About the current budgeter estimator .

Updated on workplace 2024-06-02
8 answers
  1. Anonymous users2024-02-11

    Manual and software are parallel, and any amount can be calculated by software, and of course it may be calculated by hand. Otherwise, how did people work in this area before the arithmetic software came out? Hehe, as for the name of the take-off project of the software upstairs is too vague, it may be that you are not proficient in the use of software.

    In fact, the software calculation is also quite methodical, before drawing the component, define the component, it should be no problem. Yes, the software is still developing, and many items are incomplete, but many can be replaced by other quantities, which is completely fine.

    Handwork is the most primitive method, hehe, I don't need to say more about the benefits.

    The biggest advantage of software calculation is that it is fast, but it is not easy to check the error. This is the development trend.

  2. Anonymous users2024-02-10

    Both manual and software are available, and of course, the software is fast when you are familiar with it, especially for reinforcement calculation. Small-scale, one-story building, installation project hand calculation.

  3. Anonymous users2024-02-09

    There is a manual page and there is software.

    There are many engineering quantities that need to be calculated by hand. However, some engineering quantities can still be calculated using engineering quantity calculation software.

    Quota is the use of software.

  4. Anonymous users2024-02-08

    We still use manual calculations now, and now there is software to calculate, but it is not easy to understand with software calculations for others to see, because the name of the project in the software is too vague (for example, digging earthwork, we calculate sometimes mechanical excavation and manual excavation have to be calculated, handwritten words can be written clearly is mechanical and manual, and there is only "excavation earthwork" in the software, so after typing, you can understand that others have to study it.) There are also some projects in the software that are not available, so we can't count them)

  5. Anonymous users2024-02-07

    1. The certificate is different. The budget officer is a certificate printed by the Hubei Provincial Department of Construction and issued by the Hubei Provincial Department of Construction. The cost clerk is the certificate of the China Cost Consulting Association (China Price Association) and is issued by the Hubei Provincial Cost Management Station.

    2. The budget clerk is a qualified certificate for the training of key positions in the construction industry in Hubei Province, and the certificate can only be issued after passing the examination after participating in the training. The cost officer is the national cost officer qualification certificate, and there is no requirement for training.

    3. The application conditions are different, and the budget staff basically does not limit the application conditions, and does not require relevant work experience. There are strict application conditions for cost personnel, and non-cost majors must have more than one year of cost-related work.

  6. Anonymous users2024-02-06

    The difference between a budgeter and a estimator:

    1. Difference in conceptual understanding: budget is only a single small item within the scope of cost;

    3. The nature of practice is different: as long as the budget clerk has obtained the certificate and seal, it is basically OK, while the cost clerk must be registered, and the local cost management department will manage and continue education and training.

    4. The scope of practice is different: generally speaking, the budget clerk can only work effectively in the local area where the certificate is issued, while the cost clerk is used nationwide.

    In addition, the cost is also divided into cost staff and cost engineers: whether to undertake the project across regions, this is the qualification of the consulting unit, and the cost officer (division) has nothing to do, according to the current practice, the cost of contracting business, across the region must be a class A cost consulting unit. If the cost engineer seal is to be stamped when bidding, it is common for registered cost engineers all over the country; To stamp the cost of the seal (do not specify the cost of the engineer), do not say that the local cost officer chapter is valid, the cost of other provinces and cities will not work.

    The similarities between the two: General in China; are all professional qualifications for pre-settlement audits; Differences:The level is different, the division is higher than the member; The authority is not the same The cost engineer can only prepare but not audit, which means that there is no right to audit, while the cost engineer can; The height of the representative's professional title is different, and the cost engineer is equivalent to the intermediate level.

    The cost clerk is only a junior one.

    The fundamental difference between cost engineer and cost engineer is: cost engineer belongs to the professional qualification set by the state according to law, is the administrative license implemented by the state administrative organs, is the professional market access, and the cost engineer has the right to sign the corresponding cost documents and bear legal responsibility according to law; Cost clerk is a kind of job setting, the cost clerk certificate belongs to the professional level certificate, does not have the nature of administrative licensing, nor is it the market access of professional qualifications, the responsibility of the cost clerk is to assist the cost engineer to complete the cost work, the cost clerk does not have the right to issue independent cost documents.

  7. Anonymous users2024-02-05

    It used to be called a budget officer, but now it is renamed a cost officer, and you only need to take the cost officer certificate.

  8. Anonymous users2024-02-04

    There is no difference. It's just a different name, it used to be called a budget officer, and now it's called a cost officer, and the cost officer needs to be certified

Related questions
13 answers2024-06-02

So many questions·· If you still want to learn all at once about civil engineering, garden installation, steel structure and water conservancy!! >>>More

6 answers2024-06-02

First of all, the cost staff is once every two years, there is no exam in 2012, until 2013, and secondly, you are not a major, it will be more difficult to learn, first of all, you must start from the basics, and the architectural drawings must be able to understand. Quota List Valuation Specifications and Books on Basic Cost Basics. You have a preliminary impression framework, and then talk about whether or not to train for exams, because training is generally aimed at a certain foundation, and what you need is literacy first. >>>More

18 answers2024-06-02

If you have spare energy, you can take the cost test, which is very helpful for you to find a job after graduation, and the general construction engineering major will be relatively broadly employed, it is recommended that you can be admitted to the construction major, and you need to prepare for the course "Basic Knowledge of Engineering Cost", Engineering Measurement and Valuation Practice. CAD and computer level 2 can also be tested, but also a hardware condition for finding a job, the current construction is more used CAD2007,

5 answers2024-06-02

You understand quite right, the certification department responsible for qualification and professional certification is different.

3 answers2024-06-02

The upstairs netizen is purely the word of the super new personal code. The above words are all about my personal experience, and some people actually plagiarized them as they were. >>>More