction bidding:

    A) the tenderer has been established in accordance with the law;

    2) The preliminary design and budget estimate shall be subject to examination and approval procedures, and have been approved;

    C) the scope of the bidding, the bidding method and the organizational form of the bidding shall be carried out the approval procedures, has been approved;

    4) There are corresponding funds or funds** have been implemented;

    5) There are design drawings and technical information required for bidding.

  3. Anonymous users2024-02-09

    On January 12, 1998, the Ministry of Electric Power Industry issued the "Regulations on the Administration of Bidding and Bidding for Electric Power Engineering Design" issued by No. 9 of the Electric Power Industry to make it clear:

    Design and bidding for new construction, renovation and expansion (including large-scale and small-scale technological transformation) thermal power generation projects and power transmission and transformation projects. It is not restricted by regions and departments, and no region, department, or unit may intervene, monopolize, or protect it. Bidding and bidding shall follow the principles of openness, fairness, justice, merit, honesty and trustworthiness.

    The design of thermal power generation projects should generally be subject to a one-time tender at the feasibility stage. The winning bidder is responsible for completing the feasibility study, preliminary design, construction drawing design and site design services, and the whole process of survey and design work until the completion of the project; In the feasibility study stage, the design bidding has been carried out, and the initial design is generally not suitable for bidding. When there are special circumstances that make it impossible to continue to execute the original design contract, bidding can be carried out at the initial design stage.

    The design of power transmission and transformation projects should generally be subject to a one-time tender at the preliminary design stage. The winning bidder is responsible for completing the preliminary design, construction drawing design and site design services Qingchang hand, until the completion of the whole process of survey and design work.

    Construction Law of the People's Republic of China.

    Article 53 The State shall implement a quality system certification system for units engaged in construction activities. Units engaged in construction activities may, in accordance with the principle of voluntariness, apply for quality system certification from the first-class product quality supervision and management department or the certification body recognized by the department authorized by the first-class product quality supervision and management department. If it is certified, the certification body will issue a quality system certification certificate.

    Article 54 A construction unit shall not, for any reason, require an architectural design unit or a construction enterprise to violate laws, administrative regulations, and construction project quality and safety standards or reduce the quality of a project in the course of engineering design or construction operations.

    Architectural design units and construction enterprises shall refuse the construction unit's request to reduce the quality of the project in violation of the provisions of the preceding paragraph.

    Article 55 Where a construction project is contracted by a general contractor, the general contractor shall be responsible for the quality of the project, and if the general contractor subcontracts the construction project to another unit, it shall be jointly and severally liable for the quality of the subcontracted project and the subcontractor. The subcontractor shall accept the quality management of the general contractor.

    Article 56 The survey and design units of construction projects must be responsible for the quality of their survey and design. Survey and design documents shall comply with the provisions of relevant laws and administrative regulations and the quality and safety standards of construction projects, technical specifications for construction engineering survey and design, and the provisions of the contract. The construction materials, building accessories and equipment selected in the design documents shall indicate their specifications, models, performance and other technical indicators, and their quality requirements must be in line with the standards stipulated by the state.

  4. Anonymous users2024-02-08

    The conditions for bidding the project are as follows: (A) the tenderer has been established in accordance with the law; 2) The preliminary design and budget estimate shall be subject to examination and approval procedures, and have been approved; C) the scope of the bidding, the bidding method and the organizational form of the bidding shall be carried out the approval procedures, has been approved; 4) There are corresponding funds or funds** have been implemented; 5) There are design drawings and technical information required for bidding. "Measures for Bidding and Bidding for Construction of Engineering Construction Projects".

    Article 8 The following conditions shall be met for construction projects that must be tendered according to law:A) the tenderer has been established in accordance with the law; ?

    2) The preliminary design and budget estimate shall be subject to examination and approval procedures, and have been approved; ?3) There are corresponding funds or funds** have been implemented; ?4) There are design drawings and technical information required for bidding.

  5. Anonymous users2024-02-07

    The conditions for bidding the project are as follows: (A) the tenderer has been established in accordance with the law; 2) The preliminary design and budget estimate shall be subject to examination and approval procedures, and have been approved; (C) the bidding model with guessing, bidding methods and bidding organization forms should perform the approval procedures, has been approved; (4) There are corresponding funds or funds to order that the source has been implemented; 5) There are design drawings and technical information required for bidding.

    Measures for Bidding and Bidding for the Construction of Engineering Construction Projects》 Article 8 Engineering construction projects that must be tendered in accordance with the law shall meet the following conditions before they can be tendered for construction:

    A) the tenderer has been established in accordance with the law;

    2) The preliminary design and budget estimate shall be subject to examination and approval procedures, and have been approved;

    3) There are corresponding funds or funds** have been implemented;

    4) There are design drawings and technical information required for bidding.

  6. Anonymous users2024-02-06

    Legal analysis: The conditions for project bidding are as follows: (1) the tenderer has been established in accordance with the law; 2) The preliminary design and budget estimate shall be subject to examination and approval procedures, and have been approved; C) the scope of the bidding, the bidding method and the organizational form of the bidding shall be carried out the approval procedures, has been approved; 4) There are corresponding funds or funds** have been implemented; 5) There are design drawings and technical information required for bidding.

    Legal basis: measures for bidding and bidding for the construction of engineering construction projects》 Article 8 The construction projects that must be tendered in accordance with the law shall meet the following conditions before the construction bidding: (A) the tenderer has been established in accordance with the law; 2) The preliminary design and budget estimate shall be subject to examination and approval procedures, and have been approved; C) the scope of the bidding, the bidding method and the organizational form of the bidding shall be carried out the approval procedures, has been approved; 4) There are corresponding funds or funds** have been implemented; 5) There are design drawings and technical information required for bidding.

Related questions
5 answers2024-06-05

Electrical Engineering (English: Electrical Engineering), abbreviated as EE, is the core discipline and key discipline in the field of modern science and technology. >>>More

10 answers2024-06-05

It is safety, technical, organizational and environmental protection measures.

12 answers2024-06-05

In terms of school, North China Electric Power University is better, and at least five graduate directions in electrical engineering are ranked first. In order for the country to achieve a well-off society in an all-round way in 2020, electricity must go first, electricity is the foundation of the national economy, and electricity is a new and popular major before 2020. This is also illustrated by the employment rate of electricity in recent years.

3 answers2024-06-05

The construction process includes: site five links and one level, construction of temporary facilities, construction drawings review, unit engineering construction plan review and construction preparation, building positioning and pay-off, pile foundation construction (if any), earthwork excavation, pile head treatment and pile foundation test, foundation cushion construction, foundation construction, foundation traffic safety, equipment installation and ancillary system installation, equipment secondary grouting equipment, equipment single commissioning, equipment system commissioning, complete machine commissioning, trial operation, performance test, and production. >>>More

7 answers2024-06-05

Tsinghua University, Huazhong University of Science and Technology, Harbin Institute of Technology, Zhejiang University, Xi'an Jiaotong University, Shandong University, Southeast University, North China Electric Power, Tianjin University, Hunan University, Chongqing University, Wuhan University, Shenyang University of Technology, Hebei University of Technology, Hefei University of Technology, Southwest Jiaotong University, Beijing Jiaotong University, Beihang University, Dalian University of Technology, Northeastern University, Shanghai University, South China University of Technology, Northwest University of Technology, Jiangsu University, Xi'an Institute of Technology, Yanshan University, Harbin Institute of Technology, Zhejiang University of Technology, Fuzhou University, Xinjiang University, Dalian Maritime Affairs.