The walls around the bathroom are waterproofed and brushed to the top, is it so good?

Updated on home 2024-06-28
8 answers
  1. Anonymous users2024-02-12

    In fact, the relative height of the brush can be accurately positioned according to the integrated ceiling, and it is useless if you brush the waterproof architectural coating more than the integrated ceilingIn the case of installing the ceiling in the future, he will use an impact drill or nails to damage the waterproof plating. In fact, this to the construction of the project is done in front of the waterproof, that is, the water and electricity decoration water supply and drainage pipes, water supply and drainage is drinking water and domestic water, the drainage pipe is the industrial wastewater of bathing and washing clothes and pants, we must stipulate that the master must assemble a floor drain in a bathroom, an open floor drain, a dark floor drain, the open floor drain is the common floor tile surface layer of the one, the main purpose of the dark floor drain is to drain the water storage under the floor tile and the waterproof middle, and the dark floor drain is invisible during the construction of the project.

    It is not recommended to use polypropylene as a raw material for wall waterproofing, because polypropylene will harden in the future, it will lead to insufficient uniformity of the connection between the cement mortar and the wall, resulting in the hollowing of the wall tiled in the middle and later stages. More seriously, it will affect everyone's wall tiles falling down! If the bathroom wall is behind the wardrobe of our master bedroom, the wall of the bedroom also needs to be full of waterproof architectural coatings, whether the wooden cabinet is solid wood particle board or multi-layer solid wood board.

    It is waterproof, but it can't withstand the wet cold for a long time. The purpose is to make the waterproofing effect better and prevent water seepage into the wall faster.

    It can prevent the moisture in the bathroom from seeping into other bedrooms according to the wall, and has excellent waterproof effect. For example, next to the bathroom is a bedroom, or a living room, study and other indoor spaces, or a wardrobe, and the bathroom is waterproof to isolate water vapor more quickly. The purpose is to consume raw materials and construction time, and the decoration is high.

    Danger to the fixity of tiles, because the airtightness of waterproof raw materials is the best, the surface is smooth, so the key to the bonding raw materials of tiles and waterproof raw materials bonding, the firmness is slightly worse. Generally, there is no need to do a full wall waterproofing for toilet decoration, because the wall car wading is extremely limited.

    The total area is relatively limited, only in the shower area, the bottom of the wall can be waterproof, the wall in other areas is very little car wading, in addition to the wall itself has a certain degree of leakage, and at the same time there are wall tiles to carry out waterproof and fireproof, now the bathroom decoration wall tiles do tile seams, or porcelain white glue sealing wall bottom, the sealing of the wall waterproof solubility completely meets the application requirements. It is time-consuming and laborious to make a full wall waterproofing, and it has almost zero effect. If you want to wash the waterproofing of the wall of the partition room, you can scrape the waterproof putty powder on the wall to improve the waterproof waterproof membrane of the wall, or brush the waterproof putty on the wall to improve the waterproofness of the wall.

  2. Anonymous users2024-02-11

    So well done. Because this way, the whole bathroom will be very clean and dry, not easy to breed water stains, there will not be many water marks on the walls, and there will be no mold.

  3. Anonymous users2024-02-10

    1. As the position of the owner, if time permits, it is best to be able to be on site in person for the construction link that you are not at ease and can play a good role in supervision. The master carefully checked whether there were any big holes in the wall that needed to be repaired the day before the construction was painted and waterproofed, and the waterproof paint for the big holes could not be filled.

    2 construction is done in front of the waterproof, that is, hydropower construction water supply and drainage, water supply is tap water domestic water, drainage is bathing and washing clothes, these sewage discharge, we must require the master a bathroom must be installed two ground a bright floor drain, a dark floor drain, the open floor drain is the common floor tile surface that, the main purpose of the dark floor drain is to drain the water between the floor tiles and the waterproof, the construction is completed the dark drain is invisible.

  4. Anonymous users2024-02-09

    The waterproofing of the bathroom is important, if it is not done well, there will be great hidden dangers in the subsequent use process, but there is no need to brush the waterproof from the surrounding walls to the top.

  5. Anonymous users2024-02-08

    Hello dear, the bedroom wall near the bathroom should be brushed waterproof. In bathrooms close to bedrooms and other spaces, it is best to paint the entire wall with waterproofing to avoid moisture penetration. When decorating, the bathroom is waterproof, the thickness of the waterproof paint is millimeters, the height of the painting is meters near the shower, and the meters near the wash basin.

    However, in many families, the bathroom is close to the bedroom or cloakroom, so once the bathroom is too damp, it often causes the wall of the adjacent room to be damp, and the wardrobe and wooden baseboard that are close to the wall are also easy to be damp and deformed. Therefore, it is recommended that the bathroom wall near the bedroom and other spaces should be painted with waterproofing as a whole to avoid moisture penetration. What are the waterproof materials 1, polyurethane polyurethane waterproof materials have good environmental protection, comprehensive performance is also very high, do not worry about the use in the bedroom will cause harm to the human body.

    In addition, the polyurethane waterproof material is very easy to paint, and it can be evenly covered on the wall very easily, and it can be repainted. 2. Cement mortar bedroom interior wall cement mortar waterproof material is mainly composed of acrylic emulsion and a variety of admixtures. These materials and cement mortar can have a good waterproofing effect.

    However, it needs to be modulated according to a certain ratio, otherwise the preset effect cannot be achieved. 3. As a two-component waterproof material with both rigidity and flexibility, polymer cement is non-toxic and tasteless, convenient to construct, and has good air permeability, and will not feel stuffy when living in the later stage. Therefore, this kind of bedroom interior wall waterproof material Zen stove is deeply loved by consumers.

  6. Anonymous users2024-02-07

    A must do.

    1) For the residents above the first floor, the waterproof treatment of the bathroom is very important, because once the treatment is not good, because of the bath caused by the ground leakage, downstairs rain, you are impossible to pull the zipper can be easily and simply opened and repaired, at every turn to remove all to do again, the amount of work is large, the loss of funds is high, so the waterproof treatment of the bathroom must be successful once and for all, otherwise the future will be endless.

    2) The ground of the building is reinforced concrete, not an iron plate, and the cement sand and gravel are very fine pores, if not treated, the water will penetrate into the downstairs, so the waterproofing of the ground is the most critical key, absolutely sloppy, in addition, whether the nozzle of the sewer and the ground is tightly bonded will also be because of the negligence and irresponsibility of the workers during the construction and leave trouble, so the ground and sewer nozzle parts are the focus of waterproof construction consideration and attention.

    3) Waterproofing here refers to the waterproofing of the floor and wall of the kitchen, bathroom and balcony. Prevent water leakage into the wall of the downstairs or next room.

    Be responsible for yourself and your neighbors. The floors and walls of kitchens, bathrooms and balconies must be waterproofed.

    4) Water seepage and then tile pasting, the beautifully decorated house is very bad, and the wall is also pasted with tiles, but the water seepage to a certain extent will make the tiles burst and then warp. If you just put the tiles on, you won't see the water seeping, but the water is still seeping into the wall. It is best to seal the root cause of water seepage, that is, the 2-4 cm separation between the outer wall and the neighbor with cement, otherwise the house will be seriously damaged in the future.

  7. Anonymous users2024-02-06

    If the top of the bathroom leaks, the wall will have problems such as mold, odor, and wall expansion for a long time, and it will also affect the relationship with the downstairs neighbors, so the waterproofing project on the top of the bathroom is very important. So,The top of the toilet is waterproofWhat should I do? What to look out for?

    Let's go for it!

    1. What should be done to waterproof the top of the bathroom?

    The next step is to choose air defense as a water-holding material, and try to choose a big brand of waterproof coating, whose quality and after-sales service are better. In addition to this, decorative materials such as cement and mortar should also be prepared.

    Secondly, the construction process can be carried out according to the following steps:

    Step 1: Basic processing

    in doingThe top of the toilet is waterproofPreviously, it was necessary to modify the actual situation such as the waterway circuit. There are also water and electric heating pipes to be leveled to ensure the neatness of the decorative materials. After that, the base surface is flattened and then waterproofed.

    Step 2: Apply waterproof paint for the first time

    Start to apply waterproof coating, brush it for the first time, and firmly bond with the base layer, so that there can be no bubbles, cracks, and falling off. When applying waterproof coatings, the height of the coating layer should be consistent and the thickness should meet the standard.

    Step 3: Brush the waterproof coating a second time

    On the second brush, it must be separated for a while. Wait until the first coat of paint has dried before applying a second coat of paint. If the interval between them is too short, the waterproofing effect will be greatly reduced.

    Step 4: Apply the protective layer

    After applying the waterproof coating, a protective layer is applied to it to avoid damaging the waterproof layer in the later construction. When laying the protective layer, it must be fully covered, without omission, and must be firmly bonded with the base layer.

    1.Before waterproofing the roof of the bathroom, attention must be paid to the cleanliness of the base layer and it must be free of dust, such as mold release agents. And also ensure that the top surface is firm, so that there are no peeling and other problems.

    2.Before the waterproofing treatment of the bathroom, special treatment should be carried out for some gaps in the bathroom.

    3.When the top of the bathroom is waterproof, the wall should also be waterproof. These areas should be waterproofed about 30 cm from the ground to prevent water from seeping into the walls. And it is necessary to do a good job of waterproofing the corners and other details that are easy to be overlooked, and the waterproof layer should be strengthened.

    What should be done and know the problems that need to be paid attention to, only the waterproof effect is better, and the bathroom will not be troubled by water leakage.

    You can get it for free

  8. Anonymous users2024-02-05

    Summary. Hello, I have a query for you.

    After the waterproof coating of the bathroom is painted, the surface should be tested after the surface is dry to ensure that the quality meets the requirements.

    Then the water is drained, and after the surface is dry, you can directly lay floor tiles and wall tiles on it. It is necessary to ensure that the floor drain is around the drain, around the sewer pipe, the wall below the meter of the shower room, and the right angle between the surrounding wall and the ground to prevent water leakage.

    Normally, you still need to put another layer of wall solids or tiles here, so that the effect will be better and more beautiful.

    After the bathroom waterproofing is done, should I brush another layer of wall solid on the waterproof surface?

    Hello, here is Yunqu does not stumble your question, please wait for information inquiries Oh here is in full swing in the search for coarse age information, please wait patiently, if you have any questions, please feel free to send them to me Thank you for your understanding

    Hello, I will inquire about the waterproof coating of the bathroom after being painted, and wait for the surface to dry and test the water to ensure that the quality meets the requirements. Then the water is drained, and after the surface is dry, you can directly lay floor tiles and wall tiles on it. It is necessary to ensure that the floor drain, around the Shanhu sewer pipe, the wall below the meter of the shower room, and the right angle between the surrounding wall and the ground must be carefully constructed to prevent water leakage.

    Normally, you need to put another layer of wall solids or a layer of tiles, so that the effect will be better and more beautiful.

    Hope my potato harvest can help you. Mu hand is cautious and fast

    I am afraid that after the bathroom decoration is waterproofed, I am afraid that the sticky tiles are not inherent, and there is no need to brush the wall again?

    Hold on. Generally, after the wall is waterproofed, it will become smooth and impermeable. In this way, it is easy to cause the tile to be hollow or fall off, so under normal circumstances, the waterproof wall can not be directly tiled.

    In order to apply tiles, it is necessary to brush the waterproof wall, or use tile adhesive to apply tiles. Lamana shouts treatment refers to lime plaster or cement mixed interface agent to make the waterproof wall potholes and high fields, and then directly use cement mortar to paste the tiles.

    You need to do a layer of wall solidification in the middle, according to the above steps to deal with it, at the same time: when the bathroom is tiled, you should also pay attention to the type of tile. Some tiles are sticking to the wall, and some tiles are sticking to the ground.

    It must not be mixed, because the quality and size of the tiles suitable for the wall and the tiles for the floor are not the same. Random use may also lead to tiles not sticking or hollowing.

Related questions
14 answers2024-06-28

Directly on the waterproof paint. And I personally recommend that in the shower room, a position with a lot of water, don't brush to a meter as required, and brush it directly to the top. Stay on the safe side.

16 answers2024-06-28

Bathroom leakage generally does not involve the wall, if you knock on the wall, you only need to pay attention to whether it is a load-bearing wall. However, the waterproofing of the ground should be expanded. The location of the bathroom after expansion must be waterproof!

6 answers2024-06-28

The first step, before the waterproof treatment of the bathroom, the first thing is to level the floor level of the bathroom, the ground is uneven, when the waterproof paint is painted, it may be uneven, or the ground is easy to crack because of unevenness, which will crack with the ground even if the waterproof paint is applied. >>>More

27 answers2024-06-28

To must, when the rough house comes down, the real estate developer is waterproof, but their hydropower location is not in line with their own home, generally have to carry out hydropower transformation, in the hydropower transformation of the original waterproof layer destroyed, the bathroom water consumption, the environment is humid, so the waterproof division must do, the general shower place to do 1800mm, others to do 600mm from the ground, on it.

14 answers2024-06-28

1. Developers use periodic waterproof materials, generally based on polypropylene, with low cost and waterproof life within 5 years. >>>More