The budget officer examination is not a national unified examination

Updated on educate 2024-06-09
5 answers
  1. Anonymous users2024-02-11

    Examinations of a national nature.

    The budget clerk is now called the cost clerk, and it is a national exam, but the exam time and questions are different in each place.

  2. Anonymous users2024-02-10

    The budgeter you are talking about, it includes the civil construction budgeter and the installation budgeter, but now it has been renamed as the cost officer. The five major construction personnel are: construction personnel, budget personnel, material personnel, safety personnel, and quality inspectors. Among these five members, budget workers are better, and their salaries are higher.

    The cost engineer qualification examination is divided into four subjects: "Basic Theory of Engineering Cost Management and Related Regulations", "Engineering Cost Valuation and Control", "Construction Engineering Technology and Measurement", and "Engineering Cost Case Analysis". Among them, "Construction Engineering Technology and Metrology" is divided into two sub-majors: "civil engineering" and "installation", and candidates can choose one of them according to the actual work.

    The cost engineer qualification examination is divided into 4 half-days and is conducted in the form of paper and pencil. The subject of "Engineering Cost Case Analysis" is a subjective question and is answered on the answer sheet, and the test questions of other subjects are objective questions and answered on the answer sheet. Candidates should bring a black ink pen, a 2B pencil, an eraser, and a silent calculator with no text function during the test.

  3. Anonymous users2024-02-09

    The first is to be in good health and between the ages of 18 and 55.

    The second is to have a high school or technical secondary school degree or above.

    The third is to be willing to work in a related management profession or as a budget clerk.

    Job. There are documents to prepare at the time of application.

    1.Identity card.

    On the front and back, if you need academic qualifications, you also need to have a certificate of academic qualifications.

    2.Registration form (issued by the examination teacher at the time of registration).

    3.The electric denier roller version is an inch photo.

    There is no limit to the background color. I have summarized the conditions and work content of applying for the budget officer, the first is to master the management of design budget and construction budget.

    That is, the management of two calculations. Specifically, it is to do a good job in the preparation and comparison of the second calculation, and to prepare the budget for the increase or decrease of the received design changes, technical approval orders, and materials.

    Second, contract issuance control, contract planning, drafting and initiating the corresponding contract approval process for labor and professional contracting, and evaluating the performance of the contract award.

    Third, claim management, if the owner fails to perform or fails to correctly perform the obligations agreed in the contract and causes losses to the builder, the builder shall file a claim for compensation from the owner and draft the claim documents.

    Fourth, project settlement.

    Prepare the project settlement book according to the completion data of the bend to determine the final cost of the project.

    Finally, I wish the students a successful landing.

  4. Anonymous users2024-02-08

    Applicants for the budget clerk need to meet the requirements. dao.The basic conditions are as follows:

    1. Comply with national laws and regulations; 2. Abide by professional ethics; 3. Engage in project cost work; 4. Under the age of 60; 5. Meet one of the following conditions: Technical secondary school or above in engineering cost; College degree or above in related majors and study for more than three years; Have more than one year of experience in other majors, technical secondary school or above, and have worked for more than one year; 6. With the consent of the unit or schoolThose who meet the above conditions can register for the budget officer exam.

  5. Anonymous users2024-02-07

    Applicants for the project budget officer must have a technical secondary school degree or above in engineering or engineering economics; or have a junior or above professional title in engineering or economics; At the same time, we also require that we have been engaged in construction project cost work for at least one year.

Related questions
7 answers2024-06-09

Budgeter refers to the detailed or rough statistics on the most basic labor, materials, machinery and other expenses completed by a project, including taxes, profits, etc. Budgeters are also commonly referred to as building budgeters or civil budgeters. >>>More

13 answers2024-06-09

So many questions·· If you still want to learn all at once about civil engineering, garden installation, steel structure and water conservancy!! >>>More

8 answers2024-06-09

Manual and software are parallel, and any amount can be calculated by software, and of course it may be calculated by hand. Otherwise, how did people work in this area before the arithmetic software came out? Hehe, as for the name of the take-off project of the software upstairs is too vague, it may be that you are not proficient in the use of software. >>>More

14 answers2024-06-09

At present, the application in terms of cost is probably in such a situation: the first type is also the most basic and technically the most mature application, that is, the budget software, which generally needs to enter the quota number and engineering quantity; The second type of software is specifically for the calculation of engineering quantities, the calculation of reinforcement, such as engineering quantity auxiliary calculation software, reinforcement auxiliary calculation software, although this kind of software also needs to manually input the characteristics and dimensions of the drawing, but not only greatly saves the workload, but also improves the accuracy of the results. With the implementation of the "quantity and price separation", "physical method" and the valuation method of the bill of quantities, the calculation of the quantity of the project is becoming more and more complicated, and the workload has also increased greatly, and the application of computers and these software has been inseparable from the work. >>>More

8 answers2024-06-09

Very good, as long as you do this line, you should do anything, the budget is more careful than the construction, you can't miss items, you can't have more than one, the requirements are fast, accurate, good, your first entry is to look at the engineering quantity calculation rules! "Those that should be counted, those included in the project, and those that can't be counted" (because you are more familiar with the construction drawings) The second is the calculation method: according to the construction order. >>>More